Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Improvements Of Water Supply At Bohlaj Pora Akhoon Lane By Way Of Laying And Fitting Of 40,25,20mm Dia Gi Pipeline.
|
| Description |
Improvements Of Water Supply At Bohlaj Pora Akhoon Lane By Way Of Laying And Fitting Of 40,25,20mm Dia Gi Pipeline.
|
| Organisation | Government of Jammu and Kashmir |
| Tender Id | 2023_PHE_227699_5 |
|
Reference Number |
E-NIT No. 17/WWD of 2023-24 |
| Tender Fee | 200 |
| EMD | 1040 |
| Tender Value | - |
| Place | Office of the Executive Engineer Water Works Divis |
| Link |
View Original Tender Notice
https://jktenders.gov.in |
| Start Date | August 26, 2023 22:30 |
| End Date |
Expired
01/09/2023
Expired 1138 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Repair and maintenance of 150 mm dia main gi pipeline from plant to sivariya township by laying of new 150 mm dia gi pipeline over rcc pedestals.
Repair and maintenance of 150 mm dia main gi pipeline from plant to sivariya township by laying of new 150 mm dia gi pipeline over rcc pedestals.
Read moreReplacement of 40mm dia old pipeline at syed colony habak by way of laying/ fixing of 50mm dia shunt line for wss zakura (distt. capex)
Replacement of 40mm dia old pipeline at syed colony habak by way of laying/ fixing of 50mm dia shunt line for wss zakura (distt. capex)
Read moreExtension of distribution network by way of providing / fitting of 20mm dia g.i. pipe-line at meerakshah colony zakura district capex
Extension of distribution network by way of providing / fitting of 20mm dia g.i. pipe-line at meerakshah colony zakura district capex
Read moreSupply and laying of 3 inch gi pipe,supply and laying of 4 inch gi pipe,dismantling of 3 in pipe,dismantling of 4 in pipe,modification of pipeline 3 inch,modification of pipeline 4 inch,welding inch dia,supply and installation of sprinkler nozzle
Supply and laying of 3 inch gi pipe,supply and laying of 4 inch gi pipe,dismantling of 3 in pipe,dismantling of 4 in pipe,modification of pipeline 3 inch,modification of pipeline 4 inch,welding inch dia,supply and installation of sprinkler nozzle
Read moreRunning maintenance of uws scheme under gomati district tripura/ sh- mtc. of pvc, ci, di, and gi pipeline including extension and washing of pipeline, repairing of leakage, fitting fixing of sluice valves, tyton collars etc. in different water supply
Running maintenance of uws scheme under gomati district tripura/ sh- mtc. of pvc, ci, di, and gi pipeline including extension and washing of pipeline, repairing of leakage, fitting fixing of sluice valves, tyton collars etc. in different water supply
Read moreProviding drinking water facility to mining affected area in gp dhoun kothi dhar tatoh jamthal pajgain barmana in tehsil sadar district bilaspur (sh laying jointing and testing of parallel gi pipeline of 50mm dia for village barmana).
Providing drinking water facility to mining affected area in gp dhoun kothi dhar tatoh jamthal pajgain barmana in tehsil sadar district bilaspur (sh laying jointing and testing of parallel gi pipeline of 50mm dia for village barmana).
Read moreRep and maint of ext water supply distribution network inclu replacement of defec gi/ci pipeline, fitting and fixture, overhaul of pump set and motor, mech laundry installation and other allied work at altinho, bambolim and panaji area under ge panaj
Rep and maint of ext water supply distribution network inclu replacement of defec gi/ci pipeline, fitting and fixture, overhaul of pump set and motor, mech laundry installation and other allied work at altinho, bambolim and panaji area under ge panaj
Read moreXlpe cable for working voltage up to and including 1.1 kv marked to is 7098 (part 1),xlpe cable for working voltage up to and including 1.1 kv marked to is 7098 (part 1),xlpe cable for working voltage up to and including 1.1 kv marked to is 7098 (part 1),xlpe cable for working voltage up to and including 1.1 kv marked to is 7098 (part 1),terminal ends for aluminium conductors of insulated cables (compression cable lugs) conforming to is 8309,terminal ends for aluminium conductors of insulated cables (compression cable lugs) conforming to is 8309,terminal ends for aluminium conductors of insulated cables (compression cable lugs) conforming to is 8309,gi pipe 50mm bore light grade with fitting for cable protection,copper tubing of size 1 by 2 inch,copper tubing of size 1 by 4 inch,sub main wiring system size of wire 4.0 sqmm frls,sub main wiring system size of wire 6.0 sqmm frls,mcb distribution box spn4 way,mcb distribution box spn 8 way,triple pole and neutral 4 way db double door,mcb sp of rating capacity 6
Xlpe cable for working voltage up to and including 1.1 kv marked to is 7098 (part 1),xlpe cable for working voltage up to and including 1.1 kv marked to is 7098 (part 1),xlpe cable for working voltage up to and including 1.1 kv marked to is 7098 (part 1),xlpe cable for working voltage up to and including 1.1 kv marked to is 7098 (part 1),terminal ends for aluminium conductors of insulated cables (compression cable lugs) conforming to is 8309,terminal ends for aluminium conductors of insulated cables (compression cable lugs) conforming to is 8309,terminal ends for aluminium conductors of insulated cables (compression cable lugs) conforming to is 8309,gi pipe 50mm bore light grade with fitting for cable protection,copper tubing of size 1 by 2 inch,copper tubing of size 1 by 4 inch,sub main wiring system size of wire 4.0 sqmm frls,sub main wiring system size of wire 6.0 sqmm frls,mcb distribution box spn4 way,mcb distribution box spn 8 way,triple pole and neutral 4 way db double door,mcb sp of rating capacity 6
Read moreImprovements of water supply to shuhama alusteng by way of laying and fitting of 40,25,20mm dia gi pipeline.
Improvements of water supply to shuhama alusteng by way of laying and fitting of 40,25,20mm dia gi pipeline.
Read moreImprovements of water supply to lane no. 5 buchwara, khalpora dalgate by way of laying and fitting of 40,25,20mm dia g.i pipeline.
Improvements of water supply to lane no. 5 buchwara, khalpora dalgate by way of laying and fitting of 40,25,20mm dia g.i pipeline.
Read moreof your Industry type