Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🏭 Request For Proposals: Arc Services For Power Generation Units 🚧 The West Bengal Power Development Corporation Ltd., A State Government Entity, Is Seeking Proposals For An Annual Renewable Contract (Arc) For The Maintenance Of Unit 4 Boiler And Auxiliary Equipments, As Well As For The Overhauling Of Unit 3 And 4 Mills, Replacement Of Mill Gear Boxes, And Btl Repairing For Units 3 To 6. 📅 Proposal Submission Deadline: July 24, 2024, 11:00 Am The Location Of The Project Is Ktps, Mecheda, Purba Medinipur. There Is No Tender Fee, But An Earnest Money Deposit (Emd) Of Inr 945762 Is Required. Interested Service Providers Must Submit Detailed Proposals, Including Technical Capabilities, Experience, And Financial Bids, To Be Considered For This Contract. Keywords: Arc, Power Development, Boiler Maintenance, Mill Overhauling, Gear Box Replacement, Btl Repairing, West Bengal Power Development Corporation Limited, State Government Tender, Ut Tender| Particulars | Details |
|---|---|
| Title |
Arc For Unit 4 Boiler And Auxiliary Equipments Maintenance, Unit 3 And 4 Mill Overhauling, Unit 3 And 4 Mill Gear Box Replacement And Unit 3 To 6 Btl Repairing Job
|
| Description |
Arc For Unit 4 Boiler And Auxiliary Equipments Maintenance, Unit 3 And 4 Mill Overhauling, Unit 3 And 4 Mill Gear Box Replacement And Unit 3 To 6 Btl Repairing Job
|
| Organisation | THE WEST BENGAL POWER DEVELOPMENT CORPORATION LTD. | State Govt. and UT |
| Tender Id | 2024_WBPDC_692537_1 |
|
Reference Number |
GM(K)/CC/BM/2334 (Vol.15)/ E2979/24-25 |
| Tender Fee | 0 |
| EMD | 9.46 Lakh |
| Tender Value | - |
| Place | KTPS,Mecheda,Purba Medinipur |
| Link |
View Original Tender Notice
https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1508232 |
| Start Date | July 02, 2024 21:30 |
| End Date |
Expired
24/07/2024
Expired 812 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Bi-annual rate contract for u4 b and a equipment maintenance,u3-6 btl rectification job, u3 and 4 mill overhauling and gear box replacement job for ktps
Bi-annual rate contract for u4 b and a equipment maintenance,u3-6 btl rectification job, u3 and 4 mill overhauling and gear box replacement job for ktps
Read moreThe repair/overhauling of gear box of tata truck up64at7308
The repair/overhauling of gear box of tata truck up64at7308
Read moreMechanical repairing/ overhauling of gear box and gear coupling including fabrication and installation of gear box and motor base frame of conveyor unit 401 at moonidih coal washery.
Mechanical repairing/ overhauling of gear box and gear coupling including fabrication and installation of gear box and motor base frame of conveyor unit 401 at moonidih coal washery.
Read moreRepair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit repair of one no of pinion of gear box of boiler feed water pump p 605 in ammonia plant at rcf thal unit service provider
Repair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit repair of one no of pinion of gear box of boiler feed water pump p 605 in ammonia plant at rcf thal unit service provider
Read moreRepair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit biennial rate contract for replacement of ball mill pinion, bearing liner and gear box in phosphoric acid plant at rcf trombay unit as per sow mentioned ..
Repair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit biennial rate contract for replacement of ball mill pinion, bearing liner and gear box in phosphoric acid plant at rcf trombay unit as per sow mentioned ..
Read moreProcurement of fasteners for overhauling job of coal mill, aph ducts, coal burner nozzle, ccp, pa/fd/id fan of stage-1 (2x300 mw), sgtpp
Procurement of fasteners for overhauling job of coal mill, aph ducts, coal burner nozzle, ccp, pa/fd/id fan of stage-1 (2x300 mw), sgtpp
Read moreOverhauling of rotary pump,repair of gear box assy,rotary pump overhaul,repair of rotary pump,surfacing of hub both side brg
Overhauling of rotary pump,repair of gear box assy,rotary pump overhaul,repair of rotary pump,surfacing of hub both side brg
Read moreRepair, maintenance, and installation of plant/ systems/equipments (version 2) - 3x210mw atps anpara overhauling of main boiler viz overhauling of drum deaerator ibd cbd tanks replacement of coal nozzle assembly and fi elbows repair of duct and damp..
Repair, maintenance, and installation of plant/ systems/equipments (version 2) - 3x210mw atps anpara overhauling of main boiler viz overhauling of drum deaerator ibd cbd tanks replacement of coal nozzle assembly and fi elbows repair of duct and damp..
Read moreRepairing/overhauling of engine, fip pump, propeller shaft, clutch plate and gear box of hyva tipper reg. no. jh 10 ad7092 at 5.0 mtpa patherdih nlw coal washery
Repairing/overhauling of engine, fip pump, propeller shaft, clutch plate and gear box of hyva tipper reg. no. jh 10 ad7092 at 5.0 mtpa patherdih nlw coal washery
Read moreof your Industry type