Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Balsamand,Hisar 2 Const. Of Ilpb Rasta Hisar Balsamand Pwd Road To Donalwala Pond(scheme Sfc Gp
|
Description |
Balsamand,Hisar 2 Const. Of Ilpb Rasta Hisar Balsamand Pwd Road To Donalwala Pond(scheme Sfc Gp)
|
Organisation | Government of Haryana |
Tender Id | 2023_HRY_303795_1 |
Reference Number |
20239A446CEC 6696 467C A117 786296A8646A699DEV |
Tender Fee | 1000 |
EMD | 55187 |
Tender Value | |
Place | Executive Engineer Hisar |
Link | https://etenders.hry.nic.in |
Start Date | August 14, 2023 21:30 |
End Date |
21/08/2023 ( Expired 678 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Read moreRehabilitation upgradation of existing road to 2 lane 4 lane with paved shoulders configuration of murum alur waghdari akkalkot nagansur tolnur maharashtra state border nh 548b design chainage km 289.300 to 342.890 length 52.556 km approx) distr
Rehabilitation upgradation of existing road to 2 lane 4 lane with paved shoulders configuration of murum alur waghdari akkalkot nagansur tolnur maharashtra state border nh 548b design chainage km 289.300 to 342.890 length 52.556 km approx) distr
Read moreConstruction of 98.0 m 2-span steel truss bridge over abohar branch rd-180265 feet on link road jagraon to hathur to dallah, mallah, chakkar road t-01 from km. 0.000 to km. 24.580 under pmgsy-lll batch-3 in district ludhiana. package no. pb-10-135a
Construction of 98.0 m 2-span steel truss bridge over abohar branch rd-180265 feet on link road jagraon to hathur to dallah, mallah, chakkar road t-01 from km. 0.000 to km. 24.580 under pmgsy-lll batch-3 in district ludhiana. package no. pb-10-135a
Read moreConstruction of boundary wall around of green belt situated from scheme no. 78 part -2 house no. 136 advance national academy school to hotel 10-11 grand under ward no. 32 zone no.07
Construction of boundary wall around of green belt situated from scheme no. 78 part -2 house no. 136 advance national academy school to hotel 10-11 grand under ward no. 32 zone no.07
Read moreSpl repair to internal road including drainage system of hq 2 mtn arty bde at and spl repair to road form offrs mess to mechanical laundry in 162 mh at dinjan mil stn under ge dinjan
Spl repair to internal road including drainage system of hq 2 mtn arty bde at and spl repair to road form offrs mess to mechanical laundry in 162 mh at dinjan mil stn under ge dinjan
Read moreConstruction of concrete road from dongalon pitch road to mongalpur pitch road under sahaspur gp within indas block in the district of bankura (length 3.500 km)
Construction of concrete road from dongalon pitch road to mongalpur pitch road under sahaspur gp within indas block in the district of bankura (length 3.500 km)
Read moreMtc. of ganganagar village road under pwd(rnb) sub-division during the year 2025-26 sh - construction of rcc u shaped road side drain of length 398.00 mtr ch. 0.492 km to 0.890 km
Construction of rcc u shaped road side drain of length 398.00 mtr ch. 0.492 km to 0.890 km
Read moreAugmentation and rehabilitation of water supply scheme canal water based water supply project for const. of 10 mld wtp and other related works including 5 years operation and maintenance at mukerian distt. hsp. punjab part-2 under amrut 2.0 scheme
Augmentation and rehabilitation of water supply scheme canal water based water supply project for const. of 10 mld wtp and other related works including 5 years operation and maintenance at mukerian distt. hsp. punjab part-2 under amrut 2.0 scheme
Read moreConst of 41.90 m span bridge 5-span 8.38m each at rd 1665 m on link road tr 08 kheowali dhab to kabulshah to ramkot to sugar mill nh 07 widening of existing bridge under pmgsy iii batch -3 year 2024-25 district fazilka package no pb-19-313 a
Const of 41.90 m span bridge 5-span 8.38m each at rd 1665 m on link road tr 08 kheowali dhab to kabulshah to ramkot to sugar mill nh 07 widening of existing bridge under pmgsy iii batch -3 year 2024-25 district fazilka package no pb-19-313 a
Read moreof your Industry type