Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Request For Proposal (Rfp) For Conducting Detailed Energy Audit For Existing Msm Es In Nagaland
|
| Description |
Conducting Detailed Energy Audit For Existing Msm Es In Nagaland
|
| Organisation | Nagaland Industrial Development Corporation (NIDC) Management Level | State Govt. and UT |
| Tender Id | 2025_NIDC_749_1 |
|
Reference Number |
BD/RAMP/110/2023/5 |
| Tender Fee | 15000 |
| EMD | 1.5 Lakh |
| Tender Value | |
| Place | Naagaland |
| Link |
View Original Tender Notice
https://nagalandtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=881 |
| Start Date | June 12, 2025 14:30 |
| End Date |
Expired
02/07/2025
Expired 365 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Engagement of third-party agency for conducting external safety audit of natural gas pipeline (ngpl) sections under the iggl north-east gas grid (negg) project
Engagement of third-party agency for conducting external safety audit of natural gas pipeline (ngpl) sections under the iggl north-east gas grid (negg) project
Read moreConstruction of residences for officials, consular area and associated ancillary services in the existing diplomatic complex for embassy of india, ankara
Construction of residences for officials, consular area and associated ancillary services in the existing diplomatic complex for embassy of india, ankara
Read more8322 addition/alteration to existing e and m infrastructure in p-96 building
8322 addition/alteration to existing e and m infrastructure in p-96 building
Read moreRemodelling of existing pump house for sludge drain and construction of stp for supplying treated water to various parks in sunder nagri and adjoining areas.
Read moreConstruction of buildings for phase ia campus at iit palakkad. sh: repairs to mechanical machinery in the existing 525kld stp at h1 block in main campus
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreSupervision consultancy services for existing nh-312 of janipur to bashirhat upto ghojadanha section from km 0.000 to km 327.920 in the state of wb
Supervision consultancy services for existing nh-312 of janipur-omarpur-krishnagar-bongaon-bashirhat upto ghojadanha section from km 0.000 to km 327.920 in the state of west bengal
Read moreConsultancy services for preparation of detailed project report (dpr) for construction of second parallel tube adjacent to existing nagabasti single tube tunnel (ch. 138) for its conversion into twin tube 4 lane configuration in the state of assam
Consultancy services for preparation of detailed project report (dpr) for construction of second parallel tube adjacent to existing nagabasti single tube tunnel (ch. 138) for its conversion into twin tube 4 lane configuration in the state of assam
Read moreCleaning of existing road gullies and allied structures for storm water drainage in the area under the jurisdiction of sde sewerage sub division no. 1 chandigarh at sector 16,17,22,23,24,10 (part) chandigarh for 3 months (ch. to 2215 (np) urban water
Cleaning of existing road gullies and allied structures for storm water drainage in the area under the jurisdiction of sde sewerage sub division no. 1 chandigarh at sector 16,17,22,23,24,10 (part) chandigarh for 3 months (ch. to 2215 (np) urban water
Read moreProject management consultancy services for up-gradation of instrumentation system of cpp units (6, 7 and 8) from existing contronic-3 system to dcs based system and installation of electro hydraulic governing system in cpp turbines
Project management consultancy services for up-gradation of instrumentation system of cpp units (6, 7 and 8) from existing contronic-3 system to dcs based system and installation of electrohydraulic governing system in cpp turbines.
Read moreof your Industry type