Tender Details
Particulars | Details |
---|---|
Title |
Colour Washing Painting Of Various Rest Shelter And Blasting Shelter, Writing Of Safety Slogans Spreading Of Moorum, Stone Dust And Other Miscellaneous Activities At Sdocm Dhori Area
|
Description |
Colour Washing Painting Of Various Rest Shelter And Blasting Shelter, Writing Of Safety Slogans Spreading Of Moorum, Stone Dust And Other Miscellaneous Activities At Sdocm Dhori Area
|
Organisation | Central Coalfields Limited | Public Sector Undertakings |
Tender Id | 2025_CCL_325207_1 |
Reference Number |
GM(D)/SO(C) /E-tender/2024-25/90 dt 08.01.2025 |
Tender Fee | 0 |
EMD | 9800 |
Tender Value | |
Place | Dhori Area |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=337111 |
Start Date | January 09, 2025 15:30 |
End Date |
20/01/2025 ( Expired 91 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Inviting rates of moorum and stone dust (5-6 mm th bt metel) with spreading complete work for the yearly. (retes including royalty and spreading complete) (2025-26)
Inviting rates of moorum and stone dust (5-6 mm th bt metel) with spreading complete work for the yearly. (retes including royalty and spreading complete) (2025-26)
Read moreRepaire replacement maintenance of earthing and lightening arrester la with connected accessories at various bldgs hangers, labs at eetf csl cpdc elsec and other connected area etc under ge i rnd rci hyderabad
Repaire replacement maintenance of earthing and lightening arrester la with connected accessories at various bldgs hangers, labs at eetf csl cpdc elsec and other connected area etc under ge i rnd rci hyderabad
Read moreRemoval and clearance of weed growth, shurbs, and jungle bushes along bcw complex area at baggi and distempering and painting of baggi rest camp building along with fabrication of steel platform for old for old emergency gate at bcw complex bbmb sund
Removal and clearance of weed growth, shurbs, and jungle bushes along bcw complex area at baggi and distempering and painting of baggi rest camp building along with fabrication of steel platform for old for old emergency gate at bcw complex bbmb sund
Read moreRepairing of damaged coping stone area of lock entrance and other miscellaneous work at ns dock.
Repairing of damaged coping stone area of lock entrance and other miscellaneous work at ns dock.
Read moreSupply and stacking of crushed stone aggregates of various size and stone dust between km 38.00 to 45.79 on rrk road for gsb works and km 26.00 on rrk road for wmm works and at km 76.00 on rrk for dbm and bc works between km 38.00 to km 45.79 under 1
Supply and stacking of crushed stone aggregates of various size and stone dust between km 38.00 to 45.79 on rrk road for gsb works and km 26.00 on rrk road for wmm works and at km 76.00 on rrk for dbm and bc works between km 38.00 to km 45.79 under 1
Read moreCleaning of drain, hume pipe and other miscellaneous work as and when required during monsoon period at basundhara (w)ocp under mahalaxmi area.
Cleaning of drain, hume pipe and other miscellaneous work as and when required during monsoon period at basundhara (w)ocp under mahalaxmi area.
Read moreProvision of temporary portable rest shelter for various location of mines at kocp, kusmunda area.
Provision of temporary portable rest shelter for various location of mines at kocp, kusmunda area.
Read moreDay to day checking and maintenance of electrical wiring works for project office, jacl office, field time office, field rest shelter, field canteen, substation, and other miscellaneous nr buildings etc. of jocp, ja for 2 yrs.
Day to day checking and maintenance of electrical wiring works for project office, jacl office, field time office, field rest shelter, field canteen, substation, and other miscellaneous nr buildings etc. of jocp, ja for 2 yrs
Read morePainting work of bottom ash hopper area fae tower area and other miscellaneous areas of ahp stg 1 during unit 1 overhauling scheduled in aug sept2025
Painting work of bottom ash hopper area fae tower area and other miscellaneous areas of ahp stg 1 during unit 1 overhauling scheduled in aug sept2025
Read moreRepairing of roof, side sheet, making of sitting arrangement and making of in 02 nose of rest shelter to ensure safety and welfare of person engaged in the mine of karma ocp, kuju area.
Repairing of roof, side sheet, making of sitting arrangement and making of in 02 nose of rest shelter to ensure safety and welfare of person engaged in the mine of karma ocp, kuju area.
Read moreof your Industry type