Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Dismantling And Withdrawal Of 2nd 4000 Gpm Pump Motor Set With Drum Pontoon Set Along With Its 10inch Dia Ms Pipe Line From Jarlahi Patch Sump And Transporting The Same To The F/B For Necessary Repairing And Keep In Safe Place At Phularitand, Ampc.
|
| Description |
Dismantling And Withdrawal Of 2nd 4000 Gpm Pump Motor Set With Drum Pontoon Set Along With Its 10inch Dia Ms Pipe Line From Jarlahi Patch Sump And Transporting The Same To The F/B For Necessary Repairing And Keep In Safe Place At Phularitand, Ampc.
|
| Organisation | Coal India Limited (CIL) |
| Tender Id | 2023_BCCL_287361_1 |
|
Reference Number |
BCCL/GM/AR-I/AM (ENM)/E-TENDER/2023-24/248 |
| Tender Fee | |
| EMD | 2400 |
| Tender Value | |
| Place | ENM DEPARTMENT, BARORA AREA |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in |
| Start Date | August 29, 2023 17:30 |
| End Date |
Expired
09/09/2023
Expired 999 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Dismantling and transporting of damaged drum pontoon from main patch to f/b for repair and transporting fresh pontoon from f/b to main patch and installation of 3000gpm pump on the pontoon with di its existing pipeline at phularitand, ampc.
Dismantling and transporting of damaged drum pontoon from main patch to f/b for repair and transporting fresh pontoon from f/b to main patch and installation of 3000gpm pump on the pontoon with di its existing pipeline at phularitand, ampc.
Read moreDismantling/withdrawal of damaged drum pontoon main patch sump and trans.to f/b for repair and trans.of another pontoon fromf/b to mainpatch and installation/commission of 4000gpm pump on pontoon and diversion its pipe line at main patch, ampc.
Dismantling/withdrawal of damaged drum pontoon main patch sump and trans.to f/b for repair and trans.of another pontoon fromf/b to mainpatch and installation/commission of 4000gpm pump on pontoon and diversion its pipe line at main patch, ampc.
Read moreDismantling, transporting and installation of one set of pontoon with 3000gpm pump motor set from main patch sump to jarlahi sump and erection of its pipe line at phularitand under amp colliery.
Dismantling, transporting and installation of one set of pontoon with 3000gpm pump motor set from main patch sump to jarlahi sump and erection of its pipe line at phularitand under amp colliery.
Read moreShifting of 4000gpm pump motor of jarlahi sump from pontoon and installation on ground level and maintenance of the above pump and reorganise its pipeline and transporting of pontoon to the fb for necessary repairing at phularitand, ampc.
Shifting of 4000gpm pump motor of jarlahi sump from pontoon and installation on ground level and maintenance of the above pump and reorganise its pipeline and transporting of pontoon to the fb for necessary repairing at phularitand, ampc.
Read moreDi of 10inch dia m.s.pipe line along with shifting of 2nd 4000gpm pump motor 03times at jarlahi patch of phularitand, amp colliery.
Di of 10inch dia m.s.pipe line along with shifting of 2nd 4000gpm pump motor 03times at jarlahi patch of phularitand, amp colliery.
Read moreAssembling, transporting and installation of one 4000gpm pump motor set from feeder breaker to jarlahi coal face sump and erection of its delivery line at jarlahi patch, phularitand, amp colliery
Assembling, transporting and installation of one 4000gpm pump motor set from feeder breaker to jarlahi coal face sump and erection of its delivery line at jarlahi patch, phularitand, amp colliery
Read moreDismantling, transporting and installation of two 4000gpm pump motor from old sump to new sump at jarlahi coal face along with erection its pipe line at phularitand under amp colliery.
Dismantling, transporting and installation of two 
 4000gpm pump motor from old sump to new sump 
 at jarlahi coal face along with erection its pipe line at 
 phularitand under amp colliery.
Read more(a)shifting of 02nos. 4000gpm pump motor of jarlahi sump 02times for extraction of coal from floor of the sump (b)lowering 03nos. pontoon along with their pump motor due to gradual decreasing of water level of jarlahi main patch sump,ampc.
(a)shifting of 02nos. 4000gpm pump motor of jarlahi sump 02times for extraction of coal from floor of the sump (b)lowering 03nos. pontoon along with their pump motor due to gradual decreasing of water level of jarlahi 
 main patch sump,ampc.
Read moreAssembling, transporting and installation of one 4000gpm pump motor set from feeder breaker to jarlahi coal face sump and erection of its 10inch dia pipe line at phularitand, amp colliery.
Assembling, transporting and installation of one 4000gpm pump motor set from feeder breaker to jarlahi coal face sump and erection of its 10inch dia pipe line at phularitand, amp colliery.
Read more(a) lowering two 4000gpm pump set of jharna sump (b) installation of two set of drum pontoon in jharna sump and shifting of two set of 4000gpm pump set from ground level to the pontoon(c) maintenance of two ht pump of 3rd patch sump, muraidih, ampc.
(a) lowering two 4000gpm pump set of jharna sump (b) installation of two set of drum pontoon in jharna sump and shifting of two set of 4000gpm pump set from ground level to the pontoon(c) maintenance of two ht pump of 3rd patch sump, muraidih, ampc.
Read moreof your Industry type