Tender Details

Particulars Details
Title
Machining And Keyway Cutting Of Dog Clutch Coupling Of Size C 276 And Geared Grid Couplings For Conveyor Drives As And When Required For A Period Of 730 Days 02 Years At Chp, Bina Project Ncl
Description
Machining And Keyway Cutting Of Dog Clutch Coupling Of Size C 276 And Geared Grid Couplings For Conveyor Drives As And When Required For A Period Of 730 Days 02 Years At Chp, Bina Project Ncl
Organisation Coal India Limited (CIL)
Tender Id 2023_NCL_294081_1
Reference
Number
B/EM/eTender/2023-24/28 dated 19.11.2023
Tender Fee
EMD 5315
Tender Value
Place Office of Staff Officer (EM), Bina
Link
View Original Tender Notice

https://coalindiatenders.nic.in

Start Date November 21, 2023 14:30
End Date
Expired 04/12/2023

Expired 945 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Machining and keyway cutting of dog clutch coupling of size c 276 and geared grid couplings for conveyor drives as and when required for a period of 730 days 02 years at chp, bina project ncl

Machining and keyway cutting of dog clutch coupling of size c-276 and geared grid couplings for conveyor drives as and when required for a period of 730 days 02 years at chp, bina project ncl.

Read more
Carrying out the structural steel work in all sections of chp, bina project (ncl) on as and when required basis within 730 days.

Carrying out the structural steel work in all sections of chp, bina project (ncl) on as and when required basis within 730 days.

Read more
Dismantling/ disassembling, re-erection, re-installation, setting and alignment of assemblies / sub-assemblies after repairing on as and when required basis for the period of 730 days (two years) in chp phase 1, khadia project (ncl)

Dismantling/ disassembling, re-erection, re-installation, setting and alignment of assemblies / sub-assemblies after repairing on as and when required basis for the period of 730 days (two years) in chp phase 1, khadia project (ncl)

Read more
Dismantling / dis-assembling, re-erection, re-installation, setting and alignment of assemblies / sub-assemblies after repairing on as and when required basis within 730 days two years at chp, bina project

Dismantling / dis-assembling, re-erection, re-installation, setting and alignment of assemblies / sub-assemblies after repairing on as and when required basis within 730 days two years at chp, bina project

Read more
Repair and maintenance of telecommunication network on as and when required basis for a period of two years (730 days) at khadia project.

Repair and maintenance of telecommunication network on as and when required basis for a period of two years (730 days) at khadia project.

Read more
Laying of conveyor belting and stacking of damaged/worn out belting 1600mm wide of different conveyor belts for two years(730 days) at nigahi chp.

Laying of conveyor belting and stacking of damaged/worn out belting 1600mm wide of different conveyor belts for two years(730 days) at nigahi chp.

Read more
Maintenance repairing work of ckt no2 3 4 5 6 7 and c3 belt conveyor at chp bharatpur ocp for a period of 2 years 730 days

Maintenance repairing work of ckt no2 3 4 5 6 7 and c3 belt conveyor at chp bharatpur ocp for a period of 2 years 730 days

Read more
Laying and replacement of n/n conveyor belting (as and when required) in chp, bina project (labour charges only)

Laying and replacement of n/n conveyor belting (as and when required) in chp, bina project (labour charges only)

Read more
Repair and maintenance of telecommunication network on as and when required basis for a period of two years (730 days) at khadia project

Repair and maintenance of telecommunication network on as and when required basis for a period of two years (730 days) at khadia project

Read more
Testing and caliberation of protective relays, cts, pts along with testing of transformer oil installed in substations of bina project for period of two years (730 days)

Testing and caliberation of protective relays, cts, pts along with testing of transformer oil installed in substations of bina project for period of two years (730 days)

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise