Tender Details
Particulars | Details |
---|---|
Title |
Eradication Of Congress Grass, Herbaceous And Other Wild Growth From Ecocity 1, Ecocity 2, Ecocity 2 (Extension), Medicity, New Chandigarh. From.01.04.2024 To 31.03.2025.
|
Description |
Eradication Of Congress Grass, Herbaceous And Other Wild Growth From Ecocity 1, Ecocity 2, Ecocity 2 (Extension), Medicity, New Chandigarh. From.01.04.2024 To 31.03.2025. &Amp#X0d
&Amp#X0d
|
Organisation | Department of Housing and Urban Development | State Govt. and UT |
Tender Id | 2024_DHUD_119295_1 |
Reference Number |
GMADA/DE(H-2)/177-192 Dt. 01.03.2024 |
Tender Fee | 5901 |
EMD | 1.29 Lakh |
Tender Value | |
Place | ECOCITY-1, ECOCITY-2, ECOCITY-2 (EXTENSION), MEDIC |
Link | https://eproc.punjab.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=243741 |
Start Date | March 02, 2024 18:30 |
End Date |
19/03/2024 ( Expired 398 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Short term maintenance contract from km 17/560 -18/560, km 25/700 -26/350, km 29/200 -29/790, km 32/000 - 37/500, km 42/0-47/0 and 57/0 -58/3 of new nh 181 (coimbatore to gundlupet road) in the state of tamil nadu for the year 2024-2
Short term maintenance contract from km 17/560 -18/560, km 25/700 -26/350, km 29/200 -29/790, km 32/000 - 37/500, km 42/0-47/0 and 57/0 -58/3 of new nh 181 (coimbatore to gundlupet road) in the state of tamil nadu for the year 2024-2
Read moreInternal improvement works of cluster section no. s-376 (package-3) for water supply schemes 1. kawan wali 2. chak rohella 3. mahatam nagar 4. hasta kalan 5. nawan hasta 6. jhanger bhaini (rette wali bhaini) block and distt. fazilka
Providing, stringing out pvc pipes , household connections, water meter, disinfection unit, painting installation of sign board etc. complete in all respect and all other works contgent there to. (under state share/jjm)
Read moreRemoval of silt from soil and moisture conservation structure no. 1 in companywala choe to restore the pondage capacity for the improvement of habitat in north beat of barotiwala block, chandigarh range
Removal of silt from soil and moisture conservation structure no. 1 in companywala choe to restore the pondage capacity for the improvement of habitat in north beat of barotiwala block, chandigarh range
Read moreDnit for providing tap connection to consumers extension and augmentation of water supply system at batala district gurdaspur for distribution network and construction of 0 5 and 2 0 lakh gallon ohsrs under amrut 2 0 scheme part 1
Dnit for providing tap connection to consumers extension and augmentation of water supply system at batala district gurdaspur for distribution network and construction of 0 5 and 2 0 lakh gallon ohsrs under amrut 2 0 scheme part 1
Read moreSurvey and assessment of feasibility for modification of existing 2 ph dc towers to 3-ph dc towers by erecting two extra cross arms as proposed by railway for construction of 132 kv 3-ph dc transmission line from gss kendposi to new tss at kendposi
Survey and assessment of feasibility for modification of existing 2 ph dc towers to 3-ph dc towers by erecting two extra cross arms as proposed by railway for construction of 132 kv 3-ph dc transmission line from gss kendposi to new tss at kendposi
Read moreWidening and heightening of drift from seam-iii to seam-ii, 0le between incline no. 1 to incline no. 2 and cleaning of fallen coal gallery with support of roof in seam-iii of katkona 1 and 2 incline.
Widening and heightening of drift from seam-iii to seam-ii, 0le between incline no. 1 to incline no. 2 and cleaning of fallen coal gallery with support of roof in seam-iii of katkona 1 and 2 incline.
Read moreDi of pipeline from dera chhak to new rob-1 at jagannath area gm office and near rob-24 under iwss, lingaraj area, mcl.
Di of pipeline from dera chhak to new rob-1 at jagannath area gm office and near rob-24 under iwss, lingaraj area, mcl.
Read moreImprovement of amarpur rd block road from gate no-1 to gate no-2 (l-0.450 km) under amarpur rd block during the year 2025-26.sh- widening, gsb,wbm-ii, wbm-iii, pmc(paver machine) and road marking and furniture etc
Improvement of amarpur rd block road from gate no-1 to gate no-2 (l-0.450 km) under amarpur rd block during the year 2025-26.sh- widening, gsb,wbm-ii, wbm-iii, pmc(paver machine) and road marking and furniture etc
Read moreWidening and strengthening of single, intermediate lane to 2 lane from existing chainage (km 100.660 to km 106.540) design chainage (km 78.785 to km 84.600) on nh-123 (new nh no. 507) in the state of uttarakhand
Widening and strengthening of single, intermediate lane to 2 lane from existing chainage (km 100.660 to km 106.540) design chainage (km 78.785 to km 84.600) on nh-123 (new nh no. 507) in the state of uttarakhand
Read moreAnnual maintenance of horticulture works and cutting of parthenium weed grass and other wild growth in urban estate phase1 2 3 4 prtc site rajpura road prtc site nabha road at patiala and pda enclave, sangrur road at dhuri for the year 2025-26
Annual maintenance of horticulture works and cutting of parthenium weed grass and other wild growth in urban estate phase1 2 3 4 prtc site rajpura road prtc site nabha road at patiala and pda enclave, sangrur road at dhuri for the year 2025-26
Read moreof your Industry type