Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Set Of Air Duct (Without Air Filters) For 3 Phase Memu/Dmc With Medha Electtic Coaches
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 106259484 |
Reference Number |
12241069 |
Tender Fee | 0 |
EMD | 68620 |
Tender Value | |
Place | New Delhi |
Link | https://www.ireps.gov.in/ireps/supply/pdfdocs/022024/106259484/viewNitPdf_4472354.pdf |
Start Date | February 03, 2024 17:26 |
End Date |
29/02/2024 ( Expired 473 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Aoh kit ep contactor filter on/off. each consist of 7 items 8 nos. (1) cartridge body assly, aal part no. 2220007100/04 - 01 nos (2) rubber o ring valve housing, aal part no. 2220007100/06 - 02 nos (3) rubber o ring piston sm, aal part no. 2220007100/07 - 01 no (4) rubber o ring cylinder sm, aal part no. 2220007100/05 - 01 no. (5) rubber o ring air conn, aal part no. 2220007100/08 - 01 no. (6) seal piston sm, aal partno. 2220007100/09 - 01 no. (7) rubber cap, aal part no. 2220007100/10 - 0
For complete deion and other details, please refer to tender
Read moreJp/b862-000-pf-t-4350/1018 - compressed air and cryogenic nitrogen plant package for pdh-pp plant with ethane and propane storage and handling facilities at dahej, gujarat of m/s petronet lng limited (pll)
Compressed air and cryogenic nitrogen plant package for pdh-pp plant with ethane and propane storage and handling facilities at dahej, gujarat of m/s petronet lng limited (pll)
Read morePackage-1, works of boundary survey and marking, gates chain link fencing of pss with compound walls and gates all around the periphery of 2x 300mw phase-ii solar power park for the development of 1200mw jalaun solar power park under umrepp
Works of boundary survey and marking, gates chain link fencing of pss with compound walls and gates all around the periphery of 2x 300mw (phase-ii) solar power park for the development of 1200mw jalaun solar power park at pathrahi and amrod in jalaun
Read moreSupply of topographical equipments for hiu, wrd under airbmp lot 3 supply of waterproof and handheld gps with accessories for hiu, wrd under airbmp
Supply of topographical equipments for hiu, wrd under airbmp&#x0d lot 3 supply of waterproof and handheld gps with accessories for hiu, wrd under airbmp
Read moreDevelopment of internal infrastructure for uttar pradesh defence industrial corridor, aligarh node, phase ii with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode.
Development of internal infrastructure for uttar pradesh defence industrial corridor, aligarh node, phase ii with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode.
Read moreProvision of external electric supply with standby dg set and allied works for immols sdc at 27 ed af palam under ge (af) gurgaon no 1
Provision of external electric supply with standby dg set and allied works for immols sdc at 27 ed af palam under ge (af) gurgaon no 1
Read moreSitc of silent dg sets of different capacity with amf panel including exhaust pipe line and necessary ei work against different important buildings in the premises of ipgmer - sskm hospital --------- s and d of dg set for upcoming loads (ei work).
Sitc of silent dg sets of different capacity with amf panel including exhaust pipe line and necessary ei work against different important buildings in the premises of ipgmer - sskm hospital --------- s and d of dg set for upcoming loads (ei work).
Read moreHiring of 10 nos hydraulic excavator cum loader for a total of 9977 hrs with operator and without fuel under 19 brtf, project dantak in bhutan
Hiring of 10 nos hydraulic excavator cum loader for a total of 9977 hrs with operator and without fuel under 19 brtf, project dantak in bhutan
Read moreDesign manufacture supply installation testing commissioning training and maintenance of station level equipment of afc system for cmrl phase ii - corridor 3 and corridor 5 including replacement and retrofitting of phase i station level equipment.
Design manufacture supply installation testing commissioning training and maintenance of station level equipment of afc system for cmrl phase ii - corridor 3 and corridor 5 including replacement and retrofitting of phase i station level equipment.
Read moreof your Industry type