Tender Details

Particulars Details
Title
Execution And Commissioning Of Balance Psi Works Between Rjn Kav Section In Connection With Rjn Ngp 3rd Line Work In Nagpur Division Over Sec Railway.
Description
For Complete Deion And Other Details, Please Refer To Tender
Organisation Ministry of Railways | Central Govt. Ministry/Department
Tender Id 78393950
Reference
Number
08-Tender-El-C-SECR-BSP
Tender Fee 0
EMD 2.68 Lakh
Tender Value
Place Bilaspur
Link https://www.ireps.gov.in/ireps/works/pdfdocs/012025/78393950/viewNitPdf_4769211.pdf
Start Date December 09, 2024 18:27
End Date

03/01/2025 ( Expired 129 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Construction of 220kv and 132kv transmission lines associated with 220kv gss betina (dist jaisalmer) in raj incl. survey, supply of all equipment/materials, erection (incl. civil work), testing and commissioning (turnkey project) bn9019002503

Construction of 220kv and 132kv transmission lines associated with 220kv gss betina (dist jaisalmer) in raj incl. survey, supply of all equipment/materials, erection (incl. civil work), testing and commissioning (turnkey project) bn9019002503

Read more
Consultancy services for authoritys engineer for supervision of work of rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to 2l with ps in the state of madhya pradesh on epc mode

Consultancy services for authoritys engineer for supervision of work of rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to 2l with ps in the state of madhya pradesh on epc mode

Read more
Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode

Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode

Read more
Maintenance work of jabalpur - hiran river section of nh-12 from existing km. 11.4 to 66.4 (design chainage 10.400 to 66.000) in the state of madhya pradesh to four lanes with paved shoulders under nhdp-iii on epc mode on the risk and cost of the epc

Maintenance work of jabalpur - hiran river section of nh-12 from existing km. 11.4 to 66.4 (design chainage 10.400 to 66.000) in the state of madhya pradesh to four lanes with paved shoulders under nhdp-iii on epc mode on the risk and cost of the epc

Read more
Strengthening and bituminous overlay along with other rectification activities-drain cover replacement, kerb raising, mbcb replacement, painting etc. of orai bhognipur barah section on bot (annuity) basis in the state of up-3rd call

Strengthening and bituminous overlay along with other rectification activities-drain cover replacement, kerb raising, mbcb replacement, painting etc. of orai bhognipur barah section on bot (annuity) basis in the state of up-3rd call

Read more
Construction of 2-lane rob at lc no.ab-27 (belbahara rob) on manendragarh to ambikapur section of nh-43 (old nh-78) at nh km 264.000 and railway chainage 937.14-15 between udalkachar-boridand stations in the state of chhattisgarh

Construction of 2-lane rob at lc no.ab-27 (belbahara rob) on manendragarh to ambikapur section of nh-43 (old nh-78) at nh km 264.000 and railway chainage 937.14-15 between udalkachar-boridand stations in the state of chhattisgarh

Read more
Vac, tvs along with electrical and scada works for 16 ug stations in corridor-3 of phase-2 cmrl project including tunnel and ramp sections between the stations

Vac, tvs along with electrical and scada works for 16 ug stations in corridor-3 including tunnel and ramp sections between the stations

Read more
Rectification and balance work of 8l delhi vadodara greenfield alignment section pkg-13 of nh 148n on epc mode under bharatmala pariyojana in the state of rajasthan on risk and cost of contractor

Rectification and balance work of 8l delhi vadodara greenfield alignment section pkg-13 of nh 148n on epc mode under bharatmala pariyojana in the state of rajasthan on risk and cost of contractor

Read more
Construction of balance work in punch lists of ajanta buldhana section of nh753e from km 0.00 to 49.130 in the state of maharashtra on risk and cost of contractor

Construction of balance work in punch lists of ajanta buldhana section of nh753e from km 0.00 to 49.130 in the state of maharashtra on risk and cost of contractor

Read more
Work of prion measures for seepages in tunnel, on risk and cost basis of contractor under rehabilitation and upgradation of kashedi ghat section of nh-17 new nh-66 to four lanes with paved shoulder from existing km. 148.000 to 161.600 including

Work of prion measures for seepages in tunnel, on risk and cost basis of contractor under rehabilitation and upgradation of kashedi ghat section of nh-17 new nh-66 to four lanes with paved shoulder from existing km. 148.000 to 161.600 including

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise