Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
For High Pressure Testing And Calibration Of Electrical Equipment Installed At 28 Mva Regional Sub Station Kathara Area Under Kathara Colliery.
|
| Description |
For High Pressure Testing And Calibration Of Electrical Equipment Installed At 28 Mva Regional Sub Station Kathara Area Under Kathara Colliery.
|
| Organisation | Central Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2024_CCL_301553_1 |
|
Reference Number |
KTC/PE(EnM)/E-Tender/23-24/298 |
| Tender Fee | 0 |
| EMD | 14000 |
| Tender Value | - |
| Place | Office of the Project Officer, PE (EnM), Kathara C |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=312380 |
| Start Date | February 16, 2024 15:30 |
| End Date |
Expired
24/02/2024
Expired 962 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Repairing, installation and commissioning of current transformer in main incoming sf-6 breaker (main-i) of regional sub-station, kathara area under kathara colliery.
Repairing, installation and commissioning of current transformer in main incoming sf-6 breaker (main-i) of regional sub-station, kathara area under kathara colliery.
Read moreCalibration of megger make testing equipment for ntpc north karanpura
Calibration of megger make testing equipment for ntpc north karanpura
Read moreTesting of transformers, circuit breakers, instrument transformers, protective relays, capacitor bank and calibration of electrical testing instrument of kuju colliery under kuju area.
Testing of transformers, circuit breakers, instrument transformers, protective relays, capacitor bank and calibration of electrical testing instrument of kuju colliery under kuju area.
Read moreOut sourcing of nd testing, hydraulic pressure testing, calibration of pressure gauge and relief valve and shell thickness measurement of air reciever tanks of hemm working at kkocp for period of 3 years.
Out sourcing of nd testing, hydraulic pressure testing, calibration of pressure gauge and relief valve and shell thickness measurement of air reciever tanks of hemm working at kkocp for period of 3 years.
Read moreTesting service for on-board /commissioned equipment/ instrument related to plant - fault mva study in neyveli thermal unit as per scope as per scope
Testing service for on-board /commissioned equipment/ instrument related to plant - fault mva study in neyveli thermal unit as per scope as per scope
Read moreRepairing of five no pressure drum shell dia 215 mm x 1150 mm long shaft dia 75 mm of 1000 mm belt conveyors rvii and rviia seam installed in 3 and 4 incline j p colliery
Repairing of five no pressure drum shell dia 215 mm x 1150 mm long shaft dia 75 mm of 1000 mm belt conveyors rvii and rviia seam installed in 3 and 4 incline j p colliery
Read more(i)for maintenance of one no.1 mva 6.6kv/550v transformer installed at loyabad colliery make-ece,asset sl.no.arn/14 lbc(ii)complete rewinding and overhauling of a 750 kva power transformer 6.6kv/550v at 5 pit substation of lbc make-ece asset.no.loy/e
(i)for maintenance of one no.1 mva 6.6kv/550v transformer installed at loyabad colliery make-ece,asset sl.no.arn/14 lbc(ii)complete rewinding and overhauling of a 750 kva power transformer 6.6kv/550v at 5 pit substation of lbc make-ece asset.no.loy/e
Read moreMobilization and demobilization of manpower tools and tackles welding machine gas cutting scaffolding materials and other necessary equipment to site,dismantling removal of existing old damaged and rusted trash rack including cutting lifting handling and disposal as directed by eic,preparation of fabrication shop drawings based on departmental design drawings supply of structural steel fabrication,underwater inspection and cleaning of intake area before erection of new trash rack including detailed site inspection prior to preparation of fabrication drawings and furnishing of photographs etc,providing and applying one coat of metal primer and two coats of anti corrosive epoxy paint on fabricated trash rack,testing inspection and commissioning of newly installed trash rack including rectification of defects if any
Mobilization and demobilization of manpower tools and tackles welding machine gas cutting scaffolding materials and other necessary equipment to site,dismantling removal of existing old damaged and rusted trash rack including cutting lifting handling and disposal as directed by eic,preparation of fabrication shop drawings based on departmental design drawings supply of structural steel fabrication,underwater inspection and cleaning of intake area before erection of new trash rack including detailed site inspection prior to preparation of fabrication drawings and furnishing of photographs etc,providing and applying one coat of metal primer and two coats of anti corrosive epoxy paint on fabricated trash rack,testing inspection and commissioning of newly installed trash rack including rectification of defects if any
Read moreCalibration and repair of moisture meter,test cup,spur gear,bevel gear,guide nut,insulation disk,thrust bearing,bevel pinion,micro controller,electronic switch,com. pcb,com. meggar box,temperature sensor,i.c. regulator 7805,timer i.c. 7555,i.c 4051,i.c 7447,eprom,f.n.d. board,ic 7135,complete body universal,bracket,spur pinion bigsmall,40 pin header set,pinion brush,lead screw,volume cup a,volume cup b,volume cup c,allen key,battery compartment,adaptor,connector leads 12 pin,connector leads 2 3 pins,relay,segment i.c.,i.c. 7600,switching transistor bc 107,crystal 6.144 mhz,ic base 16 pins,ic base 28 pins,ic 7600,dry cell 1.5 nv,at mega 328 p set,lcd 16x2,duvcon mager complete sticker,22 ohm,printer i.c.,module cell for date and time,ic base 20 pin,complete power supply,scale screw,carrier handle,body universal without spare,rachet handle,max 232,pressure plate,ic 74373,spur gear axle,wooden box big small,body dmm,plunger agro,crank handle agro,top plunger,bottom plunger,circular scale,bk handle test cup,pcb l
Calibration and repair of moisture meter,test cup,spur gear,bevel gear,guide nut,insulation disk,thrust bearing,bevel pinion,micro controller,electronic switch,com. pcb,com. meggar box,temperature sensor,i.c. regulator 7805,timer i.c. 7555,i.c 4051,i.c 7447,eprom,f.n.d. board,ic 7135,complete body universal,bracket,spur pinion bigsmall,40 pin header set,pinion brush,lead screw,volume cup a,volume cup b,volume cup c,allen key,battery compartment,adaptor,connector leads 12 pin,connector leads 2 3 pins,relay,segment i.c.,i.c. 7600,switching transistor bc 107,crystal 6.144 mhz,ic base 16 pins,ic base 28 pins,ic 7600,dry cell 1.5 nv,at mega 328 p set,lcd 16x2,duvcon mager complete sticker,22 ohm,printer i.c.,module cell for date and time,ic base 20 pin,complete power supply,scale screw,carrier handle,body universal without spare,rachet handle,max 232,pressure plate,ic 74373,spur gear axle,wooden box big small,body dmm,plunger agro,crank handle agro,top plunger,bottom plunger,circular scale,bk handle test cup,pcb l
Read moreFor high pressure testing and calibration of electrical equipment installed at 28 mva regional sub station kathara area under kathara colliery.
For high pressure testing and calibration of electrical equipment installed at 28 mva regional sub station kathara area under kathara colliery.
Read moreof your Industry type