Tender Details
Particulars | Details |
---|---|
Title |
Providing, Laying And Compaction Of Bituminious Ready Mix (Hmp) Concrete 30 Mm Thick After Applying Tack Coat Including Correction Works With Bm 50 Mm Thick Layer Between Km 0.000 To Km 18.825 (Net Linear Length 18.783 Km) On Road Walong Helmet Top
|
Description |
Providing, Laying And Compaction Of Bituminious Ready Mix (Hmp) Concrete 30 Mm Thick After Applying Tack Coat Including Correction Works With Bm 50 Mm Thick Layer Between Km 0.000 To Km 18.825 (Net Linear Length 18.783 Km) On Road Walong Helmet Top
|
Organisation | Dte General Border Roads Organisation | Central Govt. Ministry/Department |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 0 |
EMD | 4.71 Lakh |
Tender Value | |
Place | km 0.00 to 18.825 on road walong helmet |
Link |
AAAAAAAAAA Login to view |
Start Date | April 15, 2025 17:30 |
End Date |
21/04/2025 ( 1 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Provid, lay, spreading and compaction dbm 50 mm thick, bc 40 mm thick (all compacted thickness), prime coat and tack coat as per morth specification at 2.500 km from katra (net length 1.100 km) under 69 rcc/35 brtf/project sampark in jk 2nd call
Provid, lay, spreading and compaction dbm 50 mm thick, bc 40 mm thick (all compacted thickness), prime coat and tack coat as per morth specification at 2.500 km from katra (net length 1.100 km) under 69 rcc/35 brtf/project sampark in jk 2nd call
Read moreProv,lay nd comp of readymade bituminous (hmp) mix for bm 50 mm tk layer, bc 30 mm tk layer, rd mark wd tp paint 2.5 mm tk for resurf wks on rd kulwanta-r-c peak bet km 0.000 to 10.600 in 69 rcc/35 brtf/p sampark jk 2nd call
Prov,lay nd comp of readymade bituminous (hmp) mix for bm 50 mm tk layer, bc 30 mm tk layer, rd mark wd tp paint 2.5 mm tk for resurf wks on rd kulwanta-r-c peak bet km 0.000 to 10.600 in 69 rcc/35 brtf/p sampark jk 2nd call
Read moreProviding, laying and compaction of bituminious ready mix (hmp) concrete 30 mm thick after applying tack coat including correction works with bm 50 mm thick layer between km 0.000 to km 18.825 (net linear length 18.783 km) on road walong - helmet top
Providing, laying and compaction of bituminious ready mix (hmp) concrete 30 mm thick after applying tack coat including correction works with bm 50 mm thick layer between km 0.000 to km 18.825 (net linear length 18.783 km) on road walong - helmet top
Read moreProviding, laying and compaction of bituminous concrete 30 mm thick after applying tack coat including correction works with bm 50 mm thick layer km 0.000 to km 12.000 (net linear length 11.645 km) on road meshai - dichu (2n call)
Providing, laying and compaction of bituminous concrete 30 mm thick after applying tack coat including correction works with bm 50 mm thick layer km 0.000 to km 12.000 (net linear length 11.645 km) on road meshai - dichu (2n call)
Read moreProviding, laying, bm 50 mm, bc 30 mm thick (hmp mix), applying tack coat and road marking all as per morth specifications between km 0.00 to 21.630 on mariani dessai road under 103 rcc /752 brtf/project udayak in assam/ nagaland state
Providing, laying, bm 50 mm, bc 30 mm thick (hmp mix), applying tack coat and road marking all as per morth specifications between km 0.00 to 21.630 on mariani dessai road under 103 rcc /752 brtf/project udayak in assam/ nagaland state
Read moreProv,lay,spread nd comp of rdymde bitumin(hmp) mix for bm 50 mm tk layer,bc 30 mm tk layer,aw rd mrking wt tp paint 2.5 mm tk for resurf wks bet km 69.940-72.000 on dhar-udhampur rd (net length 2.060 km and 3.671 km eqvt cl-9) in 69 rcc 35 tf p spk
Prov,lay,spread nd comp of rdymde bitumin(hmp) mix for bm 50 mm tk layer,bc 30 mm tk layer,aw rd mrking wt tp paint 2.5 mm tk for resurf wks bet km 69.940-72.000 on dhar-udhampur rd (net length 2.060 km and 3.671 km eqvt cl-9) in 69 rcc 35 tf p spk
Read moreSurfacing works of gsb 15 cm thick, wbm 75 mm thick, dbm 50 mm thick and bc 40 mm thick with tack coat and prime coat as per morth specifications between km 0 to 20 on kondapalli-dharmavaram road in chhattisgar state to nhsl specification
Surfacing works of gsb 15 cm thick, wbm 75 mm thick, dbm 50 mm thick and bc 40 mm thick with tack coat and prime coat as per morth specifications between km 0 to 20 on kondapalli-dharmavaram road in chhattisgar state to nhsl specification
Read moreResurf wks with p/l and compaction of 30 mm th bc and correction wks with bm 50 mm th bet km 0.00 and 11.084 on road tuensang-mon (total length 8.486 km cl-9) during fy 2024-25 aor 100 rcc/15 brtf under project sewak in the state of nagaland
Resurf wks with p/l and compaction of 30 mm th bc and correction wks with bm 50 mm th bet km 0.00 and 11.084 on road tuensang-mon (total length 8.486 km cl-9) during fy 2024-25 aor 100 rcc/15 brtf under project sewak in the state of nagaland
Read moreSurfacing works of gsb 15 cm thick, wbm 75 mm thick, dbm 50 mm thick and bc 40 mm thick with tack coat and prime coat as per morth specifications between km 0 to 10pt650 on silger puwarti road in chhattisgar state to nhsl specification
Surfacing works of gsb 15 cm thick, wbm 75 mm thick, dbm 50 mm thick and bc 40 mm thick with tack coat and prime coat as per morth specifications between km 0 to 10pt650 on silger puwarti road in chhattisgar state to nhsl specification
Read morePdg and lyg of hmp ready mix bc 30 mm th incl cleaning rd surface applying tack coat, correction wks with bm 75 mm for re-surf wks on various loc km 13.00 to km 21.300 (net length 4.35 km) on d-v-f rd under 74 rcc project psk in mizoram state
Pdg and lyg of hmp ready mix bc 30 mm th incl cleaning rd surface applying tack coat, correction wks with bm 75 mm for re-surf wks on various loc km 13.00 to km 21.300 (net length 4.35 km) on d-v-f rd under 74 rcc project psk in mizoram state
Read moreof your Industry type