Tender Details
Particulars | Details |
---|---|
Title |
Consumables Bdt V 31 Rr5000 And Seq Buffer Each
|
Description |
Consumables Bdt V 31 Rr5000 And Seq Buffer Each
|
Organisation | Council of Scientific and Industrial Research | Central Govt. Ministry/Department |
Tender Id | 2024_CSIR_740605_1 |
Reference Number |
IMT/7(7)/2023-PUR440 |
Tender Fee | 0 |
EMD | 0 |
Tender Value | |
Place | The Director, CSIR-IMTECH, Chandigarh |
Link | https://eprocure.gov.in/epublish/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1043613 |
Start Date | January 05, 2024 23:30 |
End Date |
16/01/2024 ( Expired 513 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Dye penetrant kit consisting of red dye penetrant, remover/ cleaner & developer in the ratio 1:4:4 in a set. visibility-type-ii, washability-method-c, sensitivity-level-2, as per rdso s specification no. m&c/ndt/105/2001 of april 2001 or latest. (each can capacity 500ml and content 400ml net) drawing & specification : as per annexure a.
For complete deion and other details, please refer to tender
Read moreProcurement of consumables for agilent make dga and atomic absorption spectrophotometer at ntpc mouda
Procurement of consumables for agilent make dga and atomic absorption spectrophotometer at ntpc mouda
Read moreKothagudem thermal power station- stage-v (2x250mw)
Supply, erection, testing and commissioning of substation automation system (sas) scheme along with panel for 220kv switchyard having two main buses and one transfer bus with 15 bays 5 spare bays including mandatory spares under psd funds.
Read moreKothagudem thermal power station- stage-v (2x250mw)
Supply, erection, testing and commissioning of numerical bus bar protection relay scheme along with panels for 220kv switchyard having two main buses and one transfer bus with 15 bays 5 spare bays including mandatory spares under psd funds.
Read moreIe services during o and m phase for 4l kagvadar-una-kodinar-veraval section of nh8e from km 139.915 to km 222.400 and km 230.00 to km 263.00 on ham and kodinar bypass km 222.40 to km 230.00 on item rate in state of gujarat (pkg-iv, v, vi-a, vi-b)
Ie services during o and m phase for 4l kagvadar-una-kodinar-veraval section of nh8e from km 139.915 to km 222.400 and km 230.00 to km 263.00 on ham and kodinar bypass km 222.40 to km 230.00 on item rate in state of gujarat (pkg-iv, v, vi-a, vi-b)
Read moreMsw processing and disposal facility for dry and wet waste of capacity 7.5 tone each in nagar palika parishad badnagar
Msw processing and disposal facility for dry and wet waste of capacity 7.5 tone each in nagar palika parishad badnagar
Read moreIndependent engineer services during o and m for 6 lane ahmedabad-vadodara section of nh-48 from km 6.400 to km 108.700 (102.3 km) and ahmedabad-vadodara expressway ne-1 from km 0.000 to km 93.302 (93.302 km) in the state of gujarat nhdp-v dbfot toll
Independent engineer services during o and m for 6 lane ahmedabad-vadodara section of nh-48 from km 6.400 to km 108.700 (102.3 km) and ahmedabad-vadodara expressway ne-1 from km 0.000 to km 93.302 (93.302 km) in the state of gujarat nhdp-v dbfot toll
Read moreProv and lay of wmm 100 mm thk,02 layers of wmm 75 mm thk, dbm 50 mm thk and bc 30 mm thk incl appli of prime and tack coat with bt emul for surf wks bet km 0.00 and km 5.00 and km 10.900 and 11.850 on road bhawani dharal of 31 tf under (p)sampark jk
Prov and lay of wmm 100 mm thk,02 layers of wmm 75 mm thk, dbm 50 mm thk and bc 30 mm thk incl appli of prime and tack coat with bt emul for surf wks bet km 0.00 and km 5.00 and km 10.900 and 11.850 on road bhawani dharal of 31 tf under (p)sampark jk
Read moreCertain b/r repairs work to joinery, plumbing, flooring, sunken treatment etc of otm accn in inf bn v and vi under age b/r-i at ge gurdaspur.
Certain b/r repairs work to joinery, plumbing, flooring, sunken treatment etc of otm accn in inf bn v and vi under age b/r-i at ge gurdaspur.
Read moreImplementation of ngr bypass scheme of 420kv, 63mvar fixed line reactor of each 400kv d/c bongaigaon-balipara-iii and iv line into switchable line reactor at powergrid, 400kv bongaigaon substation under expansion scheme- xxv part-b
Implementation of ngr bypass scheme of 420kv, 63mvar fixed line reactor of each 400kv d/c bongaigaon-balipara-iii and iv line into switchable line reactor at powergrid, 400kv bongaigaon substation under expansion scheme- xxv part-b (neres-xxv part-b)
Read moreof your Industry type