Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Different Capacity Rcc Ohr Based On Departmental Design Drawing With 20 Mtr Staging
|
| Description |
Construction Of Different Capacity Rcc Ohr Based On Departmental Design Drawing With 20 Mtr Staging 
Height Including Geo Technical Investigation Foundation Pipeline Connection And Cost Of Pipes Specials Etc 
For Augmentation Of Dif
|
| Organisation | National Projects Construction Corporation Limited | Public Sector Undertakings |
| Tender Id | 2024_NPCC_181041_1 |
|
Reference Number |
NPCC/EZ/PHE/23-24/996 dt. 09.01.24 |
| Tender Fee | 35815 |
| EMD | 30.35 Lakh |
| Tender Value | |
| Place | Canning |
| Link |
View Original Tender Notice
https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=198149 |
| Start Date | January 11, 2024 15:30 |
| End Date |
Expired
17/01/2024
Expired 897 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Design, engineering, supply, installation and commissioning of 757 kwp / 742 kw or above capacity on-grid rooftop solar power plant on 11 identified buildings
Design, engineering, supply, installation and commissioning of 757 kwp / 742 kw or above capacity on-grid rooftop solar power plant on 11 identified buildings
Read moreSupply and installation of 35hp submersible motor with 4500lpm discharge capacity having head 20 meter over area under mc hisar
Supply and installation of 35hp submersible motor with 4500lpm discharge capacity having head 20 meter over area under mc hisar
Read moreRepair and rehabilitation of deopani bridge at km 5.824 construction of rcc covered drains and installation of ms railings on the meka roing section from km 0.00 to km 6.124 of nh-313
Repair and rehabilitation of deopani bridge at km 5.824 construction of rcc covered drains and installation of ms railings on the meka roing section from km 0.00 to km 6.124 of nh-313
Read moreInvestigation survey on gis basis and construction of 300 kld and 900 kld stp with 4 kld co treatment 19 no leach pit each capacity 10 kld i and d structure and drain work in nagar panchayat amethi distt lucknow up india
Investigation survey on gis basis and construction of 300 kld and 900 kld stp with 4 kld co &#x0d treatment 19 no leach pit each capacity 10 kld i and d structure and drain work in nagar &#x0d panchayat amethi distt lucknow up india
Read moreDevelopment of prakram chowk comprising construction of adequate rcc foundation, landscaping and beautification works, and installation of ornamental light fittings with all required electrical and civil components, complete as directed
Development of prakram chowk comprising construction of adequate rcc foundation, landscaping and beautification works, and installation of ornamental light fittings with all required electrical and civil components, complete as directed
Read moreTender for construction improvement of existing rd sktt cl 9 to nhdl specn from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 tf pjt dpk in hp
Tender for construction improvement of existing rd sktt cl 9 to nhdl specn from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 tf pjt dpk in hp
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreConsultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Read moreEngagement of user fee collection agency on the basis of cb through e-tender for ujara fee plaza for widening to 2 lane with paved shoulders and strengthening including construction of cd structures on nh-86 in the state of mp
Engagement of user fee collection agency on the basis of cb through e-tender for ujara fee plaza for widening to 2 lane with paved shoulders and strengthening including construction of cd structures on nh-86 in the state of mp
Read moreSelection of agency for construction, operation, maintenance and management of group toilet at new bus stand, ramgarh cantonment on public-private partnership (ppp) mode with revenue sharing
Selection of agency for construction, operation, maintenance and management of group toilet at new bus stand, ramgarh cantonment on public-private partnership (ppp) mode with revenue sharing
Read moreof your Industry type