Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Machining And Keyway Cutting Of Dog Clutch Coupling Of Size C 276 And Geared Grid Couplings For Conveyor Drives As And When Required For A Period Of 730 Days 02 Years At Chp, Bina Project Ncl
|
| Description |
Machining And Keyway Cutting Of Dog Clutch Coupling Of Size C 276 And Geared Grid Couplings For Conveyor Drives As And When Required For A Period Of 730 Days 02 Years At Chp, Bina Project Ncl
|
| Organisation | Coal India Limited (CIL) |
| Tender Id | 2023_NCL_294081_1 |
|
Reference Number |
B/EM/eTender/2023-24/28 dated 19.11.2023 |
| Tender Fee | |
| EMD | 5315 |
| Tender Value | |
| Place | Office of Staff Officer (EM), Bina |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in |
| Start Date | November 21, 2023 14:30 |
| End Date |
Expired
04/12/2023
Expired 945 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Machining and keyway cutting of dog clutch coupling of size c 276 and geared grid couplings for conveyor drives as and when required for a period of 730 days 02 years at chp, bina project ncl
Machining and keyway cutting of dog clutch coupling of size c-276 and geared grid couplings for conveyor drives as and when required for a period of 730 days 02 years at chp, bina project ncl.
Read moreCarrying out the structural steel work in all sections of chp, bina project (ncl) on as and when required basis within 730 days.
Carrying out the structural steel work in all sections of chp, bina project (ncl) on as and when required basis within 730 days.
Read moreDismantling/ disassembling, re-erection, re-installation, setting and alignment of assemblies / sub-assemblies after repairing on as and when required basis for the period of 730 days (two years) in chp phase 1, khadia project (ncl)
Dismantling/ disassembling, re-erection, re-installation, setting and alignment of assemblies / sub-assemblies after repairing on as and when required basis for the period of 730 days (two years) in chp phase 1, khadia project (ncl)
Read moreDismantling / dis-assembling, re-erection, re-installation, setting and alignment of assemblies / sub-assemblies after repairing on as and when required basis within 730 days two years at chp, bina project
Dismantling / dis-assembling, re-erection, re-installation, setting and alignment of assemblies / sub-assemblies after repairing on as and when required basis within 730 days two years at chp, bina project
Read moreRepair and maintenance of telecommunication network on as and when required basis for a period of two years (730 days) at khadia project.
Repair and maintenance of telecommunication network on as and when required basis for a period of two years (730 days) at khadia project.
Read moreLaying of conveyor belting and stacking of damaged/worn out belting 1600mm wide of different conveyor belts for two years(730 days) at nigahi chp.
Laying of conveyor belting and stacking of damaged/worn out belting 1600mm wide of different conveyor belts for two years(730 days) at nigahi chp.
Read moreMaintenance repairing work of ckt no2 3 4 5 6 7 and c3 belt conveyor at chp bharatpur ocp for a period of 2 years 730 days
Maintenance repairing work of ckt no2 3 4 5 6 7 and c3 belt conveyor at chp bharatpur ocp for a period of 2 years 730 days
Read moreLaying and replacement of n/n conveyor belting (as and when required) in chp, bina project (labour charges only)
Laying and replacement of n/n conveyor belting (as and when required) in chp, bina project (labour charges only)
Read moreRepair and maintenance of telecommunication network on as and when required basis for a period of two years (730 days) at khadia project
Repair and maintenance of telecommunication network on as and when required basis for a period of two years (730 days) at khadia project
Read moreTesting and caliberation of protective relays, cts, pts along with testing of transformer oil installed in substations of bina project for period of two years (730 days)
Testing and caliberation of protective relays, cts, pts along with testing of transformer oil installed in substations of bina project for period of two years (730 days)
Read moreof your Industry type