Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Wbphed/Se/Ec/Nieq 57/23 24/10
|
| Description |
Construction Arsenic Cum Iron Removal Plant (Airp) Of Capacity 31.00 Cum/Hr At Paschim Bhatjangla Zone Ii Water Supply Scheme Including 3 Months Trial Run 3 Years O And M Under Nadia Division
|
| Organisation | PHE | State Govt. and UT |
| Tender Id | 2023_PHED_629461_10 |
|
Reference Number |
- |
| Tender Fee | 0 |
| EMD | 3.25 Lakh |
| Tender Value | 1 |
| Place | Krishnagar-I block |
| Link |
View Original Tender Notice
https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1347581 |
| Start Date | December 23, 2023 00:15 |
| End Date |
Expired
25/01/2024
Expired 998 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Supply, installation, testing commissioning, guarantee trial-run of rotary type sweet curd plain curd filling and sealing machine of capacity 1500 cups per hr single head at keonjhar and salapada dairy.
Supply, installation, testing commissioning, guarantee trial-run of rotary type sweet curd plain curd filling and sealing machine of capacity 1500 cups per hr single head at keonjhar and salapada dairy.
Read moreSupplying, fabrication and erection of arsenic cum iron removal plant airp as per design norms sujapur sadipur model of p.h.e. dte. with necessary accessories.
Supplying, fabrication and erection of arsenic cum iron removal plant airp as per design norms sujapur sadipur model of p.h.e. dte. with necessary accessories.
Read moreDesign, supply, installation and commissioning and trial run for 1.0 llpd (exp. 1.5 llpd) dairy plant, haringhata, nadia on turnkey basis for site basis. (including loading and unloading)
Design, supply, installation and commissioning and trial run for 1.0 llpd (exp. 1.5 llpd) dairy plant, haringhata, nadia on turnkey basis for site basis. (including loading and unloading)
Read moreDesign, supply, installation, commissioning and trial run of keratin extraction unit at haringhata, nadia-741235 under west bengal livestock development corporation limited, lb-2, sector-iii, salt lake, kolkata-700106 for 2023-24
Design, supply, installation, commissioning and trial run of keratin extraction unit at haringhata, nadia-741235 under west bengal livestock development corporation limited, lb-2, sector-iii, salt lake, kolkata-700106 for 2023-24
Read moreDesign, supply, installation, commissioning and trial run of keratin extraction unit at haringhata, nadia-741235 under west bengal livestock development corporation limited, lb-2, sector-iii, salt lake, kolkata-700106 for 2023-24
Design, supply, installation, commissioning and trial run of a keratin extraction unitt haringhata, nadia-741235 under west bengal livestock development corporation limited, lb-2, sector-iii, salt lake, kolkata-700106 for 2023-24
Read moreSupply, installation , commissioning , trial run and training of embryo freezer at ivf/ett laboratory at haringhata, nadia-741246 , under paschim banga go-sampad bikash sanstha , lb-2, sector-iii, salt lake city, kolkata-700106
Supply, installation , commissioning , trial run and training of embryo freezer at ivf/ett laboratory at haringhata, nadia-741246 , under paschim banga go-sampad bikash sanstha , lb-2, sector-iii, salt lake city, kolkata-700106
Read moreEstimate for construction of one no solar powered standalone community water purification plant for uncovered habitation (population and arsenic concentration above 0.15 ppm up to 0.30 ppm include three month trial run, near roytul jame mosjid under
Estimate for construction of one no solar powered standalone community water purification plant for uncovered habitation (population and arsenic concentration above 0.15 ppm up to 0.30 ppm include three month trial run, near roytul jame mosjid under
Read moreSupply, installation, commissioning and trial run of 100 mt pit less weigh bridge at kalyani feed milling plant, kalyani, nadia-741235 under west bengal livestock development corporation limited, lb-2, sector-iii, salt lake,kolkata-700106 for 2024-25
Supply, installation, commissioning and trial run of 100 mt pit less weigh bridge at kalyani feed milling plant, kalyani, nadia-741235 under west bengal livestock development corporation limited, lb-2, sector-iii, salt lake,kolkata-700106 for 2024-25
Read moreSupply, installation, commissioning and trial run of 100 mt pit less weigh bridge at kalyani feed milling plant, kalyani, nadia-741235 under west bengal livestock development corporation limited, lb-2, sector-iii, salt lake,kolkata-700106 for 2024-25
Supply, installation, commissioning and trial run of 100 mt pit less weigh bridge at kalyani feed milling plant, kalyani, nadia-741235 under west bengal livestock development corporation limited, lb-2, sector-iii, salt lake,kolkata-700106 for 2024-25
Read moreRound the clock watch ward of the adm plant related machineries and also time to time trial run of adm plant paver finisher excavator jcb cum loader tipper etc inc prive maintenance by servicing oiling greasing etc at pathartilla panisaga
Round the clock watch ward of the adm plant related machineries and also time to time trial run of adm plant paver finisher excavator jcb cum loader tipper etc inc prive maintenance by servicing oiling greasing etc at pathartilla panisaga
Read moreof your Industry type