Tender Details

Particulars Details
Title
Work Of Line Construction And Line Shifting Of New Electricity Connection In Deposit Scheme Through Nivesh Mitra/Jhatpat Portal In The Jurisdiction Of Edd V, Bulandshahr.
Description
Work Of Line Construction And Line Shifting Of New Electricity Connection In Deposit Scheme Through Nivesh Mitra/Jhatpat Portal In The Jurisdiction Of Edd V, Bulandshahr.
Organisation Paschimanchal Vidyut Vitran Nigam Ltd. | State Govt. and UT
Tender Id 2025_PVVNL_993558_1
Reference
Number
67/EDC-II/BSR/24-25
Tender Fee 1180
EMD 10000
Tender Value
Place BULANDSHAHR
Link https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1758596
Start Date January 15, 2025 23:30
End Date

27/01/2025 ( Expired 142 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode

Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode

Read more
Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode

Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode

Read more
Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode

Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode

Read more
New construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022

New construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022

Read more
Construction of line shifting/ht/lt line different deposit scheme (stw, nivesh mitra, jhatpat portal and other) against semi turnkey basis under edd-gangapar, prayagraj

Construction of line shifting/ht/lt line different deposit scheme (stw, nivesh mitra, jhatpat portal and other) against semi turnkey basis under edd-gangapar, prayagraj

Read more
Construction of balanced work of 2 lane h.l. rcc bridge with its approaches from ch 0.000 to 2.150 km across river sone in the state of bihar (via panduka) and jharkhand under crif scheme on epc mode.

Construction of balanced work of 2 lane h.l. rcc bridge with its approaches from ch 0.000 to 2.150 km across river sone in the state of bihar (via panduka) and jharkhand under crif scheme on epc mode.

Read more
Construction work of drain and cc road from jagwatis house to railway line and from rathors house to mukesh vermas house in street no. 18 in ward-19 gayatri nagar.

Construction work of drain and cc road from jagwatis house to railway line and from rathors house to mukesh vermas house in street no. 18 in ward-19 gayatri nagar.

Read more
Construction of new tower with pile foundation and associated work in place of river eroded tower

Construction of new tower with pile foundation and associated work in place of river eroded tower &amp#x0d at loc-160 of 132 kv dhaligaon-gossaigaon line

Read more
Construction work of overhead line through 33 kv cable, dog conductor, 11 meter stp and 9 meter pcc pole from 220/33 kv s/s thathra (kachhwa) to the proposed s/s for energizing the 33/11 kv electrical substation proposed in transport nagar scheme.

Construction work of overhead line through 33 kv cable, dog conductor, 11 meter stp and 9 meter pcc pole from 220/33 kv s/s thathra (kachhwa) to the proposed s/s for energizing the 33/11 kv electrical substation proposed in transport nagar scheme.

Read more
Construction work of 3311 kv electrical substation and switchyard substation building in transport nagar scheme.

Construction work of 3311 kv electrical substation and switchyard substation building in transport nagar scheme.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise