Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Work Of Radiographic Testing Of Of Boiler Tube Joints During Oh13
|
| Description |
Work Of Radiographic Testing Of Of Boiler Tube Joints During Overhauling Of Unit 13
|
| Organisation | UP Rajya Vidyut Utpadan Nigam Ltd | State Govt. and UT |
| Tender Id | 2025_RVUNL_1060868_1 |
|
Reference Number |
OBR////6000008393/BMD-III |
| Tender Fee | 1180 |
| EMD | 9500 |
| Tender Value | - |
| Place | BTPS OBRA |
| Link |
View Original Tender Notice
https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1932526 |
| Start Date | July 29, 2025 15:30 |
| End Date |
Expired
09/08/2025
Expired 428 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Bmd-service charges for online testing and pressure setting of boiler safety valves of 1x500 mw ktpp unit
Bmd-service charges for online testing and pressure setting of boiler safety valves of 1x500 mw ktpp unit
Read moreBmd-availing the services to carry out various non-destructive examinations (nde) in 1x500mw boiler during upcoming capital overhauls 2026-27
Bmd-availing the services to carry out various non-destructive examinations (nde) in 1x500mw boiler during upcoming capital overhauls 2026-27
Read moreTggenco-btps-stage-ii-bm-division- complete overhauling of burner assemblies of unit-4 boiler during the overhaul in 2026-27
Tggenco-btps-stage-ii-bm-division- complete overhauling of burner assemblies of unit-4 boiler during the overhaul in 2026-27
Read moreBmd-service charges towards deputation of service engineers for supervising the overhauling works of boiler burners, safety valves, hangers and soot blowing system of 1x 500mw boiler during coh works for the year 2026-27
Bmd-service charges towards deputation of service engineers for supervising the overhauling works of boiler burners, safety valves, hangers and soot blowing system of 1x 500mw boiler during coh works for the year 2026-27
Read moreTggenco btps stage ii bm-division- overhauling and servicing of various valves and safety valves in unit-4 boiler during the overhaul in fy 2026-27
Tggenco btps stage ii bm-division- overhauling and servicing of various valves and safety valves in unit-4 boiler during the overhaul in fy 2026-27
Read moreTggenco-ytps(5x800mw)-switchyard transformer yard division-testing of transformer oil samples of various power transformers as and when required during the fy 2026-27
Tggenco-ytps(5x800mw)-switchyard transformer yard division-testing of transformer oil samples of various power transformers as and when required during the fy 2026-27
Read moreKtps-v stage- bm- provide skilled labor, specifically ibr welders and grinders, to replace the boiler tubes in unit-x of the ktps-v stage during the annual overhaul period for the year 2026-27-reg
Ktps-v stage- bm- provide skilled labor, specifically ibr welders and grinders, to replace the boiler tubes in unit-x of the ktps-v stage during the annual overhaul period for the year 2026-27-reg
Read moreKtps vii stage- adm-ss-periodical testing ,painting ,repairs and reconditioning of 40nos argon gas cylinders in outdoor dtores-ii/ss division during the fy 2026-27
Ktps vii stage- adm-ss-periodical testing ,painting ,repairs and reconditioning of 40nos argon gas cylinders in outdoor dtores-ii/ss division during the fy 2026-27
Read moreBmd- removal and re-fixing of insulation including metal cladding on water wall tubes, pent house, steam connected valves and burner area and replacement of refractory at rh rear arch area, manual access doors and other locations of boiler at 1 x 500 mw ktpp unit for the year 2026-27 during capital overhaul works
Bmd- removal and re-fixing of insulation including metal cladding on water wall tubes, pent house, steam connected valves and burner area and replacement of refractory at rh rear arch area, manual access doors and other locations of boiler at 1 x 500 mw ktpp unit for the year 2026-27 during capital overhaul works
Read moreEpc contract for design, supply, erection, commissioning, testing and trial run of coal evacuation system by belt conveyors and dispatch through rapid loading system (rls) with silo at vk chp (6 mtpa), kgm area, including operation and maintenance during the five-year defect liability period (dlp).
Epc contract for design, supply, erection, commissioning, testing and trial run of coal evacuation system by belt conveyors and dispatch through rapid loading system (rls) with silo at vk chp (6 mtpa), kgm area, including operation and maintenance during the five-year defect liability period (dlp).
Read moreof your Industry type