Tender Details
Particulars | Details |
---|---|
Title |
For The Work For Erection Of Line For New Connection On Jhatpat Portal, Nives Mitra And Shifting Under Ee, Uedd Iv, Varanasi.
|
Description |
For The Work For Erection Of Line For New Connection On Jhatpat Portal, Nives Mitra And Shifting Under Ee, Uedd Iv, Varanasi.
|
Organisation | Government of Uttar Pradesh |
Tender Id | 2023_PVVNV_844518_1 |
Reference Number |
111/UEDC-I(V)/2023-24 |
Tender Fee | 2360 |
EMD | 13000 |
Tender Value | 0 |
Place | VARANASI |
Link | https://etender.up.nic.in |
Start Date | September 29, 2023 23:30 |
End Date |
10/10/2023 ( Expired 612 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Landslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25
Landslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25
Read moreFor surface cleaning and painting of tower structures with single coat of red oxide and single coat of aluminum paint of 400 kv sarni-seoni line and 400 kv sarni-indirasagar line under tlm sub dn. sarni under ee eht (maint.) dn.itarsi
For surface cleaning and painting of tower structures with single coat of red oxide and single coat of aluminum paint of 400 kv sarni-seoni line and 400 kv sarni-indirasagar line under tlm sub dn. sarni under ee eht (maint.) dn.itarsi
Read moreConstruction of various transmission elements (02 no. 400 kv and 02 no. 220 kv transmission lines) for proposed 400 kv gss amber (jaipur north) with installation of opgw network on existing line including survey, supply under bn-9018002511
Construction of various transmission elements (02 no. 400 kv and 02 no. 220 kv transmission lines) for proposed 400 kv gss amber (jaipuir north) with installation of opgw network on existing line including survey, supply under bn-9018002511(turnkey)
Read moreRectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Read moreProviding gang for the work of attending to resolving the fuse off call complaints lt ht line breakdowns for restoration of electrical power supply in the various sub divisions under ds circle pspcl mohali on per day basis
Providing gang for the work of attending to resolving the fuse off call complaints lt ht line breakdowns for restoration of electrical power supply in the various sub divisions under ds circle pspcl mohali on per day basis
Read moreWork of complete erection of 01 no. a type tower between location no. 60 and 61 for reduce sagging of existing towers of 132 kv mahoba-panwari-i line under etd hamirpur.
Work of complete erection of 01 no. a type tower between location no. 60 and 61 for reduce sagging of existing towers of 132 kv mahoba-panwari-i line under etd hamirpur.
Read moreProviding gangs for the work of attending to resolving the fuse off call complaints and lt ht line breakdowns for restoration of electrical power supply in the various sub divisions under ds circle sangur on per day basis.
Providing gangs for the work of attending to resolving the fuse off call complaints and lt ht line breakdowns for restoration of electrical power supply in the various sub divisions under ds circle sangur on per day basis.
Read moreEng. pro. const. and comm. epc and performance followed by o and m of stp of 40 mld capacity based on sequential batch reactor sbr technology near chandlai lake for bambala area, sanganer sewerage work under ee phe i jda jaipur
Eng. pro. const. and comm. epc and performance followed by o and m of stp of 40 mld capacity based on sequential batch reactor sbr technology near chandlai lake for bambala area, sanganer sewerage work under ee phe i jda jaipur
Read moreSewer line shifting work at jarib chawki under deposite programme kanpur nagar including supply of all labour material t and p etc completed testing and commissioning
Sewer line shifting work at jarib chawki under deposite programme kanpur nagar including supply of all labour material t and p etc completed testing and commissioning
Read moreWork of construction of 02 nos. 132kv bays for making protection and metering system of 132kv maharajganj (220kv)-maharajganj (132kv) line bay and making of protection system of t.b.c. bay at 132kv s/s maharajganj under etd-ii, gorakhpur
Work of construction of 02 nos. 132kv bays for making protection and metering system of 132kv maharajganj (220kv)-maharajganj (132kv) line bay and making of protection system of t.b.c. bay at 132kv s/s maharajganj under etd-ii, gorakhpur
Read moreof your Industry type