| Particulars | Details |
|---|---|
| Title |
Replacement Of Existing Damaged Pvc Fills With New Pvc Fills For 02 Nos Cooling Towers
|
| Description |
Replacement Of Existing Damaged Pvc Fills With New Pvc Fills For 02 Nos Cooling Towers Of Centralized A.C.Plant, At Csir, Ccmb
|
| Organisation | Central Public Procurement Portal 2 |
| Tender Id | 2023_CSIR_172140_1 |
|
Reference Number |
CCMB/WKS-02/23-24 |
| Tender Fee | 0 |
| EMD | 6000 |
| Tender Value | |
| Place | CSIR-CCMB |
| Link |
View Original Tender Notice
https://etenders.gov.in |
| Start Date | October 27, 2023 23:00 |
| End Date |
Expired
22/11/2023
Expired 971 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Replacement of old 11kv panels of (2x10) mva receiving station brein by way of supply, installation, testing and commissioning of new 11kv (2plus4) panel set.
Replacement of old 11kv panels of (2x10) mva receiving station brein by way of supply, installation, testing and commissioning of new 11kv (2plus4) panel set.
Read moreConsultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Read moreConstruction of new platform no. 7 at vadodara(p) ir station adjacent to vadodara hsr station in connection with high speed railway alignment.
Construction of new platform no. 7 at vadodara(p) ir station adjacent to vadodara hsr station in connection with high speed railway alignment.
Read moreConsultancy services for preparation of detailed project report (dpr) for construction of second parallel tube adjacent to existing nagabasti single tube tunnel (ch. 138) for its conversion into twin tube 4 lane configuration in the state of assam
Consultancy services for preparation of detailed project report (dpr) for construction of second parallel tube adjacent to existing nagabasti single tube tunnel (ch. 138) for its conversion into twin tube 4 lane configuration in the state of assam
Read moreSupervision consultancy services for existing nh-312 of janipur to bashirhat upto ghojadanha section from km 0.000 to km 327.920 in the state of wb
Supervision consultancy services for existing nh-312 of janipur-omarpur-krishnagar-bongaon-bashirhat upto ghojadanha section from km 0.000 to km 327.920 in the state of west bengal
Read moreProject management consultancy services for up-gradation of instrumentation system of cpp units (6, 7 and 8) from existing contronic-3 system to dcs based system and installation of electro hydraulic governing system in cpp turbines
Project management consultancy services for up-gradation of instrumentation system of cpp units (6, 7 and 8) from existing contronic-3 system to dcs based system and installation of electrohydraulic governing system in cpp turbines.
Read moreExtension and new construction of staffs quarter and compound wall for p. h. sub-centre at mouza mangi, tq.- pandharkawada, dist.- yavatmal
Extension and new construction of staffs quarter and compound wall for p. h. sub-centre at mouza mangi, tq.- pandharkawada, dist.- yavatmal
Read moreTender for construction improvement of existing rd sktt cl 9 to nhdl specn from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 tf pjt dpk in hp
Tender for construction improvement of existing rd sktt cl 9 to nhdl specn from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 tf pjt dpk in hp
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreDevelopment of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Read moreof your Industry type