Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Raising Koc 2 Ha, Yellandu Area
|
| Description |
Raising And 1st Year Maintenance Of Ob Dump Plantation Of 2 Ha At Kocp, Yellandu Area During The Year 2025 27
|
| Organisation | Information Technology Electronics and Communication Department Telangana | State Govt. and UT |
| Tender Id | 581769 |
|
Reference Number |
YLD/FTY/A/2025/02 |
| Tender Fee | 40 |
| EMD | 5650 |
| Tender Value | - |
| Place | TS |
| Link |
View Original Tender Notice
http://eprocurement.telangana.gov.in/ |
| Start Date | May 20, 2025 20:30 |
| End Date |
Expired
03/06/2025
Expired 487 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Hiring of 2wd tyre mounted loader (backhoe) for 12 hrs availability, 250 hrs per month for a period of 2 years for rgoc-2
Hiring of 2wd tyre mounted loader (backhoe) for 12 hrs availability, 250 hrs per month for a period of 2 years for rgoc-2
Read moreHiring of 2 nos. of diesel operated wheel mounted loaders with backhoe bucket (0.26 cu.m) and loading bucket (1.1 cu.m) for 36 months one at each section of pkoc, manuguru for improvement of quality of coal - reg.
Hiring of 2 nos. of diesel operated wheel mounted loaders with backhoe bucket (0.26 cu.m) and loading bucket (1.1 cu.m) for 36 months one at each section of pkoc, manuguru for improvement of quality of coal - reg.
Read moreConsultancy services of independent engineer services for upgradation to 2 lane with paved shoulders from design km 0.000 to km 48.742 and km 61.732 to km 102.284 of bagasara-una section of nh-351k in the state of gujarat on hybrid annuity mode
Consultancy services of independent engineer services for upgradation to 2 lane with paved shoulders from design km 0.000 to km 48.742 and km 61.732 to km 102.284 of bagasara-una section of nh-351k in the state of gujarat on hybrid annuity mode
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Read moreRevisiting of koc, 19 ha yellandu area
Revisiting of old ob dump plantation in koc project in yellandu area during the year 2025-26
Read moreRaising and 1st year maintenance of ob dump plantation in an area of about 12 ha at koc project, yellandu area during the year 2024-26
Raising and 1st year maintenance of ob dump plantation in an area of about 12 ha at koc project, yellandu area during the year 2024-26
Read moreBalance works for providing barbed wire fencing around koc mine yellandu area
Balance works for providing barbed wire fencing around koc mine yellandu area
Read moreRaising con and maintenance of different bag size (rts, 5x9 6x12) at koc nursery, yellandu area during the year 2024-25
Raising con and maintenance of different bag size (rts, 5x9 6x12) at koc nursery, yellandu area during the year 2024-25
Read moreDe-silting of lachagudem cheruvu under community development, emp of koc-ii, expansion project, yellandu area
De-silting of lachagudem cheruvu under community development, emp of koc-ii, expansion project, yellandu area
Read moreRaising of gkoc, 10 ha kgm area
Raising and 1st year maintenance of ob dump plantation of 10 ha at gkoc of kothagudem area during the year 2025-27
Read moreof your Industry type