Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Class Iii Digital Signature Certificate With Token
|
| Description |
Class Iii Digital Signature Certificate With Token
|
| Organisation | Government of Maharashtra |
| Tender Id | 2023_BEST_939560_1 |
|
Reference Number |
DMM(G)/02/77268/707/2023-24/CL |
| Tender Fee | 300 |
| EMD | 3000 |
| Tender Value | - |
| Place | Dadar |
| Link |
View Original Tender Notice
https://mahatenders.gov.in |
| Start Date | August 30, 2023 14:30 |
| End Date |
Expired
11/09/2023
Expired 1084 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Appointment of agency for providing new service connection with infra extension upto 150 kw (nsc phase-iii) in electric supply circle patna under jurisdiction of sbpdcl in bihar under “new service connection phase iii scheme”.
Appointment of agency for providing new service connection with infra extension upto 150 kw (nsc phase-iii) in electric supply circle patna under jurisdiction of sbpdcl in bihar under “new service connection phase iii scheme”.
Read moreProcurement of 33,000 nos. of 15mm dia multi jet class b magnetic type water meters conforming to is 779/1994 or iso 4064/2014 with its latest amendments.-ez
Procurement of 33,000 nos. of 15mm dia multi jet class b magnetic type water meters conforming to is 779/1994 or iso 4064/2014 with its latest amendments-ez
Read moreResurvey of malali rf block i,ii, iii reserved forest, with its boundary length measuring approximately 41.20 km in nagara range, sagara division, during 2026-27.
Resurvey of malali rf block i,ii, iii reserved forest, with its boundary length measuring approximately 41.20 km in nagara range, sagara division, during 2026-27.
Read moreResurvey of albady block bit iii a & b reserved forest, with its boundary length measuring approximately 6.50 km in hebri range, kundapura division, during 2026-27.
Resurvey of albady block bit iii a & b reserved forest, with its boundary length measuring approximately 6.50 km in hebri range, kundapura division, during 2026-27.
Read moreGroup- a anatomy digital metaphase slide scanner system co2 incubator microprocessor-controlled class ii a2 type bio-safety cabinet cyclomixture weighing machine (electronic analytical and precision balances) water bath fully automated autoclave large centrifuge machine mini centrifuge machine laboratory refrigerator (cold cabinet) (4 to 10 degree c) -20 (minus twenty) degree c freezer microvolume spectrophotometer gel documentation system digital vortex mixer gradient pcr machine
Group- a anatomy digital metaphase slide scanner system co2 incubator microprocessor-controlled class ii a2 type bio-safety cabinet cyclomixture weighing machine (electronic analytical and precision balances) water bath fully automated autoclave large centrifuge machine mini centrifuge machine laboratory refrigerator (cold cabinet) (4 to 10 degree c) -20 (minus twenty) degree c freezer microvolume spectrophotometer gel documentation system digital vortex mixer gradient pcr machine single channel electronic pipettes ph meter slide warning plate
Read moreHiring of not less than 500tph capacity mobile/semi-mobile crusher for crushing total quantity of 39lt of coal to -100mm size (in all dimensions) including provision , installation of 1 crushing unit with all infrastructure with crushing and loading the crushed coal at rg oc-iii project, rg-2 area for a period of 3 years. in division no:corp-mp.
Hiring of not less than 500tph capacity mobile/semi-mobile crusher for crushing total quantity of 39lt of coal to -100mm size (in all dimensions) including provision , installation of 1 crushing unit with all infrastructure with crushing and loading the crushed coal at rg oc-iii project, rg-2 area for a period of 3 years. in division no:corp-mp.
Read moreHiring of not less than 500tph capacity mobile/semi-mobile crusher for crushing total quantity of 39lt of coal to -100mm size (in all dimensions) including provision , installation of 1 crushing unit with all infrastructure with crushing and loading the crushed coal at rg oc-iii project, rg-2 area for a period of 3 years. in division no:corp-mp.
Hiring of not less than 500tph capacity mobile/semi-mobile crusher for crushing total quantity of 39lt of coal to -100mm size (in all dimensions) including provision , installation of 1 crushing unit with all infrastructure with crushing and loading the crushed coal at rg oc-iii project, rg-2 area for a period of 3 years. in division no:corp-mp.
Read moreHiring of 2 (two) nos not less than 500 tph capacity mobile/semi-mobile crushers for crushing of 47.4 lt of coal to (-)100mm size (in all dimensions) including provision , installation of crushing unit with all infrastructure with crushing and conveying the crushed coal on to sccl conveyors including operation and maintenance of the crusher/semi-mobile crusher and other allied jobs for a period of 3 years at ktk oc-iii, bhp area. in division no:corp-mp.
Hiring of 2 (two) nos not less than 500 tph capacity mobile/semi-mobile crushers for crushing of 47.4 lt of coal to (-)100mm size (in all dimensions) including provision , installation of crushing unit with all infrastructure with crushing and conveying the crushed coal on to sccl conveyors including operation and maintenance of the crusher/semi-mobile crusher and other allied jobs for a period of 3 years at ktk oc-iii, bhp area. in division no:corp-mp.
Read moreHiring of 2 (two) nos not less than 500 tph capacity mobile/semi-mobile crushers for crushing of 47.4 lt of coal to (-)100mm size (in all dimensions) including provision , installation of crushing unit with all infrastructure with crushing and conveying the crushed coal on to sccl conveyors including operation and maintenance of the crusher/semi-mobile crusher and other allied jobs for a period of 3 years at ktk oc-iii, bhp area. in division no:corp-mp.
Hiring of 2 (two) nos not less than 500 tph capacity mobile/semi-mobile crushers for crushing of 47.4 lt of coal to (-)100mm size (in all dimensions) including provision , installation of crushing unit with all infrastructure with crushing and conveying the crushed coal on to sccl conveyors including operation and maintenance of the crusher/semi-mobile crusher and other allied jobs for a period of 3 years at ktk oc-iii, bhp area. in division no:corp-mp.
Read moreResurvey of balpa rf block bit i, ii & iii proposed reserved forests notified u/s 4 of kfa-1963 with its boundary length measuring approximately 6.75 km in panja range, mangalore division, during 2026-27, in order to provide technical support to the fso & the dcf during the process of settlement and preparation of settlement map to be signed jointly by the both and also for preparation of tie-line map and draft notification proposed u/s 17 of kfa 1963.
Resurvey of balpa rf block bit i, ii & iii proposed reserved forests notified u/s 4 of kfa-1963 with its boundary length measuring approximately 6.75 km in panja range, mangalore division, during 2026-27, in order to provide technical support to the fso & the dcf during the process of settlement and preparation of settlement map to be signed jointly by the both and also for preparation of tie-line map and draft notification proposed u/s 17 of kfa 1963.
Read moreof your Industry type