Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Part Balance Civil Works Of Sg 1 Package I.E. Construction Of Heavy Duty Paving/Road, Drains/Precast, Laying Hume Pipes Between Esp 1 And Esp 2 And Sump Of Mrs Trench At Lhs Etc.
|
Description |
Part Balance Civil Works Of Sg 1 Package I.E. Construction Of Heavy Duty Paving/Road, Drains/Precast, Laying Hume Pipes Between Esp 1 Esp 2 And Sump Of Mrs Trench At Lhs Etc. At 2 X800 Mw Ntpc Ramagundam Stpp, Karimnagar Telangana
|
Organisation | Bharat Heavy Electricals Limited (BHEL) |
Tender Id | 2023_BHEL_29791_1 |
Reference Number |
BHE/PW/PUR/RGMT- SG-1/Part Civil Work-B/0018 |
Tender Fee | 0 |
EMD | 0 |
Tender Value | |
Place | Ramagundam |
Link | https://eprocurebhel.co.in |
Start Date | October 27, 2023 18:30 |
End Date |
01/11/2023 ( Expired 611 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Internal improvement works of section no. s-408 (package-5) for water supply scheme 1. khuban and modi khera, block abohar, distt. fazilka (under nabard xxvii/jjm)
Repair of old ohsr (250 cum), repair of pump chamber 6.10m x 4.88m, distribution system, providing and fixing household connection and site laying at head works (boundary wall, footpath etc.) complete in all respect and all other works contgent the
Read moreOfc laying /t-066/ karnal and kurukshetra oa (part of karnal ba)
E-tender for laying plb pipe/ duct and associated works by open trench method/trenchless technology, optical fibre cable pulling/blowing and splicing works etc., for 4g ferberization ,rehabilitation work in karnal an kurukshetra oa part of karnal ba
Read morePackage 1 of nagar nigam ayodhya sewerage scheme district-1 part-ii and district-1 part-i zone-1 and 2
Surveying soil investigation design and supply of all materials labour t and p etc. complete required for completion of following works of package 1 of nagar nigam ayodhya sewerage scheme district 1 part ii and district 1 part i zone 1 and 2
Read morePackage 2 of nagar nigam ayodhya sewerage scheme district-1 part-ii and district-1 part-i zone-1
Surveying soil investigation design and supply of all materials labour t and p etc. complete required&#x0d for completion of following works of package 2 of nagar nigam ayodhya sewerage scheme district 1&#x0d part ii and district 1 part i zone 1 and 2
Read moreProviding pump foundation, pump shed, handling and laying of hume pipes, including other protective works etc. for monsoon at rampur batura ocp under sohagpur area
Providing pump foundation, pump shed, handling and laying of hume pipes, including other protective works etc. for monsoon at rampur batura ocp under sohagpur area
Read moreGeneral mck 2024 25 running contract for maintenance of various quarters at govt. medical college kottayam under section 1 general civil work
The provisions included in the estimate are clearing drains various plumbing works and sanitary works removing broken tiles and laying new ones constructing manholes and septic tanks clearing filled up manhole waterproofing works patch plaste
Read moreGeneral annual plan 2024-25 government lp school pattikkad balance works for the completion of the construction of school building for government l p school pattikkad in manjeri lac malappuram district general civil work 1
Construction of second floor above the existing&#x0d buiding, a grill covered sheet roofed third&#x0d floor(for temperorally arranging play school for&#x0d childrens), finishing works of all floors, main&#x0d gate, compound walls, septic tank, sump and&#x0d soakpit etc
Read moreCivil and electrical works for developing cusat as international centre of excellence in academics and research. package 1, part b
Package 1, part b, construction of international guest house, engineering block and facilitation centre at main campus balance work
Read moreCivil and electrical works for developing cusat as international centre of excellence in academics and research. package 1, part c
Package 1, part c, campus rejuvenation, external water supply, drainage works and waste management balance work
Read moreDarauli renovation of boosting station and laying of pipeline with fhtc balance work of rohrai with water works i.e v-notch, ceramic tiles, painting , centering and shuttering brick work cement plaster, polythin sheet etc complete in all respcect.
Darauli renovation of boosting station and laying of pipeline with fhtc balance work of rohrai with water works i.e v-notch, ceramic tiles, painting , centering and shuttering brick work cement plaster, polythin sheet etc complete in all respcect.
Read moreof your Industry type