Tender Details
Particulars | Details |
---|---|
Title |
1.Nvg Comp Glide Path Indicator Gpi,2.Nvg Comp Stablized Horizontal Roll Bar,3.Nvg Landing Period D
|
Description |
|
Organisation | Department of Defence Production | Ministry of Defence |
Tender Id | GEM/2025/B/6126916 |
Reference Number |
|
Tender Fee | |
EMD | |
Tender Value | 2 Crore |
Place | |
Link | https://bidplus.gem.gov.in/all-bids |
Start Date | April 23, 2025 15:54 |
End Date |
14/05/2025 ( Expired 3 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Item no.1-ms round bar,item no.2-ms round bright bar,item no.3-ms round bright bar,item no.4-ms rou
Read more
Hiring of 1 x p3 pixel data wall size 14 x 10 sqft per day reqd for 3 days,hiring of 2 x p3 pixel d
Read more
Selection of contractor to implement integrated s.w.m. services on o/m basis of upsida industrial estate loni gzb on qcbs basis for a minimum period of 3 years and thereafter can be extended for 2 years(1 year at a time on mutual agreement basis)
Selection of contractor to implement integrated s.w.m. services on o/m basis of upsida industrial estate loni gzb on qcbs basis for a minimum period of 3 years and thereafter can be extended for 2 years(1 year at a time on mutual agreement basis)
Read moreSelection of contractor to implement integrated s.w.m. services on o/m basis of upsida i.a. sports goods complex distt- meerut on qcbs basis for a minimum period of 3 years and thereafter can be extended for 2 years(1 year at a time on mutual agreeme
Selection of contractor to implement integrated s.w.m. services on o/m basis of upsida i.a. sports goods complex distt- meerut on qcbs basis for a minimum period of 3 years and thereafter can be extended for 2 years(1 year at a time on mutual agreeme
Read moreLaying of missing ugd internal network lines at adarshnagar hill area-2 from d.no.3-420/1 to ep no 159a/3 and d.no 3-417 to d no 3-382 in w.no. 10 under a.e-28 section of zone-ii, gvmc
Laying of missing ugd internal network lines at adarshnagar hill area-2 from d.no.3-420/1 to ep no 159a/3 and d.no 3-417 to d no 3-382 in w.no. 10 under a.e-28 section of zone-ii, gvmc
Read moreSupply and commissioning of 1 no of 25 kva 2 nos of 40 kva diesel generator with camc for a period of 5 years after one year warranty period for 3 nos of chennai high a higher secondary schoo
Supply and commissioning of 1 no of 25 kva 2 nos of 40 kva diesel generator with camc for a period of 5 years after one year warranty period for 3 nos of chennai high and higher secondary schoo
Read moreDismantling and erection of metalic expansion joints ( 1.rcej 4/5000x3100x561, 2.rcej4/4100x3700x561, 3.rcej1-half size/3874x5574x81mm 4.rcej1/7000x4000x186) along with protection plate and welding of corner piece of expansion joint rcej2-3058x3358x272mm in unit-ix in the annual overhaul period.
Dismantling and erection of metalic expansion joints 1.rcej 4/5000x3100x561 2.rcej 4 4100x3700x561 3.rcej 1-half size 3874x5574x81mm and 4.rcej 1 7000x4000x186 along with protection plate and welding of corner piece of expansion joint rcej 2-3058x3358x272mm in unit-ix in the annual overhaul period.
Read more1.nvg comp glide path indicator gpi,2.nvg comp stablized horizontal roll bar,3.nvg landing period d
Read more
Ibr 3/8" bar plug cs_ he9791003017,ibr 1/2" bar plug cs (sa105) _ he9791003025,ibr 3/4" bar plug cs
Read more
Selection of contractor to implement integrated swm services on o/m basis of upsida i.a. panki site-5, knp on qcbs basis for a minimum period of 3 years and thereafter can be extended for 2 years (1 year at a time on mutual agreement basis
Selection of contractor to implement integrated swm services on o/m basis of upsida i.a. panki site-5, knp on qcbs basis for a minimum period of 3 years and thereafter can be extended for 2 years (1 year at a time on mutual agreement basis
Read moreof your Industry type