Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Signalling Work In Connection With Trr(p), Tsr(p), Ctr(s), Trr(s) Works In The Section Of Dste/Cnb In Praygraj Division.
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 77278088 |
Reference Number |
PRYJ-Sig-211-2024-25 |
Tender Fee | 0 |
EMD | 1.85 Lakh |
Tender Value | |
Place | Allahabad |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/112024/77278088/viewNitPdf_4707369.pdf |
Start Date | October 05, 2024 20:56 |
End Date |
05/11/2024 ( Expired 224 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of mandla - nainpur section of nh 543 from km 190/400 to km 236/500 to 2l with ps configuration in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of mandla - nainpur section of nh 543 from km 190/400 to km 236/500 to 2l with ps configuration in the state of madhya pradesh on epc mode
Read moreConsultancy services for authoritys engineer for supervision of work of rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to 2l with ps in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to 2l with ps in the state of madhya pradesh on epc mode
Read moreRehabilitation and up-gradation to 2 lane with paved shoulder configuration for the work of charthana jintur section of nh 752 i from design km.25 100 to 47 100 design length 22 00 km in the state of maharashtra on epc mode
Rehabilitation and up-gradation to 2 lane with paved shoulder configuration for the work of charthana jintur section of nh 752 i from design km.25 100 to 47 100 design length 22 00 km in the state of maharashtra on epc mode
Read moreCarrying out piping and equipmnt erection works on sub contract basis in connection with composite works for aromatic pipeline and jetty works (part-b) for offsite pipelines and jetty infrastructure projects for aromatic complex of mrpl ltd.mangaluru
Carrying out piping and equipmnt erection works on sub contract basis in connection with composite works for aromatic pipeline and jetty works (part-b) for offsite pipelines and jetty infrastructure projects for aromatic complex of mrpl ltd.mangaluru
Read moreCarrying out piping and equipmnt erection works on sub contract basis in connection with composite works for aromatic pipeline and jetty works (part-b) for offsite pipelines and jetty infrastructure projects for aromatic complex of mrpl ltd mangaluru
Carrying out piping and equipmnt erection works on sub contract basis in connection with composite works for aromatic pipeline and jetty works (part-b) for offsite pipelines and jetty infrastructure projects for aromatic complex of mrpl ltd mangaluru
Read moreConstruction of road in connection with darrang at niz-mangalbeisa road under pwd, udalguri (r and b) division. (tn_81_1)
Construction of road in connection with darrang at niz-mangalbeisa road under pwd, udalguri (r and b) division under mudwibari constituency under sopd (g) for 2021-22 (part-i from ch. 0.00m to ch. 700.00m) and (part -ii from ch. 0.00m to ch. 600.00m)
Read moreSupply and stacking of stone boulders, smetal 40 mm, schips 20 mm, 10 mm, and sand for pmt works and smetal 63 mm, 45 mm, 26.5 mm, s/chips 13.2 mm, 6.7 mm and sand for surf work for bp-160 between km 0.000 to 10.000 in the state arunachal pradesh
Supply and stacking of stone boulders, smetal 40 mm, schips 20 mm, 10 mm, and sand for pmt works and smetal 63 mm, 45 mm, 26.5 mm, s/chips 13.2 mm, 6.7 mm and sand for surf work for bp-160 between km 0.000 to 10.000 in the state arunachal pradesh
Read moreConstr of rail flyover b/w aligarh jction station and harduaganj station comprising earthwork in formation, p-way, minor bridges, ror, bndry wall, new manzoorgarhi stationyard devt in connection with constr of rfo-4 under ncr,ministry of railys,g.o.i
Constr of rail flyover b/w aligarh jction station and harduaganj station comprising earthwork in formation, p-way, minor bridges, ror, bndry wall, new manzoorgarhi stationyard devt in connection with constr of rfo-4 under ncr,ministry of railys,g.o.i
Read moreSitc of silent dg sets of different capacity with amf panel including exhaust pipe line and necessary ei work against different important buildings in the premises of ipgmer - sskm hospital --------- s and d of dg set for upcoming loads (ei work).
Sitc of silent dg sets of different capacity with amf panel including exhaust pipe line and necessary ei work against different important buildings in the premises of ipgmer - sskm hospital --------- s and d of dg set for upcoming loads (ei work).
Read moreRfp for the work of improvement and up-gradation to two lane with paved shoulder configuration from existing km.7.410 to km. 56.245(design chainage km 0.000 to km.49.235) hadia chauraha to karmaini ghat section of nh-328 in the state of uttar pradesh
Rfp for the work of improvement and up-gradation to two lane with paved shoulder configuration from existing km.7.410 to km. 56.245(design chainage km 0.000 to km.49.235) hadia chauraha to karmaini ghat section of nh-328 in the state of uttar pradesh
Read moreof your Industry type