Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Application And Supply Of Ceramic Fiber Pad Insulation And Thermal Insulation On Pipe Lines, Valves, Re Generative Equipments Etc. During Annual Overhauling Of Unit No. 3 Of 3x210 Mw, Atps, Anpara
|
Description |
Application And Supply Of Ceramic Fiber Pad Insulation And Thermal Insulation On Pipe Lines, Valves, Re Generative Equipments Etc. During Annual Overhauling Of Unit No. 3 Of 3x210 Mw, Atps, Anpara
|
Organisation | UP Rajya Vidyut Utpadan Nigam Ltd | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 590 |
EMD | 20000 |
Tender Value | |
Place | Anpara |
Link |
AAAAAAAAAA Login to view |
Start Date | May 09, 2025 19:30 |
End Date |
23/06/2025 ( 4 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Annual overhauling of turbine and generator of unit no.-3 of 3x210mw, atps, anpara
Annual overhauling of turbine and generator of unit no.-3 of 3x210mw, atps, anpara
Read moreInsulation, refractory and removal of fly ash, debris from pressure part, ducts, hoppers and roof of pent house etc. during overhauling of unit-03, 3x210 m.w., atps, anpara
Insulation, refractory and removal of fly ash, debris from &#x0d pressure part, ducts, hoppers and roof of pent house etc. during &#x0d overhauling of unit-03, 3x210 m.w., atps, anpara
Read moreOverhauling of medium pressure pumps unit drain tank unit flash tanks hot well cleaning, overhauling of working oil and lub oil coolers of bfps of unit no.3 3x210mw of atps, anpara.
Overhauling of medium pressure pumps unit drain tank unit flash tanks hot well cleaning, overhauling of working oil and lub oil coolers of bfps of unit no.3 3x210mw of atps, anpara.
Read moreOverhauling of condensate extraction pumps weir make and hydraulic coupling voith make for unit 3 of 3x210mw, atps anpara
Overhauling of condensate extraction pumps weir make and hydraulic coupling voith make for unit 3 of 3x210mw, atps anpara
Read moreRepairs of long angle and short angle suction strainer baskets of bfp, suction line strainer of raw water line, mot strainer and cep strainer of unit 3 of 3x210mw, atps, anpara.
Repairs of long angle and short angle suction strainer baskets of bfp, suction line strainer of raw water line, mot strainer and cep strainer of unit 3 of 3x210mw, atps, anpara.
Read moreOverhauling of bfp and its booster pump of unit # 3 of 3x210mw,atps,anpara
Overhauling of bfp and its booster pump of unit # 3 of 3x210mw,atps,anpara
Read moreService contract for refractory and insulation work de insulation and re insulation with sheet cladding work of different portion of boiler area different ducts pipe lines and valves etc under bmii dept during unit 3 overhauling at sgtpp
Service contract for refractory and insulation work de insulation and re insulation with sheet cladding work of different portion of boiler area different ducts pipe lines and valves etc under bmii dept during unit 3 overhauling at sgtpp&#x0d &#x0d &#x0d
Read moreSupply and application of thermal insulation on door delivery basis at hbl integrated sugar plant, sugauli, east champaran and lauriya, west champaran, bihar
Supply and application of thermal insulation on door delivery basis at hbl integrated sugar plant, sugauli, east champaran and lauriya, west champaran, bihar
Read moreSupply and application of insulation materials on pipe, equipment for part a and part b as per standard specification by providing all required materials in connection with the composite work for setting upof hpg-2, butene-1 and psa units atlepetkata
Supply and application of insulation materials on pipe, equipment for part a and part b as per standard specification by providing all required materials in connection with the composite work for setting upof hpg-2, butene-1 and psa units atlepetkata
Read moreCondenser tubes cleaning through bullet shot method during annual oh of unit no.-3 of 3x210mw, atps, anpara
Condenser tubes cleaning through bullet shot method during annual oh of unit no.-3 of 3x210mw, atps, anpara
Read moreof your Industry type