Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Renovation Work In Various Labs/Rooms/Offices Etc. In Academic Area At Iit Delhi During The Year Of 2024 2025 (Phase I)
|
| Description |
Renovation Work In Various Labs/Rooms/Offices Etc. In Academic Area At Iit Delhi During The Year Of 2024 2025 (Phase I)
|
| Organisation | Director-Indian Institute of Technology(IIT Delhi) | Central Govt. Ministry/Department |
| Tender Id | 2024_IIT_821411_1 |
|
Reference Number |
IITD/WORKS (SP- 4731)/2024 |
| Tender Fee | 0 |
| EMD | 3.88 Lakh |
| Tender Value | - |
| Place | Indian Institute of Technology Delhi |
| Link |
View Original Tender Notice
https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=863248 |
| Start Date | August 14, 2024 22:30 |
| End Date |
Expired
22/08/2024
Expired 780 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Ktps vii stage-adm-ss-gs-rewiring of various type departmental quaters and offices etc in colony distribution i ii sections as and when required during the fy 2026-27
Ktps vii stage-adm-ss-gs-rewiring of various type departmental quaters and offices etc in colony distribution i ii sections as and when required during the fy 2026-27
Read moreUp-keeping of wash rooms, water closets etc., for spf hostel and g+4 project hostel buildings for the period from october 2026 to march 2027
Up-keeping of wash rooms, water closets etc., for spf hostel and g+4 project hostel buildings for the period from october 2026 to march 2027
Read moreProviding of temporary lightning arrangements, stage and public address system on hire basis and ravana idol for ravana vadha etc., at hanumantuni gudda during the dasara festival in mahabubabad municipality.
Providing of temporary lightning arrangements, stage and public address system on hire basis and ravana idol for ravana vadha etc., at hanumantuni gudda during the dasara festival in mahabubabad municipality.
Read moreEstimate for maintenance of central median at vayupuri central media phase 2 from sri laxmi furniture world to neredmet x road in moulali circle 04 malkajgiri zone mmc for the 12 months during the year 2026 27
Estimate for maintenance of central median at vayupuri central media phase 2 from sri laxmi furniture world to neredmet x road in moulali circle 04 malkajgiri zone mmc for the 12 months during the year 2026 27
Read moreProviding necessary mechanical equipments for aeration unit and components/items in main electrical panels etc to improve operational and energy efficiency of 30 mld stp nallacheruvu as part of 2nd phase of jal hi amrit 2.0 reforms incentives utilization of stps under amrut 2.0 under project division-i, amberpet
Providing necessary mechanical equipments for aeration unit and components/items in main electrical panels etc to improve operational and energy efficiency of 30 mld stp nallacheruvu as part of 2nd phase of jal hi amrit 2.0 reforms incentives utilization of stps under amrut 2.0 under project division-i, amberpet
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Read moreRenovation work in various labs/rooms/offices etc. in academic area at iit delhi during the year of 2023-2024 (phase-i)
Renovation work in various labs/rooms/offices etc. in academic area at iit delhi during the year of 2023-2024 (phase-i)
Read moreRenovation and modification works in various labs / committee rooms in academic area at iit delhi during the year of 2025-2026 (phase-i)
Renovation and modification works in various labs / committee rooms in academic area at iit delhi during the year of 2025-2026 (phase-i)
Read moreReplacing old damaged 600 mm x 600 mm (plus minus 5 percent) size led lights in different labs / offices / rooms in academic area at iit delhi.
Replacing old damaged 600 mm x 600 mm (plus minus 5 percent) size led lights in different labs / offices / rooms in academic area at iit delhi.
Read moreof your Industry type