Tender Details
Particulars | Details |
---|---|
Title |
Lignocaine Hcl 2 Percent With Adrenaline 1 Is To 80000 30 Ml,Lignocaine Hcl 2 Percent Without Adren
|
Description |
|
Organisation | Department of Military Affairs | Ministry of Defence |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | |
EMD | |
Tender Value | |
Place | |
Link |
AAAAAAAAAA Login to view |
Start Date | April 23, 2025 17:02 |
End Date |
14/05/2025 ( 20 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Lignocaine hcl 2 percent with adrenaline 1 is to 80000 30 ml,lignocaine hcl 2 percent without adren
Read more
Lignocaine hcl two percent without adrenmaline thirty ml,injection diclofenac 25 mg per ml 3 ml 360
Read more
Amiodarone hcl 150 mg 3 ml inj,morphine 15 mg 1 ml inj,phenylephrine 10 mg 1 ml inj,lignocaine 2 pe
Read more
Ketamine hcl 50 mg per ml, 2 ml inj,lignocaine hcl 2 percent, without adrenaline, 30 ml inj, suitab
Read more
Bupivacaine hcl 5mg per ml inj,lidocaine lignocaine hcl 2 percent with adrenaline epinephrine 1.800
Read more
Inj noradrenaline 4ml ampoule with 1 mg per ml,inj adrenaline 1 ml ampoule with 2 mg,inj atropine 1
Read more
Paracetamol with cysteine hcl monohydrate infusion 1000 mg per 100ml,adrenaline tatrate inj 1 in 10
Read more
Supply of hand pump spare parts i.s.i. mark and conforming to is/5500 part (1) ball bearing 20 bc opp (2) hexagonal bolt m-12 x1.75 x40 (3) hexagonal nut m-12 x 1.75 (4) hexagonal coupler m 12 x 1.75 (5) reducer cap (6) cylinder with brass line
Supply of hand pump spare parts i.s.i. mark and conforming to is/5500 part (1) ball bearing 20 bc opp (2) hexagonal bolt m-12 x1.75 x40 (3) hexagonal nut m-12 x 1.75 (4) hexagonal coupler m 12 x 1.75 (5) reducer cap&#x0d (6) cylinder with brass line
Read moreWidening and heightening of drift from seam-iii to seam-ii, 0le between incline no. 1 to incline no. 2 and cleaning of fallen coal gallery with support of roof in seam-iii of katkona 1 and 2 incline.
Widening and heightening of drift from seam-iii to seam-ii, 0le between incline no. 1 to incline no. 2 and cleaning of fallen coal gallery with support of roof in seam-iii of katkona 1 and 2 incline.
Read moreof your Industry type