Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Silt Clearance And Jungle Clearance From Internal Section Of Fatehpur Drain, Jungle Clearance From Internal Section Of Garhi Bala Drain No. 2 Before Monsoon 2026.
|
| Description |
Estimate For Silt Clearance And Jungle Clearance From Internal Section Of Fatehpur Drain, Jungle Clearance From Internal Section Of Garhi Bala Drain No. 2 Before Monsoon 2026.
|
| Organisation | Haryana Government | State Govt. and UT |
| Tender Id | 2026_HRY_516710_1 |
|
Reference Number |
20260DFFC022 6BB8 4DAD A8F9 E52259B52346212IRR |
| Tender Fee | 1500 |
| EMD | 6198 |
| Tender Value | |
| Place | FATHEPUR KANWALI |
| Link |
View Original Tender Notice
https://etenders.hry.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=595575 |
| Start Date | April 22, 2026 17:30 |
| End Date |
Expired
27/04/2026
Expired 66 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
A no. ge/chm-50/2026-2027 periodical maintenance of internal electrification with allied works in md accn of sector b and mes/ comd colony at chandimandir
Ca no. ge/chm-50/2026-2027 periodical maintenance of internal electrification with allied works in md accn of sector b and mes/ comd colony at chandimandir
Read moreA/r and m/o various roads under pwd division south west road-2/sub division-1,2,3,4 and 5 during 2026-27. (sh- emergency response arrangement for water logging through deployment of additional maintenance van and 127 hp pump during monsoon season).
A/r and m/o various roads under pwd division south west road-2/sub division-1,2,3,4 and 5 during 2026-27. (sh- emergency response arrangement for water logging through deployment of additional maintenance van and 127 hp pump during monsoon season).
Read moreHyderabad division: sw(i) sc-mue section: proposed construction of 2 lane rob in lieu of lc no.180 at rly km 422/1-2 of span 1x36.00 m composite girder between dab-bsx stations on mue-sc section of hyb division - deposit work sw(ii) hyb div: sc-mue section: proposed construction of 2 lane rob at rly km 418/0-1 of span 1x36.00 m composite girder between kek- dab stations on mue-sc section on sh/mdr at km 1002.9 at atkur side road bypass near dharmabad-deposit work. - electrical trd arrang
For complete deion and other details, please refer to tender
Read moreConstruction of a cc road and drain in ward no. 03, arya nagar, gosaiganj extending from the west of the main road, passing through the harijan basti, and connecting back to the main road
Construction of a cc road and drain in ward no. 03, arya nagar, gosaiganj extending from the west of the main road, passing through the harijan basti, and connecting back to the main road
Read moreCa no. ge af no.1/gur-16/2026-27 repair to concealed gi pipe lines of officer quarter, repair to seepage from sunken slab alongwith kitchen sunken portion and other associated works in certain qtrs of sekhon vihar area at af stn palam under ge (af)
Ca no. ge af no.1/gur-16/2026-27 repair to concealed gi pipe lines of officer quarter, repair to seepage from sunken slab alongwith kitchen sunken portion and other associated works in certain qtrs of sekhon vihar area at af stn palam under ge (af)
Read moreConsultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Read moreSilt clearance and jungle clearance from internal section of fatehpur drain, jungle clearance from internal section of garhi bala drain no. 2 before monsoon 2026.
Estimate for silt clearance and jungle clearance from internal section of fatehpur drain, jungle clearance from internal section of garhi bala drain no. 2 before monsoon 2026.
Read moreClearance of jungle from internal section of fatehpur drain, rohat drain, kawali drain and garhi bala drain no. 2
Estimate for clearance of jungle from internal section of fatehpur drain, rohat drain, kawali drain and garhi bala drain no. 2 before monsoon 2024.
Read moreClearance of jungle from internal section of kawali link drain, rohat drain and garhi bala link drain no. 2 before monsoon 2025.
Estimate for clearance of jungle from internal section of kawali link drain, rohat drain and garhi bala link drain no. 2 before monsoon 2025.
Read moreInternal clearance of jungle from internal section of kharkhoda drain before monsoon 2026.
Estimate for internal clearance of jungle from internal section of kharkhoda drain before monsoon 2026.
Read moreof your Industry type