Tender Details
Particulars | Details |
---|---|
Title |
Construction Of Modified Leach Pit With Silt Chamber 9 Nos At Nahazari Mouza Of Nahazari Gram Panchayet For 5 Hh Phase Ii
|
Description |
Construction Of Modified Leach Pit With Silt Chamber 9 Nos At Nahazari Mouza Of Nahazari Gram Panchayet For 5 Hh Phase Ii
|
Organisation | Zilla Parishad | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 500 |
EMD | 6410 |
Tender Value | |
Place | NAHAZARI |
Link |
AAAAAAAAAA Login to view |
Start Date | May 08, 2025 22:30 |
End Date |
17/05/2025 ( 4 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreConstruction of fob at km 6.420 (amity university), grade separated structures/flyover at km 7.965 and 8.075 (riico kant kalwar), 11.780 (achrol) and 25.300 (kukas) with slip road on nh-248 for rectification of identified blackspots/accident spots in
Construction of fob at km 6.420 (amity university), grade separated structures/flyover at km 7.965 and 8.075 (riico kant kalwar), 11.780 (achrol) and 25.300 (kukas) with slip road on nh-248 for rectification of identified blackspots/accident spots in
Read moreConstruction of common intake for jaipur, ajmer and tonk districts and laying of the raw water main pipeline under the bisalpur jaipur water supply project, stage-ii phase-ii
Construction of common intake for jaipur, ajmer and tonk districts and laying of the raw water main pipeline under the bisalpur jaipur water supply project, stage-ii phase-ii&#x0d name of subwork- construction of 1000 mld intake pump house for jaipur an
Read moreDrilling, installation and maintainance of 5 nos. of tube well (solar) at mouza-dudhe budhe and gobrageriya under keshiary block in the district of paschim medinipur under dpmu, paschim medinipur, wbadmi project ph-ii
Drilling, installation and maintainance of 5 nos. of tube well (solar) at mouza-dudhe budhe and gobrageriya under keshiary block in the district of paschim medinipur under dpmu, paschim medinipur, wbadmi project ph-ii
Read moreVac, tvs along with electrical and scada works for 6 ug stations in c5 and 12 ug stations in c3 of phase-2 cmrl project including integration at occ level.
Vac, tvs along with electrical and scada works for 6 ug stations in c5 and 12 ug stations in c3 including integration at occ level.
Read moreConsultancy services for ae for supervision of construction of rob with approaches in lieu of railway crossing lc 20 on nh 161h at km 24-913 (near nandura) in the state of maharashtra on epc mode.
Consultancy services for ae for supervision of construction of rob with approaches in lieu of railway crossing lc 20 on nh 161h at km 24-913 (near nandura) in the state of maharashtra on epc mode.
Read moreConstruction of eklavya model residential school (emrs) at village bero, district - ranchi, jharkhand (phase - ii)
Construction of eklavya model residential school (emrs) at village bero, district - ranchi, jharkhand (phase - ii)
Read moreManufacture and supply of 24000 nos of 9 m 300kg wl psc poles as per rec design cast in twin mould form boxes at poothamedu psc yard for a period of two years
Manufacture and supply of 24000 nos of 9 m 300kg wl psc poles as per rec design cast in twin mould form boxes at poothamedu psc yard for a period of two years
Read moreProvn of central heating system (chs) for otm accn of engineer regiment (phase-ii complete bldgs) at khumbathang under ge khumbathang
Provn of central heating system (chs) for otm accn of engineer regiment (phase-ii complete bldgs) at khumbathang under ge khumbathang
Read moreConstruction of stack yard for storing of tower materials with concrete approach pathway and open stackyard at bankura 132/33 kv sub station under bankura area office wbsetcl
Construction of stack yard for storing of tower materials with concrete approach pathway and open stackyard at bankura 132/33 kv sub station under bankura area office wbsetcl
Read moreof your Industry type