Tender Details
Particulars | Details |
---|---|
Title |
Drilling Of 02 Nos. Bore Holes Of Dia 12 (60 Mtr Each) And Lowering Of 8 Dia Casing Pipe For Depth Of 62 Mtr (Each) In Bartarai Colliery, Amadnad Ug Sub Area.
|
Description |
Drilling Of 02 Nos. Bore Holes Of Dia 12 (60 Mtr Each) And Lowering Of 8 Dia Casing Pipe For Depth Of 62 Mtr (Each) In Bartarai Colliery, Amadnad Ug Sub Area.
|
Organisation | South Eastern Coalfields Limited | Public Sector Undertakings |
Tender Id | 2025_SECL_333554_1 |
Reference Number |
SECL/JK/GM(O)/24-25/eT/54 Dtd. 29.03.2025 |
Tender Fee | 0 |
EMD | 4900 |
Tender Value | |
Place | Bartarai Colliery, Amadand UG Sub Area, JK Area |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=345756 |
Start Date | March 30, 2025 19:00 |
End Date |
10/04/2025 ( Expired 11 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Drilling of bore hole by dth combination rig of 200 mm dia supply and installation of energy efficient submersible pump sets panels cables and other allied works including comm and testing of tw in sub division todaraisingh under malpura
Drilling of bore hole by dth combination rig of 200 mm dia supply and installation of energy efficient submersible pump sets panels cables and other allied works including comm and testing of tw in sub division todaraisingh under malpura
Read moreDrilling of bore hole by dth combination rig of 200 mm dia supply and installation of energy efficient submersible pump sets panels cables and other allied works including comm and testing of tw in sub div malpura under jurisdiction malpura
Drilling of bore hole by dth combination rig of 200 mm dia supply and installation of energy efficient submersible pump sets panels cables and other allied works including comm and testing of tw in sub div malpura under jurisdiction malpura
Read moreEngineering, supply, erection, commissioning and testing of scada-dms automation package for two (02) nos. central control centre and 24 nos. sub-stations towards supervision and control of 11 kv network in dvc command area on turnkey basis
Engineering, supply, erection, commissioning and testing of scada-dms automation package for two (02) nos. central control centre and 24 nos. sub-stations towards supervision and control of 11 kv network in dvc command area on turnkey basis
Read moreJjm scheme under kathalia block/ sh construction of 8 (eight) nos. small bore deep tube well (sbdtw) (125mm x 100mm dia) along with installation of pump set, distribution of pipe line system and other allied work etc. within the jurisdiction of dws
Jjm scheme under kathalia block/ sh construction of 8 (eight) nos. small bore deep tube well (sbdtw) (125mm x 100mm dia) along with installation of pump set, distribution of pipe line system and other allied work etc. within the jurisdiction of dws
Read moreJjm scheme under kathalia block/ sh construction of 8 (eight) nos. small bore deep tube well (sbdtw) (125mm x 100mm dia) along with installation of pump set, distribution of pipe line system and other allied work etc. within the jurisdiction
Jjm scheme under kathalia block/ sh construction of 8 (eight) nos. small bore deep tube well (sbdtw) (125mm x 100mm dia) along with installation of pump set, distribution of pipe line system and other allied work etc. within the jurisdiction
Read moreConstruction and commissioning of hand pump for drilling of 100 125mm dia nominal bore holes for hand pump and installation of india mark-ii extra deep well hand pumps complete including construction of platform in urban and rural area pratapgarh
Construction and commissioning of hand pump for drilling of 100 125mm dia nominal bore holes for hand pump and installation of india mark-ii extra deep well hand pumps complete including construction of platform in urban and rural area pratapgarh
Read moreInstallation of 03 (three) nos. endless haulage at (9r/16xcut, 41r/25xcut and 49r/25xcut) mk seam and two-time complete pulley shifting of haulage installed at 49r/25xcut in every 200m at bhadra 7/8 ug mine, bhadra sub-area, jamuna kotma area.
Installation of 03 (three) nos. endless haulage at (9r/16xcut, 41r/25xcut and 49r/25xcut) mk seam and two-time complete pulley shifting of haulage installed at 49r/25xcut in every 200m at bhadra 7/8 ug mine, bhadra sub-area, jamuna kotma area.
Read moreRepair and maintenance of 02 nos. css-type quarters (css-07 and css-09) in argada colony under sirka colliery, argada area.
Repair and maintenance of 02 nos. css-type quarters (css-07 and css-09) in argada colony under sirka colliery, argada area.
Read moreTransportation, laying and fixing of 4 inch dia. pipeline for supplying water for cm machine operation in proposed depillaring panel cm-4a, cm-4b and cm-5 panel at vindhya ug mine, pinoura sub area, johilla area
Transportation, laying and fixing of 4 inch dia. pipeline for supplying water for cm machine operation in proposed depillaring panel cm-4a, cm-4b and cm-5 panel at vindhya ug mine, pinoura sub area, johilla area
Read moreLaying of 02 nos of additional 10 inch dia pipeline ranges for dewatering of mines of lingaraj ocp as per the direction of engineer in charge, lingaraj ocp, lingaraj area, mcl.
Laying of 02 nos of additional 10 inch dia pipeline ranges for dewatering of mines of lingaraj ocp as per the direction of engineer in charge, lingaraj ocp, lingaraj area, mcl.
Read moreof your Industry type