Tender Details
Particulars | Details |
---|---|
Title |
General Iruvanhipuzha Side Protection Protecting The Left Bank Of Iruvanjipuzha Downstream Of Mukkam Kadavu Bridge Near Anayamkunnu Road In Karassery Panchayath In Kozhikode District General Civil Work
|
Description |
General Iruvanhipuzha Side Protection &Amp#X0d
Protecting The Left Bank Of Iruvanjipuzha&Amp#X0d
Downstream Of Mukkam Kadavu Bridge Near&Amp#X0d
Anayamkunnu Road In Karassery Panchayath In&Amp#X0d
Kozhikode District General Civil Work
|
Organisation | Irrigation Department | State Govt. and UT |
Tender Id | 2025_Irrig_755621_1 |
Reference Number |
EEIK/ET-28/2024-25 |
Tender Fee | 2760 |
EMD | 50000 |
Tender Value | |
Place | Anayamkunnu |
Link | https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1227052 |
Start Date | March 27, 2025 23:30 |
End Date |
05/04/2025 ( Expired 16 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Crif - construction of thadiyanpadu bridge periyar river connecting nh-185 to state road mdr in idukki district in the state of kerala civil work general civil work
Construction of thadiyanpadu bridge across periyar river connecting nh-185 to state road (mdr) in idukki district in the state of kerala - construction of bridge and amenities
Read moreSupply, installation and commissioning of 09(nine)nos. portable/flexible surface mounted road weigh bridge of capacity 120 mt along with bi-directional rfid based weighing system and associated civil work nd software integration in all respect at dvc
Supply, installation and commissioning of 09(nine)nos. portable/flexible surface mounted road weigh bridge of capacity 120 mt along with bi-directional rfid based weighing system and associated civil work nd software integration in all respect at dvc
Read moreProtection works for left bank approach road at nala (j.p. nala, dhindala nala) near village kandriyan in lakhwar multipurpose project
Protection works for left bank approach road at nala (j.p. nala, dhindala nala) near village kandriyan in lakhwar multipurpose project
Read moreConstruction of h/l bridges 15.56 m long over khui khera drain x-ing fazilka to malout road (mdr-40) at rd 37200 including its approaches, road di and protection work in district fazilka (under head 5054 rb-10)
Construction of h/l bridges 15.56 m long over khui khera drain x-ing fazilka to malout road (mdr-40) at rd 37200 including its approaches, road di and protection work in district fazilka (under head 5054 rb-10)
Read moreConstruction work of cc road and drain in ward ward no. 04 from near uco bank to milap halwai and in various streets. at sheopur
Construction work of cc road and drain in ward ward no. 04 from near uco bank to milap halwai and in various streets. at sheopur
Read moreTemporary restoration work for the weak aiho bridge at 13th km of malda bulbulchandi road under malda highway division in the district of malda during the year 2024-25.
Temporary restoration work for the weak aiho bridge at 13th km of malda bulbulchandi road under malda highway division in the district of malda during the year 2024-25.
Read moreAyiramthengu and side protection works to kakkachal ayiramthengu thodu in ward 15 of clappana panchayath general civil work
General non plan rectification works&#x0d of vcb at ayiramthengu and side protection&#x0d works to kakkachal ayiramthengu thodu in&#x0d ward 15 of clappana panchayathgeneral civil&#x0d work
Read moreDeposit urban agglomeration enhancing the storage capacity of the thalachira bund in ward 4 of thrikkovilvattom grama panchayath general civil work
&#x0d deposit urban agglomeration enhancing the storage capacity of the thalachira bund in ward 4 of thrikkovilvattom grama panchayath general civil work&#x0d
Read moreProtection work on left and right bank of river in various reaches/rds between downstream of dam to adit-i portal of uri-ii power station, jk
Protection work on left and right bank of river in various reaches/rds between downstream of dam to adit-i portal of uri-ii power station, jk
Read moreSub work for preparation of dpr under main work construction of two lane hlb across manjeera river in between andole, jogipet and ajjamarri village limit at km 3/0 to 3/4 and formation of approach road on either side from km 0/0 to 5/4 of andole to ajjamarri road in sangareddy district
Sub work for preparation of dpr under main work construction of two lane hlb across manjeera river in between andole, jogipet and ajjamarri village limit at km 3/0 to 3/4 and formation of approach road on either side from km 0/0 to 5/4 of andole to ajjamarri road in sangareddy district
Read moreof your Industry type