Tender Details

Particulars Details
Title
Re Conditioning Of Torque Flow Transmission Assembly For Dozer Bd 155 A 1
Description
Re Conditioning Of Torque Flow Transmission Assembly For Dozer Bd 155 A 1
Organisation THE WEST BENGAL POWER DEVELOPMENT CORPORATION LTD. | State Govt. and UT
Tender Id 2025_WBPDC_831620_1
Reference
Number
GM(K)/CC/WS/3696/ E3302/24-25
Tender Fee 0
EMD 10712
Tender Value -
Place KTPS,Mecheda,Purba Medinipur
Link
View Original Tender Notice

https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1852344

Start Date April 11, 2025 21:30
End Date
Expired 30/04/2025

Expired 529 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Laying of cc road from pillar no 155 to donald school lane in shiva nagar in ward-61, attapur division in rajendranagar circle-11 ghmc (reserved for the team of st contractors include the individual st contractors, proprietor firms, partnership firms and private limited companies) (rs 19.00 lakhs) (re call)

Laying of cc road from pillar no 155 to donald school lane in shiva nagar in ward-61, attapur division in rajendranagar circle-11 ghmc (reserved for the team of st contractors include the individual st contractors, proprietor firms, partnership firms and private limited companies) (rs 19.00 lakhs) (re call)

Read more
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.

Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.

Read more
Reconditioning of torque flow transmission assy for dozer bd 155 a 1

Reconditioning of torque flow transmission assy for dozer bd 155 a 1

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise