Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Supply Installation Testing And Commissioning Of Streetlight Luminaries At 5 7 Mld Jackwell At Dattawadi Sankhalim
|
| Description |
Supply Installation Testing And Commissioning Of Streetlight Luminaries At 5 7 Mld Jackwell At Dattawadi Sankhalim
|
| Organisation | DEPARTMENT OF DRINKING WATER | CIRCLE I | DIVISION III - BICHOLIM |
| Tender Id | Login to view |
|
Reference Number |
Login to view |
| Tender Fee | 5000 |
| EMD | 17110 |
| Tender Value | 8.56 Lakh |
| Place | Goa |
| Link | Login to view |
| Start Date | October 12, 2026 23:30 |
| End Date |
Open
21/10/2026
8 days left |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Modification to the existing backwash drain at 5 7 mld wtp at dattawadi sanqulim
Modification to the existing backwash drain at 5 7 mld wtp at dattawadi sanqulim
Read moreDesigning, programming, testing and commisioning of open channel flow meter for parshall flume at 5 7 mld dattawadi sankhlim wtp inlet along with integration to existing software and centralized display
Designing, programming, testing and commisioning of open channel flow meter for parshall flume at 5 7 mld dattawadi sankhlim wtp inlet along with integration to existing software and centralized display
Read moreSupply, installation, testing and commissioning of dg sets, lorry weigh bridge, high mast pole along with luminaries, lt panel and allied works at icp, srimantapur and darranga
Supply, installation, testing and commissioning of dg sets, lorry weigh bridge, high mast pole along with luminaries, lt panel and allied works at icp, srimantapur and darranga
Read moreUrgent supply installation testing and commissioning of 33 kv a.b. switch gear for 5 mva substation at 160 mld salauli water treatment plant.
Urgent supply installation testing and commissioning of 33 kv a.b. switch gear for 5 mva substation at 160 mld salauli water treatment plant.
Read moreSupply, installation, testing and commissioning of rotating assembly for 2 nos. 51.84 mld capacity vertical sewage pump-sets at new globe mill pumping station
Supply, installation, testing and commissioning of rotating assembly for 2 nos. 51.84 mld capacity vertical sewage pump-sets at new globe mill pumping station
Read moreProviding fixing testing and commissioning of probe type ocms as per specifications along with 1 year comprehensive oandm at 4 mld stp lehragaga distt. sangrur
Providing fixing testing and commissioning of probe type ocms as per specifications along with 1 year comprehensive oandm at 4 mld stp lehragaga distt. sangrur
Read moreSupply installation testing and commissioning of 01 no 400 kva cpcb iv plus silent dg set with amf panel at 15 mld stp jharkhandi mahadev gorakhpur
Supply installation testing and commissioning of 01 no 400 kva cpcb iv plus silent dg set with amf panel at 15 mld stp jharkhandi mahadev gorakhpur
Read moreSupply installation testing and commissioning of mono rail span beam suitable for 2 mt loading along with overhead travelling crane for chemical handling at 40 mld wtp podocem
Supply installation testing and commissioning of mono rail span beam suitable for 2 mt loading along with overhead travelling crane for chemical handling at 40 mld wtp podocem
Read moreDesign, supply, construction, installation, testing and commissioning of sewage treatment plant of 1.40 mld at dhalli-ii at ghati mohanpur shimla based on modern sbr technology including entire network
With all contingent civil, including staff quarter, electrical, mechanical, piping and instrumentation works with three months trial run including three-year defect liability period, shimla and operation and maintenance of entire system for 5 years.
Read moreDesign, construction, supply, installation, testing and commissioning of 5.2 mld stp based on sbr with tertiary treatment and providing sewer network in belgaria township including 5 years operation and maintenance (2 years dlp)
Design, construction, supply, installation, testing and commissioning of 5.2 mld stp based on sbr with tertiary treatment and providing sewer network in belgaria township including 5 years operation and maintenance (2 years dlp)
Read moreof your Industry type