Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Re Conditioning Of Torque Flow Transmission Assembly For Dozer Bd 155 A 1
|
| Description |
Re Conditioning Of Torque Flow Transmission Assembly For Dozer Bd 155 A 1
|
| Organisation | THE WEST BENGAL POWER DEVELOPMENT CORPORATION LTD. | State Govt. and UT |
| Tender Id | 2025_WBPDC_831620_1 |
|
Reference Number |
GM(K)/CC/WS/3696/ E3302/24-25 |
| Tender Fee | 0 |
| EMD | 10712 |
| Tender Value | - |
| Place | KTPS,Mecheda,Purba Medinipur |
| Link |
View Original Tender Notice
https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1852344 |
| Start Date | April 11, 2025 21:30 |
| End Date |
Expired
30/04/2025
Expired 529 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Laying of cc road from pillar no 155 to donald school lane in shiva nagar in ward-61, attapur division in rajendranagar circle-11 ghmc (reserved for the team of st contractors include the individual st contractors, proprietor firms, partnership firms and private limited companies) (rs 19.00 lakhs) (re call)
Laying of cc road from pillar no 155 to donald school lane in shiva nagar in ward-61, attapur division in rajendranagar circle-11 ghmc (reserved for the team of st contractors include the individual st contractors, proprietor firms, partnership firms and private limited companies) (rs 19.00 lakhs) (re call)
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Read moreReconditioning of torque flow transmission assy for dozer bd 155 a 1
Reconditioning of torque flow transmission assy for dozer bd 155 a 1
Read moreCustom bid for services - servicing & overhauling of bd 155 dozer transmission assembly and torque
Read more
M6515151072 bd-155: pump assy. pn--190300010002,m6515151528 bd-155: torque convertor assembly
Read more
Bull dozer bd-355, beml,dozer assy, beml, dozer, bd-155,dozer assy, beml, dozer, bd-155,dozer assy,
Read more
of your Industry type