Tender Details
Particulars | Details |
---|---|
Title |
Formation Of New Four Lane Cc Road From Yadadri Thermal Power Station To Narketpally Addanki Medarmetla Road (State Highway 2) Bypassing Tallaverappagudem And Damercherla Villages From Km 0/0 To 11/6 In Nalgonda District
|
Description |
Formation Of New Four Lane Cc Road From Yadadri Thermal Power Station To Narketpally Addanki Medarmetla Road (State Highway 2) Bypassing Tallaverappagudem And Damercherla Villages From Km 0/0 To 11/6 In Nalgonda District
|
Organisation | Information Technology Electronics and Communication Department Telangana | State Govt. and UT |
Tender Id | 567559 |
Reference Number |
CE(RB) SR CRN NIT No. 1606-13/DCE(R)/EE-R/DEE-III/AEE-V/2024-25/NLG/1, Dt. 07.01.2025 |
Tender Fee | 29500 |
EMD | 15.63 Lakh |
Tender Value | |
Place | TS |
Link | http://eprocurement.telangana.gov.in/ |
Start Date | January 10, 2025 05:00 |
End Date |
17/01/2025 ( Expired 95 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreConsultancy services of ae for construction of 6-lane patna ring road highway nh-131g from kanhauli to sherpur from km.0.000-km8.480 including junction development with bihta-danapur elevated corridor app.length-1.5 km on epc mode in bihar l-9.98km
Consultancy services of ae for construction of 6-lane patna ring road highway nh-131g from kanhauli to sherpur from km.0.000-km8.480 including junction development with bihta-danapur elevated corridor app.length-1.5 km on epc mode in bihar l-9.98km
Read moreImprovements to kanagal - mall road from km 21/8 to 30/0 (working reach from km 26/6 to 30/0) in nalgonda district
Improvements to kanagal - mall road from km 21/8 to 30/0 (working reach from km 26/6 to 30/0) in nalgonda district
Read moreImprovements to kanagal - mall road from km 18/0 to 30/0 ( working reach from km 18/0 to 26/6) in nalgonda district
Improvements to kanagal - mall road from km 18/0 to 30/0 (working reach from km 18/0 to 26/6) in nalgonda district
Read more(a) improvement from single lane to double lane of konapur to madgula road from km 0/0 to 21/150 in kalwakurthy constituency in ranga reddy district (b) widening strengthening of devarakonda - madgula road from km 18/8 to 34/0 in ranga reddy district.
(a) improvement from single lane to double lane of konapur to madgula road from km 0/0 to 21/150 in kalwakurthy constituency in ranga reddy district (b) widening and strengthening of devarakonda madgula road from km 18/8 to 34/0 in ranga reddy district
Read moreFdr to reconstruction of damaged, narrow pipe culverts from km 0/0 to 10/0 (12nos), construction of drain in kulaspur village limits from km 3/8-10 and strengthening of road in mullangi village limits from km 7/4-8 on mogpal to nh-44 (via) kanjar, kulaspur dichpally railway station road and lead road to kanjar from km 0/0 to 15/4 in nizamabad district.
Fdr to reconstruction of damaged, narrow pipe culverts from km 0/0 to 10/0 (12nos), construction of drain in kulaspur village limits from km 3/8-10 and strengthening of road in mullangi village limits from km 7/4-8 on mogpal to nh-44 (via) kanjar, kulaspur dichpally railway station road and lead road to kanjar from km 0/0 to 15/4 in nizamabad district.
Read moreA)widening and strengthening from two lane to four lane in kalwakurthy town limits of kalwkaurthy- madharam- kadthal road from km 0/0 to 4/5 in kalwakurthy constituency in nagarkurnool district and b)widening and strengthening of kalwakaurthy- madharam- kadthal road from km 4/5 to 22/0 in nagarkurnool district
A)widening and strengthening from two lane to four lane in kalwakurthy town limits of kalwakaurthy- madharam- kadthal road from km 0/0 to 4/5 in kalwakurthy constituency in nagarkurnool district and b)widening and strengthening of kalwakaurthy- madharam- kadthal road from km 4/5 to 22/0 in nagarkurnool district
Read moreSub work for preparation of dpr under main work construction of two lane hlb across manjeera river in between andole, jogipet and ajjamarri village limit at km 3/0 to 3/4 and formation of approach road on either side from km 0/0 to 5/4 of andole to ajjamarri road in sangareddy district
Sub work for preparation of dpr under main work construction of two lane hlb across manjeera river in between andole, jogipet and ajjamarri village limit at km 3/0 to 3/4 and formation of approach road on either side from km 0/0 to 5/4 of andole to ajjamarri road in sangareddy district
Read moreConstruction of new 4 lane with paved shoulder access controlled coastal highway from rameshwar to puri (km.0 to km. 47.340) on hybrid annuity mode in the state of odisha (package i)
Construction of new 4 lane with paved shoulder access controlled coastal highway from rameshwar to puri (km.0 to km. 47.340) on hybrid annuity mode in the state of odisha (package i)
Read moreConstruction of new 6 lane capital region ring road (crrr) from gobindpur near kuspangi (nh 42) to tangi near bandalo toll palza (nh 16) (km. 70.540 to km. 110.870) on hybrid annuity mode in the state of odisha
Construction of new 6 lane capital region ring road (crrr) from gobindpur near kuspangi (nh 42) to tangi near bandalo toll palza (nh 16) (km. 70.540 to km. 110.870) on hybrid annuity mode in the state of odisha
Read moreof your Industry type