Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Hard Drawn Grooved Copper Contact Wire
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 106600573 |
|
Reference Number |
L7255233 |
| Tender Fee | 0 |
| EMD | 0 |
| Tender Value | - |
| Place | Hubli |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/supply/pdfdocs/022025/106600573/viewNitPdf_4857962.pdf |
| Start Date | February 06, 2025 15:18 |
| End Date |
Expired
24/02/2025
Expired 572 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of hard park of m.t.e. at drmu, barauni dairy
Construction of hard park of m.t.e. at drmu, barauni dairy
Read moreProcurement of 8swg gi wire as per tender specification
Procurement of 8swg gi wire as per tender specification
Read moreProcurement of 7/10swg guy wire-gi as per tender specification.
Procurement of 7/10swg guy wire-gi as per tender specification.
Read moreKtps v vi stages-ksp dam-providing painting including replacements of rubber seals and supply and fixing of 38mm dia wire ropes to the spillway radial crest gates of ksp dam,paloncha, bhadradri kothagudem dist.
Ktps v vi stages-ksp dam-providing painting including replacements of rubber seals and supply and fixing of 38mm dia wire ropes to the spillway radial crest gates of ksp dam,paloncha, bhadradri kothagudem dist.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Read moreHard drawn grooved copper contact wire
For complete deion and other details, please refer to tender
Read moreHard drawn grooved copper contact wire
For complete deion and other details, please refer to tender
Read moreHard drawn grooved copper contact wire
For complete deion and other details, please refer to tender
Read moreHard drawn grooved copper contact wire
For complete deion and other details, please refer to tender
Read moreof your Industry type