Tender Details
Particulars | Details |
---|---|
Title |
Electrification Work In The Department Of English Mechanical Engineering Saic And Computer Science And Engineering At Tezpur University Campus Napaam
|
Description |
Electrical Works
|
Organisation | Tezpur University | Central Govt. Ministry/Department |
Tender Id | 2024_TEZU_794529_1 |
Reference Number |
TU/EC/ELECTRICAL/429/2023-24 Dated 08-02-2024 |
Tender Fee | 500 |
EMD | 4340 |
Tender Value | |
Place | Tezpur University Tezpur Assam |
Link | https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=835090 |
Start Date | February 09, 2024 00:00 |
End Date |
06/03/2024 ( Expired 435 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of fob at km 6.420 (amity university), grade separated structures/flyover at km 7.965 and 8.075 (riico kant kalwar), 11.780 (achrol) and 25.300 (kukas) with slip road on nh-248 for rectification of identified blackspots/accident spots in
Construction of fob at km 6.420 (amity university), grade separated structures/flyover at km 7.965 and 8.075 (riico kant kalwar), 11.780 (achrol) and 25.300 (kukas) with slip road on nh-248 for rectification of identified blackspots/accident spots in
Read moreRectification at morth identified blackspots on mahua-jaipur section of nh 21 in the state of rajasthan on engineering, procurement and construction (epc) mode
Rectification at morth identified blackspots on mahua-jaipur section of nh 21 in the state of rajasthan on engineering, procurement and construction (epc) mode
Read moreConstruction of railway rob at km. 3.485 along parali bypass road on nh 548b in the state of maharashtra. work under contractors risk and cost.
Construction of railway rob at km. 3.485 along parali bypass on deogaon fata _pathari _sonpeth_parali_ambajogai_renapur fata_latur_omerga road nh 548b in the state of maharashtra. work under contractors risk and cost.
Read moreBeautification and boundrywall and light and gate construction work at ward no 15 in front of piyush choudhry house municipal council narmadapuram mp.
Beautification and boundrywall and light and gate construction work at ward no 15 in front of piyush choudhry house municipal council narmadapuram mp.
Read moreSupply and stacking of various materials for construction of approach road at km 121.730, km 127.270 and km 156.120 on sairang-tuipuibari road for permanent and surf work like gsb, wbm, dbm and bc work under project pushpak in mizoram state
Supply and stacking of various materials for construction of approach road at km 121.730, km 127.270 and km 156.120 on sairang-tuipuibari road for permanent and surf work like gsb, wbm, dbm and bc work under project pushpak in mizoram state
Read moreCivil work for maintenance and accessibility in the service shafts of hospital blocks at aiims raipur
Civil work for maintenance and accessibility in the service shafts of hospital blocks at aiims raipur
Read moreConstruction of two nos of toilet blocks boys and girls in ghps school including electrification works in donimalai under csr work 2025-26
Construction of two nos of toilet blocks boys and girls in ghps school including electrification works in donimalai under csr work 2025-26
Read moreWork of installing led high mast at bajna bus stand in ward no. 21 and triveni mela ground in ward no. 22 of ratlam city.
Work of installing led high mast at bajna bus stand in ward no. 21 and triveni mela ground in ward no. 22 of ratlam city.
Read moreConstruction of infrastructure and development work at new itbp camp situated in lapthal valley approx. height 14694 ft and approx 126 km from joshimath, distt chamoli (ukd) connected by metalled road 98 km and 28 km kuchha road.
Construction of infrastructure and development work at new itbp camp situated in lapthal valley approx. height 14694 ft and approx 126 km from joshimath, distt chamoli (ukd) connected by metalled road 98 km and 28 km kuchha road.
Read moreC/o infrastructure and other development work at rangmanch gad 15016 feet above msl upto 6 feet snow accumulation in winter and the site distance is 169 km from uttarkashi by road upto sumla and 20km on ops track upto rangmachgad post of 35th bn ukd
C/o infrastructure and other development work at rangmanch gad 15016 feet above msl upto 6 feet snow accumulation in winter and the site distance is 169 km from uttarkashi by road upto sumla and 20km on ops track upto rangmachgad post of 35th bn ukd
Read moreof your Industry type