Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Systematic Rail Track Upkeep Inside Rsp.
|
| Description |
Systematic Rail Track Upkeep Inside Rsp.
|
| Organisation | Steel Authority of India Ltd | Public Sector Undertakings |
| Tender Id | 100825 |
|
Reference Number |
54(1)/EESM(C)-I/CPWD/19 |
| Tender Fee | 0 |
| EMD | 10 Lakh |
| Tender Value | - |
| Place | Rourkela Steel Plant |
| Link |
View Original Tender Notice
https://sailtenders.co.in/Home/TendDetails?hTend=100825 |
| Start Date | February 19, 2025 21:30 |
| End Date |
Expired
11/03/2025
Expired 586 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Abrasive disc type rail cutter,rail roller,j clamp for ballastless track,rail dolly adequately insulated,erc applicator panpuller,rail jack for ballastless track
Abrasive disc type rail cutter,rail roller,j clamp for ballastless track,rail dolly adequately insulated,erc applicator panpuller,rail jack for ballastless track
Read moreMotorised guided rail track lifting arrangement
Motorised guided rail track lifting arrangement
Read moreRegular cleaning of drains adjacent to track hopper and rail line and other related works inside plant at dvc, rtps.
Regular cleaning of drains adjacent to track hopper and rail line and other related works inside plant at dvc, rtps.
Read moreProviding and fixing new rail barricade by replacing old damaged rusted rail barricade at indian elephant enclosure inside zoo gardens mysuru
Providing and fixing new rail barricade by replacing old damaged rusted rail barricade at indian elephant enclosure
Read moreSupply of baricades for systematic flow of traffic moga
Supply of baricades for systematic flow of traffic moga
Read moreService contract for round the clock operation of in-plant rail movement control cabin for sgtpp inside rail yard for two (02) years.
Service contract for round the clock operation of in-plant rail movement control cabin for sgtpp inside rail yard for two (02) years.
Read moreInstallation testing and commissioning of glued rail jointing entry and exit and associated track leveling, packing, and maintenance works at 140 ton rail weighbridge site
Installation,testing and commissioning of glued rail jointing entry and exit and associated track leveling, packing, and maintenance works at 140 ton rail weighbridge site
Read moreDismantling of ballast less track of oil decanting rail siding in sstpp, dongalia for gct-i.
Dismantling of ballast less track of oil decanting rail siding in sstpp, dongalia for gct-i.
Read moreMachine crushed stone ballast of size: 65-60 mm for 52 kg rail track system as per latest rdso stand,machine crushed stone ballast of size: 65-60 mm for 60 kg rail track system as per latest rdso stand
Machine crushed stone ballast of size: 65-60 mm for 52 kg rail track system as per latest rdso stand,machine crushed stone ballast of size: 65-60 mm for 60 kg rail track system as per latest rdso stand
Read moreSystematic maintenance of railway siding at fsd kakatur for the year 2026 27
Systematic maintenance of railway siding at fsd kakatur for the year 2026 27
Read moreof your Industry type