Tender Details

Particulars Details
Title
Construction Of Road From Bali Ma To Kotli By Way Of Earth Work In Cutting/Filling Construction Of 12 Nos 1.00 Mtr Dia H.P Culvert, 02 Nos 3.00 Mtr Span Rcc Culvert R/B Wall, Pacca Drain, Providing And Laying 150mm Thick Gsb, Wbm Gr Ii , 150mm Thick
Description
Construction Of Road From Bali Ma To Kotli By Way Of Earth Work In Cutting/Filling Construction Of 12 Nos 1.00 Mtr Dia H.P Culvert, 02 Nos 3.00 Mtr Span Rcc Culvert R/B Wall, Pacca Drain, Providing And Laying 150mm Thick Gsb, Wbm Gr Ii , 150mm Thick
Organisation Government of Jammu and Kashmir
Tender Id 2023_PWDJK_217204_3
Reference
Number
e-NIT No. 08 of 2023-24 Dated 17/06/2023
Tender Fee 6000
EMD 8.26 Lakh
Tender Value -
Place SUPERINTENDING ENGINEER PWD (RnB) CIRCLE RAJOURI
Link
View Original Tender Notice

https://jktenders.gov.in

Start Date June 17, 2023 23:30
End Date
Expired 03/07/2023

Expired 1198 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Restoration of rain damages onkalhel chatri jungrar road km 0/0 to 7/0 (sh c/o bed plate dirt wall wheel guard railing sabl etc. of 3.00 mtr span culvert at rd 3/380 and5/305 along with wing walls)

Restoration of rain damages onkalhel chatri jungrar road km 0/0 to 7/0 (sh c/o bed plate dirt wall wheel guard railing sabl etc. of 3.00 mtr span culvert at rd 3/380 and5/305 along with wing walls)

Read more
Winter route markers with technical specification as per appx a of ts,pcc cement 43 grade in hdpe bag of 50 kg each conf to is 269 to 1976,coarse sand,40mm stone aggregates,quick setting compound,50mm nominal bore gi pipe 3 mtr long 3 point 65mm thick wt 5 point 10 mtr per rm,50mm gi socket nominal bore gi pipe 100mm long internal and external thread thick 3 point 65mm,ms plate 6mm thick size 150mm into 150mm with 4 hole 10mm dia for u clip,250mm long flat iron stiffeners size 25mm into 3mm,8mm dia u shape rod as per drawing,pp rope 12mm dia specified colour,flurescent tape 3 inch thick size 25 mtr long red yellow and white,anti corrosive primer paint,enamel paint og colour,th,2 feet roller brush,open jaw double ended spanner size 10 into 12mm,2 inch pvc water levelling pipe 100 mtr long,masson trowel 150mm,5 kg hammer,brick line,gurmala 200mm wide and 600mm long,plumb bob,iron bucket 10 ltr capacity,iron tasala pan mortor,kassies,showel

Winter route markers with technical specification as per appx a of ts,pcc cement 43 grade in hdpe bag of 50 kg each conf to is 269 to 1976,coarse sand,40mm stone aggregates,quick setting compound,50mm nominal bore gi pipe 3 mtr long 3 point 65mm thick wt 5 point 10 mtr per rm,50mm gi socket nominal bore gi pipe 100mm long internal and external thread thick 3 point 65mm,ms plate 6mm thick size 150mm into 150mm with 4 hole 10mm dia for u clip,250mm long flat iron stiffeners size 25mm into 3mm,8mm dia u shape rod as per drawing,pp rope 12mm dia specified colour,flurescent tape 3 inch thick size 25 mtr long red yellow and white,anti corrosive primer paint,enamel paint og colour,th,2 feet roller brush,open jaw double ended spanner size 10 into 12mm,2 inch pvc water levelling pipe 100 mtr long,masson trowel 150mm,5 kg hammer,brick line,gurmala 200mm wide and 600mm long,plumb bob,iron bucket 10 ltr capacity,iron tasala pan mortor,kassies,showel

