Title |
Laying Jointing And Shifting 12/10 Inch Dia 02 No. Additional Pipeline For Dewatering Of Mine Water From East Turra Coalface To Hanuman Chauraha In The Drain Near Mudwani Dam Of Nigahi Project
|
Description |
Laying Jointing And Shifting 12/10 Inch Dia 02 No. Additional Pipeline For Dewatering Of Mine Water From East Turra Coalface To Hanuman Chauraha In The Drain Near Mudwani Dam Of Nigahi Project
|
Organisation | Northern Coalfields Limited | Public Sector Undertakings |
Tender Id | 2025_NCL_332014_1 |
Reference Number |
NGH/EM/e-Tender/24-25/60 dtd. 12.03.2025 |
Tender Fee | 0 |
EMD | 25200 |
Tender Value | |
Place | NCL Nigahi Area |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=344444 |
Start Date | March 13, 2025 16:30 |
End Date |
24/03/2025 ( Expired 99 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Laying and modification of water pipeline (2inch and 6 inch and connection of fog canon at new site at sbc (ii)and laying and jointing 4 inch and 6 inch dia m.s pipeline, with flange supply at jogta coal dump and changing of damaged pipeline 4 inch a
Laying and modification of water pipeline (2inch and 6 inch and connection of fog canon at new site at sbc (ii)and laying and jointing 4 inch and 6 inch dia m.s pipeline, with flange supply at jogta coal dump and changing of damaged pipeline 4 inch a
Read moreWork of 8 inch ms/gi pipeline with dismantling, laying, pipe cutting, jointing etc work for pump shifting at coal face as well as 32 no. sump including repairing of old damaged delivery pipelines as when where req as per advancement of mine
Work of 8 inch ms/gi pipeline with dismantling, laying, pipe cutting, jointing etc work for pump shifting at coal face as well as 32 no. sump including repairing of old damaged delivery pipelines as when where req as per advancement of mine
Read moreShifting, di, extension of pipeline arrangement for lower kusmunda-1 (lk-1) and lower kusmunda-2 (lk-2) quarry sumps by laying and jointing of pipeline for dewatering purposes along with making of bends of sizes 12/10/8/6/4 inches at dep.
Shifting, di, extension of pipeline arrangement for lower kusmunda-1 (lk-1) and lower kusmunda-2 (lk-2) quarry sumps by laying and jointing of pipeline for dewatering purposes along with making of bends of sizes 12/10/8/6/4 inches at dep.
Read moreDismantling and laying of 8 inch dia m.s. pipeline required for extension of delivery pipeline of the 2000 g.p.m. pump motor set installed at the a patch in mine, involved in dewatering of the a patch, w.r.t. karo ocp, under bnk area
Dismantling and laying of 8 inch dia m.s. pipeline required for extension of delivery pipeline of the 2000 g.p.m. pump motor set installed at the a patch in mine, involved in dewatering of the a patch, w.r.t. karo ocp, under bnk area
Read moreProviding and laying 36 inch dia rcc storm water drain from neelam chowk to ac nagar nallah near neelam flyover in ward no.12, faridabad
Providing and laying 36 inch dia rcc storm water drain from neelam chowk to ac nagar nallah near neelam flyover in ward no.12, faridabad
Read moreLaying underground 200 mm dia ac mazza 2.5 kg/sqcm pressure pipeline for dewatering of flood water from low laying fields of village baniyani to outfall rd 1800-r of baniyani sub link drain
Laying underground 200 mm dia ac mazza 2.5 kg/sqcm pressure pipeline for dewatering of flood water from low laying fields of village baniyani to outfall rd 1800-r of baniyani sub link drain
Read moreLaying and jointing of 10 inch dia m s pipeline for dewatering of mines during upcoming monsoon w.r.t. konar exp. ocp, bnk area
Laying and jointing of 10 inch dia m s pipeline for dewatering of mines during upcoming monsoon w.r.t. konar exp. ocp, bnk area
Read moreDismantling laying pipe cutting jointing (welding) etc of 6 inch-300 mtr 8 inch dia-200 mtr 4 inch- 150 mtr. pipeline for shifting of pumps at main sump firefighting locations and others as and whenever required under ttk ocp rajhara area
Dismantling laying pipe cutting jointing (welding) etc of 6 inch-300 mtr 8 inch dia-200 mtr 4 inch- 150 mtr. pipeline for shifting of pumps at main sump firefighting locations and others as and whenever required under ttk ocp rajhara area
Read moreMaking of 03 nos of 8 inch dia ms pipeline range (welding of flanges, shifting, laying and jointing of pipes) from rvi to outside nallah discharge for smooth dewatering under s.b. project.
Making of 03 nos of 8 inch dia ms pipeline range (welding of flanges, shifting, laying and jointing of pipes) from rvi to outside nallah discharge for smooth dewatering under s.b. project.
Read moreNagpur additional butibori i.a. providing laying jointing and commissioning 900 mm dia di k 9 class pure water rising main 600 mm dia di k 9 class distribution pipeline and construction of 6000 cum rcc sump pump house and 2000 cum capacity esr
Nagpur additional butibori i.a. providing laying jointing and commissioning 900 mm dia di k 9 class pure water rising main 600 mm dia di k 9 class distribution pipeline and construction of 6000 cum rcc sump pump house and 2000 cum capacity esr