Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Maintenance And House Keeping Work Of Administrative Building 1st And 2nd Floor, Water Treatment Plant Site, Tank No. I For The Period From 01.07.2026 To 31.03.2027 Under Ntk Project.
|
| Description |
Maintenance And House Keeping Work Of Administrative Building 1st And 2nd Floor, Water Treatment Plant Site, Tank No. I For The Period From 01.07.2026 To 31.03.2027 Under Ntk Project.
|
| Organisation | PHE | State Govt. and UT |
| Tender Id | 2026_PHED_1024467_1 |
|
Reference Number |
PHE/NTKD-II/e-13 OF 2026-2027 |
| Tender Fee | 0 |
| EMD | 4496 |
| Tender Value | - |
| Place | Work |
| Link |
View Original Tender Notice
https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=2517729 |
| Start Date | May 16, 2026 17:30 |
| End Date |
Expired
25/05/2026
Expired 145 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Providing fixing props at g.f., 1st floor and 2nd floor, t ward administrative building mulund west in t ward beat no. 107
Providing fixing props at g.f., 1st floor and 2nd floor, t ward administrative building mulund west in t ward beat no. 107
Read moreElectrical and ac installation works for offices of the controller of examinations 1st floor of old administrative building in the campus of vidyasagar university
Electrical and ac installation works for offices of the controller of examinations 1st floor of old administrative building in the campus of vidyasagar university
Read moreRepair and renovation for damage wall treatment of the north west toilet blocks at 1st floor of bhagirathi bhavan at lalgola open air correctional home
Repair and renovation for damage wall treatment of the north west toilet blocks at 1st floor of bhagirathi bhavan at lalgola open air correctional home
Read moreReplacement of electric services with repair and finishing work including proper treatment of expansion joints of 1st and 2nd floor corridor, tutorial building , university of delhi
Replacement of electric services with repair and finishing work including proper treatment of expansion joints of 1st and 2nd floor corridor, tutorial building , university of delhi
Read moreRepairing and renovation of office chamber of assistant engineer ai barasat ai sub division and divisional accountant chamber of barasat ai division administrative building 1st floor opposite hatipukur barasat north 24 parganas
Repairing and renovation of office chamber of assistant engineer ai barasat ai sub division and divisional accountant chamber of barasat ai division administrative building 1st floor opposite hatipukur barasat north 24 parganas
Read moreSitc of acoustic wall treatment as per scope of work and site condition,sitc acoustic floor carpet tiles as per scope of work and site condition,nrc acoustic ceiling tiles as per scope of work and site condition,acoustic sound isolated door complete with frame as per scope of work and site condition,dismantling of existing structure as per scope of work,hvac duct extension modification as per scope of work and site condition,sealing of existing windows as per scope of work and site condition,disposal of debris
Sitc of acoustic wall treatment as per scope of work and site condition,sitc acoustic floor carpet tiles as per scope of work and site condition,nrc acoustic ceiling tiles as per scope of work and site condition,acoustic sound isolated door complete with frame as per scope of work and site condition,dismantling of existing structure as per scope of work,hvac duct extension modification as per scope of work and site condition,sealing of existing windows as per scope of work and site condition,disposal of debris
Read moreAnnual maintenance for cleaning the blockage of trunk sewer line at al-ce block under ntk project for the year 2026-2027. (w.e.f. 01.07.2026 to 31.03.2027)
Annual maintenance for cleaning the blockage of trunk sewer line at al-ce block under ntk project for the year 2026-2027. (w.e.f. 01.07.2026 to 31.03.2027)
Read moreCr to house keeping services and cleaning premises of administrative bldg at andheri (w), mumbai ground floor, 1st , 2nd and 3rd floor
Cr to house keeping services and cleaning premises of administrative bldg at andheri (w), mumbai ground floor, 1st , 2nd and 3rd floor
Read moreAntitermite treatment at tagore library building ground floor and 1st floor
Antitermite treatment at tagore library building ground floor and 1st floor
Read moreof your Industry type