Tender Details
About Tender
🏗️ Invitation For Bids: Renovation/Up Gradation Of Stc Bsf Administrative Block 🏢 The Dg, Bsf, Under The Ministry Of Home Affairs, Central Government, Invites Bids From Reputable Contractors For The Renovation And Up Gradation Of The Administrative Block At The Stc Bsf Kharkan Camp, Hoshiarpur. 📅 Bid Submission Deadline: May 29, 2024, 11:00 Am Tender Fee: Inr 22,005 Emd: Inr 5,000 Interested Bidders Must Submit Detailed Proposals, Including Project Execution Plans, Cost Estimates, And Timelines, Adhering To The Specifications Outlined In The Tender Document. Keywords: Renovation, Up Gradation, Stc Bsf, Administrative Block, Bsf Kharkan Camp, Hoshiarpur, Government Tender, Contractor Bid, Emd, Tender FeeParticulars | Details |
---|---|
Title |
Renovation/Up Gradation Of Administrative Block At Stc Bsf Kharkan
|
Description |
Renovation/Up Gradation Of Administrative Block At Stc Bsf Kharkan Camp
|
Organisation | DG,BSF,MHA | Central Govt. Ministry/Department |
Tender Id | 2024_BSF_808282_1 |
Reference Number |
85/NIT/ENGG/FTR-PB/2024-25 |
Tender Fee | 0 |
EMD | 22005 |
Tender Value | |
Place | STC BSF KHARKAN CAMP, HOSHIARPUR |
Link | https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=849474 |
Start Date | May 22, 2024 14:30 |
End Date |
29/05/2024 ( Expired 350 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Rehabilitation and up-gradation of wardha salod hirapur - pulgaon section of nh 347a from km 134.283 to km 159.075 design chainage km 0.000 to km 24.792 to two laning with paved shoulder in the state of maharashtra on epc mode
Rehabilitation and up-gradation of wardha salod hirapur - pulgaon section of nh 347a from km 134.283 to km 159.075 design chainage km 0.000 to km 24.792 to two laning with paved shoulder in the state of maharashtra on epc mode
Read moreRehabilitation and up-gradation to two lane with paved shoulder configuration from km 67.100 to 67.885, km 76.100 to 77.060, km 80.450 to 81.520, km 82.000 to 82.230, km 82.400 to 82.610 and km 96.840 to 98.095 on balance length of 4.51 km long katol
Rehabilitation and up-gradation to two lane with paved shoulder configuration from km 67.100 to 67.885, km 76.100 to 77.060, km 80.450 to 81.520, km 82.000 to 82.230, km 82.400 to 82.610 and km 96.840 to 98.095 on balance length of 4.51 km long katol
Read moreAllotment of space at departure side of terminal building for setting up paid lounge at shirdi airport
Allotment of space at departure side of terminal building for setting up paid lounge at shirdi airport
Read moreContractor risk and cost basis rehabilitation and up gradation to two lanes with paved shoulder four lane configurations for the work of nh 561 a pandharpur mangalwedha marwade umdai from ch. 40.800 to ch.95.136 package no.ii length 54.336 in the sta
Contractor risk and cost basis rehabilitation and up gradation to two lanes with paved shoulder four lane configurations for the work of nh 561 a pandharpur mangalwedha marwade umdai from ch. 40.800 to ch.95.136 package no.ii length 54.336 in the sta
Read moreConstruction of fob at km.61.800 (village lalpur), at km.225.500 at km. 284.340 (village aram sarai), high mast at km. 61.680 and drain from km. 61.400 to km. 61.960 (bhs) on ghaziabad aligarh mainpuri section of nh-34 in the state of up on epc mode
Construction of fob at km.61.800 (village lalpur), at km.225.500 at km. 284.340 (village aram sarai), high mast at km. 61.680 and drain from km. 61.400 to km. 61.960 (bhs) on ghaziabad aligarh mainpuri section of nh-34 in the state of up on epc mode
Read moreConstruction of balance work of widening and strengthening for improvement and up-gradation of nh-709a garhmukteshwar chainage- 83.200 of nh24 to meerut (chainage 9.860 of nh235) including connector to nh-119 package xii in uttar pradesh on epc mode.
Construction of balance work of widening and strengthening for improvement and up-gradation of nh-709a garhmukteshwar chainage- 83.200 of nh24 to meerut (chainage 9.860 of nh235) including connector to nh-119 package xii in uttar pradesh on epc mode.
Read moreRehabilitaion and up gradation of existing km. 98.750 design ch 121.500 to existing km 83.690 design ch 136.500 and from existing km 78.050 design ch 161.281 to pimpalgaon baswant existing km 59.100 design ch. 161.281 to two lane with paved shoulders
Rehabilitaion and up gradation of existing km. 98.750 design ch 121.500 to existing km 83.690 design ch 136.500 and from existing km 78.050 design ch 161.281 to pimpalgaon baswant existing km 59.100 design ch. 161.281 to two lane with paved shoulders
Read moreUpgradation of rural road from hanuman junction to ong3e tikrey g block bus stand at hut bay
Upgradation of rural road from hanuman junction to onge tikrey g block bus stand at pmgsy-iii, batch-i, 2024-25 (package no.an01hb24, length 1.999 km)
Read moreConstruction of 50 bedded critical care hospital block (ccb) under pm-abhim at kokrajhar medical college, kokrajhar, assam
Construction of 50 bedded critical care hospital block (ccb) under pm-abhim at kokrajhar medical college, kokrajhar, assam
Read moreCivil works for renovation of office room and gents washroom at first floor of ms-i , midhani
Civil works for renovation of office room and gents washroom at first floor of ms-i , midhani
Read moreof your Industry type