Tender Details
Particulars | Details |
---|---|
Title |
Maintenance Of Phs In Various Govt Residential Houses Type 3 And 4 Under Maintenance Booth Sector 7 Chandigarh Ch To 2216 Np Rb
|
Description |
Maintenance Of Phs In Various Govt Residential Houses Type 3 And 4 Under Maintenance Booth Sector 7 Chandigarh Ch To 2216 Np Rb
|
Organisation | Chandigarh Administration | State Govt. and UT |
Tender Id | 2024_CHD_83249_1 |
Reference Number |
PH3/2024/371 |
Tender Fee | 0 |
EMD | 10024 |
Tender Value | |
Place | CHANDIAGRH |
Link | https://etenders.chd.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=102435 |
Start Date | November 07, 2024 22:30 |
End Date |
14/11/2024 ( Expired 185 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Reconstruction of narrow minor bridge 3 nos. to four lane configuration n.h.63 section kuslamb yedshi at ch. 4.113 and 9.748 and 10.203 on epc mode in the state of maharashtra
Reconstruction of narrow minor bridge 3 nos. to four lane configuration n.h.63 section kuslamb yedshi at ch. 4.113 and 9.748 and 10.203 on epc mode in the state of maharashtra
Read moreDevelopment, operation and maintenance of wayside amenities 3 o -m sites in uttar pradesh and 1 o-m site in odisha (4 o-m sites)nh-27/gorakhpur/up
Development, operation and maintenance of wayside amenities 3 o -m sites in uttar pradesh and 1 o-m site in odisha (4 o-m sites)nh-27/gorakhpur-kushinagar /285-177/ lhs/jagdishpur/uttar pradesh
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreMaintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Read moreRectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Read moreBiennial rc for repairing of coal bunker (as and when required basis) under boiler maintenance department of unit-3 to 6, ktps
Biennial rc for repairing of coal bunker (as and when required basis) under boiler maintenance department of unit-3 to 6, ktps
Read moreDevelopment of 4-lane access controlled gf regional expressway on northern side of hyderabad from islampur village (design ch.59.000) to pragnapur village (design ch.82.000) length of 23.000 km in telangana under nh(o) on epc mode (package-iii)
Development of 4-lane access controlled gf regional expressway on northern side of hyderabad from islampur village (design ch.59.000) to pragnapur village (design ch.82.000) length of 23.000 km in telangana under nh(o) on epc mode (package-iii)
Read moreDevelopment of 4-lane access controlled gf regional expressway on northern side of hyderabad from girmapur village (design ch.-1.518) to reddipalle village (designch.33.000) length of 34.518km in telangana under nh(o) on epc mode (package-i)
Development of 4-lane access controlled gf regional expressway on northern side of hyderabad from girmapur village (design ch.-1.518) to reddipalle village (designch.33.000) length of 34.518km in telangana under nh(o) on epc mode (package-i)
Read moreDevelopment of 4-lane access controlled gf regional expressway on northern side of hyderabad from rayagiri village (design ch.125.000) to tangad palle village (design ch. 160.000) length of 35.000 km in telangana under nh(o) on epc mode (package-v)
Development of 4-lane access controlled gf regional expressway on northern side of hyderabad from rayagiri village (design ch.125.000) to tangad palle village (design ch. 160.000) length of 35.000 km in telangana under nh(o) on epc mode (package-v)
Read moreof your Industry type