Tender Details
Particulars | Details |
---|---|
Title |
Alloy Steel Rod Dia 435 (+ / 2) Mm In Multiple Length Of 70(+ / 5) Mm To Specification 1.2711/55 Cr N
|
Description |
|
Organisation | Department of Defence Production | Ministry of Defence |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | |
EMD | |
Tender Value | |
Place | |
Link |
AAAAAAAAAA Login to view |
Start Date | April 12, 2025 16:44 |
End Date |
26/04/2025 ( 6 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Consultancy services for ae for supervision of rehabilitation and upgradation from of kolde to visarwadi (near junction with nh-6) section of nh752g (total length -4.40) to 2lps/ four lanes in the state of maharashtra on epc mode.
Consultancy services for ae for supervision of rehabilitation and upgradation from of kolde to visarwadi (near junction with nh-6) section of nh752g (total length -4.40) to 2lps/ four lanes in the state of maharashtra on epc mode.
Read moreServices of ie for widening, reconstruction and up-gradation to 2lps for the work of junnar- ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length -55.940 km) in the state of maharashtra on hybrid annuity mode.
Services of ie for widening, reconstruction and up-gradation to 2lps for the work of junnar- ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length -55.940 km) in the state of maharashtra on hybrid annuity mode.
Read morePerformance based maintenance contract pbmc for maintenance of watul . talgaon section of nh .66 from existing km 332.200 to km 367.200 design km 165.270 to km 198.528 project length 33.258km in the state of maharashtra for 5 years. maintenance p
Performance based maintenance contract pbmc for maintenance of watul . talgaon section of nh .66 from existing km 332.200 to km 367.200 design km 165.270 to km 198.528 project length 33.258km in the state of maharashtra for 5 years. maintenance p
Read morePerformance based maintenance contracts pbmc estimate of katol to warud section of nh- 353j from existing km 60.100 to 101.085 from design km 60.100 to km 100.565 project length 35.935 km in the state of maharashtra for 5 year maintenance period
Performance based maintenance contracts pbmc estimate of katol to warud section of nh_ 353j from existing km 60.100 to 101.085 from design km 60.100 to km 100.565 project length 35.935 km in the state of maharashtra for 5 year maintenance per
Read moreConsultancy services for preparation of dpr for four laning of thamaraipatti to t.pudupatti section (madurai ring road phase-ii) from km 29.960 to km 83.170 (length 53.210 km) of nh-744a in the state of tamil nadu
Consultancy services for preparation of dpr for four laning of thamaraipatti to t.pudupatti section (madurai ring road phase-ii) from km 29.960 to km 83.170 (length 53.210 km) of nh-744a in the state of tamil nadu
Read moreOperation and maintenance of two laning with paved shoulders of lambia raipur section of nh 458 from km 163.800 to km 218.563 (total length 54.763 km) under nhdp phase iv in the state of rajasthan
Operation and maintenance of two laning with paved shoulders of lambia raipur section of nh 458 from km 163.800 to km 218.563 (total length 54.763 km) under nhdp phase iv in the state of rajasthan
Read moreConsultancy services of independent engineer for upgradation to two lane with paved shoulder configuration from km. 0/000 to 62/822 (limbdi-dhrangadhra section) of nh-51 in the state of gujarat (total length- 62.822km) on ham mode
Consultancy services of independent engineer for upgradation to two lane with paved shoulder configuration from km. 0/000 to 62/822 (limbdi-dhrangadhra section) of nh-51 in the state of gujarat (total length- 62.822km) on ham mode
Read morePreparation of dpr including land acquisition and forest clearance for construction of road tungri samchung tsela mago from new to nhsl specifications (indicative length 60 kms) under project vartak in state of arunachal pradesh
Preparation of dpr including land acquisition and forest clearance for construction of road tungri samchung tsela mago from new to nhsl specifications (indicative length 60 kms) under project vartak in state of arunachal pradesh
Read moreUpgradation strengthening of 2-4 lane carriageway to 4-lane divided carriageway from ch.132.320 in dhamasiya village in naswade taluka to ch.161.000 in jitnagar village in nandod taluka (l 28.680 km) section of nh-56 in gujarat on ham (pkg-iv(a)
Upgradation strengthening of 2-4 lane carriageway to 4-lane divided carriageway from ch.132.320 in dhamasiya village in naswade taluka to ch.161.000 in jitnagar village in nandod taluka (l 28.680 km) section of nh-56 in gujarat on ham (pkg-iv(a)
Read moreUpgradation strengthening of 2-4 lane carriageway to 4-lane divided carriageway from ch.161.000 in jitnagar village in nandod taluka to ch.179.780 in bitada-movi village in netrang taluka (l 18.780 km) section of nh-56 in gujarat on ham (pkg-iv)(b)
Upgradation strengthening of 2-4 lane carriageway to 4-lane divided carriageway from ch.161.000 in jitnagar village in nandod taluka to ch.179.780 in bitada-movi village in netrang taluka (l 18.780 km) section of nh-56 in gujarat on ham (pkg-iv)(b)
Read moreof your Industry type