Read more
Winter route markers with technical specification as per appx a of ts,pcc cement 43 grade in hdpe bag of 50 kg each conf to is 269 to 1976,coarse sand,40mm stone aggregates,quick setting compound,50mm nominal bore gi pipe 3 mtr long 3 point 65mm thick wt 5 point 10 mtr per rm,50mm gi socket nominal bore gi pipe 100mm long internal and external thread thick 3 point 65mm,ms plate 6mm thick size 150mm into 150mm with 4 hole 10mm dia for u clip,250mm long flat iron stiffeners size 25mm into 3mm,8mm dia u shape rod as per drawing,pp rope 12mm dia specified colour,flurescent tape 3 inch thick size 25 mtr long red yellow and white,anti corrosive primer paint,enamel paint og colour,th,2 feet roller brush,open jaw double ended spanner size 10 into 12mm,2 inch pvc water levelling pipe 100 mtr long,masson trowel 150mm,5 kg hammer,brick line,gurmala 200mm wide and 600mm long,plumb bob,iron bucket 10 ltr capacity,iron tasala pan mortor,kassies,showel

Winter route markers with technical specification as per appx a of ts,pcc cement 43 grade in hdpe bag of 50 kg each conf to is 269 to 1976,coarse sand,40mm stone aggregates,quick setting compound,50mm nominal bore gi pipe 3 mtr long 3 point 65mm thick wt 5 point 10 mtr per rm,50mm gi socket nominal bore gi pipe 100mm long internal and external thread thick 3 point 65mm,ms plate 6mm thick size 150mm into 150mm with 4 hole 10mm dia for u clip,250mm long flat iron stiffeners size 25mm into 3mm,8mm dia u shape rod as per drawing,pp rope 12mm dia specified colour,flurescent tape 3 inch thick size 25 mtr long red yellow and white,anti corrosive primer paint,enamel paint og colour,th,2 feet roller brush,open jaw double ended spanner size 10 into 12mm,2 inch pvc water levelling pipe 100 mtr long,masson trowel 150mm,5 kg hammer,brick line,gurmala 200mm wide and 600mm long,plumb bob,iron bucket 10 ltr capacity,iron tasala pan mortor,kassies,showel

Read more
Consist of construction of pd type ii size 2.40m x 2.40m,soak pit cover made of 1mm thick ms sheet,manufactured sand,aggregate 20mm,aggregate 40mm,aggregate 63mm,pcc soild blocks size 400mm x 200 mm x 200 mm,angle iron framework,hdpe sheet 400 micron,modular double interlocking shock absorbing fibre impregnated cementitious blocks solid,modular double interlocking shock absorbing fibre impregnated cementitious blocks,modular shock absorbing fibre impregnated concrete blocks interlocking,acrylic polymer waterproof liquid sika fosroc white colour,prefabricated steel door,one single leaf pre fabricated steel door,ismc 200 x 75mm,sliding bullet proof 10 mm armour plate,ismb 150 x75mm 3.3m long,hdpe sand bag of size 75x40 cm sand colour,0.63mm thick ppgi sheets size 810 x 3050mm long,3.00 m long rectangular hollow section size 66x33x2.90 mm,2.30m long rectangular hollow section size 66 x 33 x 2.90mm,150mm long ms angle size 50x50x6mm,hydrophobic poreblocking ingrents,quick setting compound,integral water proofi

