Tender Details

Particulars Details
Title
Flood Mitigation Works To The Right Bank Of Coleroon River From Ls 162.208 Km To 162.454 Km And From 162.800 Km To 163.000 Km In Alakkudi Village Of Sirkali Taluk In Mayiladuthurai District
Description
Flood Mitigation Works To The Right Bank Of Coleroon River From Ls 162.208 Km To 162.454 Km And From 162.800 Km To 163.000 Km In Alakkudi Village Of Sirkali Taluk In Mayiladuthurai District
Organisation Government of Tamil Nadu
Tender Id 2023_WRD_389484_1
Reference
Number
NIT No.2/2023-24/LCBC -TNJ./dt.06.11.23
Tender Fee 0
EMD 11.93 Lakh
Tender Value
Place Thanjavur
Link https://tntenders.gov.in
Start Date November 16, 2023 19:00
End Date

11/01/2024 ( Expired 522 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Appointment of issuing bank for a letter of credit

Invitation to act as issuing bank for an aggregate/portfolio letter of credit (lc) to cover three sub-projects, such lc backstopped by a guarantee from the international bank for reconstruction and development (ibrd) to support the sngrbp

Read more
Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode

Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode

Read more
Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode

Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode

Read more
Construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in madhya pradesh on epc mode.

Construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in madhya pradesh on epc mode.

Read more
Cs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.

Cs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.

Read more
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra

Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra

Read more
Construction of 4 lane bypass to vellore town ing from km 47.400 of nh-75 and ending at km 12.650 of nh-38 (length 20.492 km) in the state of tamil nadu.

Construction of 4 lane bypass to vellore town ing from km 47.400 of nh-75 and ending at km 12.650 of nh-38 (length 20.492 km) in the state of tamil nadu.

Read more
Consultancy services for preparation of dpr for widening to 4lane from km 35.00 to km 66.275 from nalagarh to swarghat of nh 105 and spur in the state of hp.

Consultancy services for preparation of dpr for widening to 4lane from km 35.00 to km 66.275 from nalagarh to swarghat of nh 105 and spur in the state of hp.

Read more
Upgradation to two lane with paved shoulder from design ch km 118.813 to 148.810 and km 155.0 to 165.082 bagasara to thangalol section of nh351 in the state of gujarat package iv on epc mode

Upgradation to two lane with paved shoulder from design ch km 118.813 to 148.810 and km 155.0 to 165.082 bagasara to thangalol section of nh351 in the state of gujarat package iv on epc mode

Read more
Consultancy services for pre-construction activities and preparation of detailed project report for development of 2 lane alternate route to bypass dabarkot landslide zone (from km 75.950 to km 80.750) on nh-134 in the state of uttarakhand

Consultancy services for pre-construction activities and preparation of detailed project report for development of 2 lane alternate route to bypass dabarkot landslide zone (from km 75.950 to km 80.750) on nh-134 in the state of uttarakhand

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise