Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Kiifb Four Laning Of Vazhayila Pazhakutty
|
| Description |
Patch Rectification
|
| Organisation | Kerala Road Fund Board | State Govt. and UT |
| Tender Id | 2024_KRFB_684092_1 |
|
Reference Number |
PWD/KR/TR/21159/2023_5_1_1/1 |
| Tender Fee | 1860 |
| EMD | 21055 |
| Tender Value | |
| Place | Thiruvana |
| Link |
View Original Tender Notice
https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1068154 |
| Start Date | August 17, 2024 22:45 |
| End Date |
Expired
22/08/2024
Expired 683 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Engagement of user fee agency through e-tender at mohana toll plaza at km 58.035 for the project four laning of gohana-sonepat section of nh-352a (pkg-ii) from km 40.601 to km 78.837 (length 38.236 km) in the state of haryana
Engagement of user fee agency through e-tender at mohana toll plaza at km 58.035 for the project four laning of gohana-sonepat section of nh-352a (pkg-ii) from km 40.601 to km 78.837 (length 38.236 km) in the state of haryana
Read moreConsultancy services for preparation of detailed project report for 4-laning of katra reasi mahore gulabgarh nandimarg to kulgam to nh44 in the ut of j-k
Consultancy services for preparation of detailed project report for 4-laning of katra reasi mahore gulabgarh nandimarg to kulgam to nh44 in the ut of j-k
Read moreDevelopment, maintenance, management and operation of greenfield high-speed corridor from mawlyngkhung (near shillong) in meghalaya to panchgram (near silchar) in assam by 4-laning with paved shoulders on hybrid annuity basis. (package-3)
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreConsultancy work for preparation of detailed project report (dpr) including land acquisition and detailed design and drawings of all required structures coming in alignment for construction of a new four lane road from madarpur road to new riico btp
Consultancy work for preparation of detailed project report (dpr) including land acquisition and detailed design and drawings of all required structures coming in alignment for construction of a new four lane road from madarpur road to new riico btp
Read moreProvision of auxiliary transformer for interlocking of lc gates of hubli division.
For complete deion and other details, please refer to tender
Read moreIndigenous development of filtering cartridge of lltr
Indigenous development of filtering cartridge of lltr
Read moreExpression of interest (eoi) for indigenous development of avionic aggregates of mig-29 fleets
Expression of interest (eoi) for indigenous development of avionic aggregates of mig-29 fleets
Read moreProvn of klp (ph-i of two phase) of mi at hisar mil stn
Provn of klp (ph-i of two phase) of mi at hisar mil stn
Read moreStudy of survival and growth behavior of chikhri
Study of survival and growth behavior of chikhri ( buxus wallichiana ) by way of fencing and planting
Read moreof your Industry type