Consist of construction of pd type ii size 2.40m x 2.40m,soak pit cover made of 1mm thick ms sheet,manufactured sand,aggregate 20mm,aggregate 40mm,aggregate 63mm,pcc soild blocks size 400mm x 200 mm x 200 mm,angle iron framework,hdpe sheet 400 micron,modular double interlocking shock absorbing fibre impregnated cementitious blocks solid,modular double interlocking shock absorbing fibre impregnated cementitious blocks,modular shock absorbing fibre impregnated concrete blocks interlocking,acrylic polymer waterproof liquid sika fosroc white colour,prefabricated steel door,one single leaf pre fabricated steel door,ismc 200 x 75mm,sliding bullet proof 10 mm armour plate,ismb 150 x75mm 3.3m long,hdpe sand bag of size 75x40 cm sand colour,0.63mm thick ppgi sheets size 810 x 3050mm long,3.00 m long rectangular hollow section size 66x33x2.90 mm,2.30m long rectangular hollow section size 66 x 33 x 2.90mm,150mm long ms angle size 50x50x6mm,hydrophobic poreblocking ingrents,quick setting compound,integral water proofi

Read more
Construction of road from bali ma to kotli by way of earth work in cutting/filling construction of 12 nos 1.00 mtr dia h.p culvert, 02 nos 3.00 mtr span rcc culvert r/b wall, pacca drain, providing and laying 150mm thick gsb, wbm gr-ii , 150mm thick

Construction of road from bali ma to kotli by way of earth work in cutting/filling construction of 12 nos 1.00 mtr dia h.p culvert, 02 nos 3.00 mtr span rcc culvert r/b wall, pacca drain, providing and laying 150mm thick gsb, wbm gr-ii , 150mm thick

Read more
Construction of road from agrati to sawani by way of earth work in cutting/filling construction of 15 nos 1.00 mtr dia h.p culvert, r/b wall, pacca drain, providing and laying 150mm thick gsb, wbm gr-ii , 150mm thick in two layers (75mm thick earc

Construction of road from agrati to sawani by way of earth work in cutting/filling construction of 15 nos 1.00 mtr dia h.p culvert, r/b wall, pacca drain, providing and laying 150mm thick gsb, wbm gr-ii , 150mm thick in two layers (75mm thick earc

Read more
Construction of road from sasalkote to mahari by way of earth work in cutting/filling construction of 06 nos 1.00 mtr dia h.p culvert, r/b wall, pacca drain, providing and laying 150mm thick gsb, wbm gr-ii , 150mm thick in two layers (75mm thick ear

Construction of road from sasalkote to mahari by way of earth work in cutting/filling construction of 06 nos 1.00 mtr dia h.p culvert, r/b wall, pacca drain, providing and laying 150mm thick gsb, wbm gr-ii , 150mm thick in two layers (75mm thick ear

Read more
Construction of road from agrati to sawani by way of earth work in cutting/filling construction of 15 nos 1.00 mtr dia h.p culvert, r/b wall, pacca drain, providing and laying 150mm thick gsb, wbm gr-ii , 150mm thick in two layers (75mm thick earc

Construction of road from agrati to sawani by way of earth work in cutting/filling construction of 15 nos 1.00 mtr dia h.p culvert, r/b wall, pacca drain, providing and laying 150mm thick gsb, wbm gr-ii , 150mm thick in two layers (75mm thick earc

Read more
Construction of road from sasalkote to mahari by way of earth work in cutting/filling construction of 06 nos 1.00 mtr dia h.p culvert, r/b wall, pacca drain, providing and laying 150mm thick gsb, wbm gr-ii , 150mm thick in two layers (75mm thick ear

Construction of road from sasalkote to mahari by way of earth work in cutting/filling construction of 06 nos 1.00 mtr dia h.p culvert, r/b wall, pacca drain, providing and laying 150mm thick gsb, wbm gr-ii , 150mm thick in two layers (75mm thick ear

Read more
Construction of road from sasalkote to mahari by way of earth work in cutting/filling construction of 06 nos 1.00 mtr dia h.p culvert, r/b wall, pacca drain, providing and laying 150mm thick gsb, wbm gr-ii , 150mm thick in two layers (75mm thick ear

Construction of road from sasalkote to mahari by way of earth work in cutting/filling construction of 06 nos 1.00 mtr dia h.p culvert, r/b wall, pacca drain, providing and laying 150mm thick gsb, wbm gr-ii , 150mm thick in two layers (75mm thick ear

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise