Tender Details
Particulars | Details |
---|---|
Title |
Providing And Laying Of Ilp Work In (Southern Side) Modern Fish Market At Loop Road In Division 125, Unit 25, Zone 9
|
Description |
Providing And Laying Of Ilp Work In (Southern Side) Modern Fish Market At Loop Road In Division 125, Unit 25, Zone 9
|
Organisation | Corporation of Chennai | State Govt. and UT |
Tender Id | 2024_CoC_503745_1 |
Reference Number |
Z.O.9.C.No.E1/07712/2024 |
Tender Fee | 0 |
EMD | 7800 |
Tender Value | |
Place | Zone 9 (Nungambakkam) |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=599075 |
Start Date | November 22, 2024 23:30 |
End Date |
27/11/2024 ( Expired 168 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Providing road safety measures at morth/police identified locations based on accident data of 2017-19,2018-20 and 2019-21 from km.34.144 (kothur) to km.80.306 (jadcherla) of hyderabad bangalore section of nh-44 in the state of telangana
Providing road safety measures at morth/police identified locations based on accident data of 2017-19,2018-20 and 2019-21 from km.34.144 (kothur) to km.80.306 (jadcherla) of hyderabad bangalore section of nh-44 in the state of telangana
Read moreConstruction of railway rob at km. 3.485 along parali bypass road on nh 548b in the state of maharashtra. work under contractors risk and cost.
Construction of railway rob at km. 3.485 along parali bypass on deogaon fata _pathari _sonpeth_parali_ambajogai_renapur fata_latur_omerga road nh 548b in the state of maharashtra. work under contractors risk and cost.
Read moreRepair and maintenance of boundary wall from the main gate to market area and different places in dvc colony at tilaiya dam,t.k. division konar
Repair and maintenance of boundary wall from the main gate to market area and different places in dvc colony at tilaiya dam,t.k. division konar
Read moreSupply and stacking of various materials for special restoration of monsoon damages (2024-25) at various locations between km 31.450 to km 33.906 and km 91.300 to km 130.008 on sairang-tuipuibari road for permanent work and between km 124.086 to km 1
Supply and stacking of various materials for special restoration of monsoon damages (2024-25) at various locations between km 31.450 to km 33.906 and km 91.300 to km 130.008 on sairang-tuipuibari road for permanent work and between km 124.086 to km 1
Read moreNfn/civil/666/2025/03 dated 12/05/2025 providing and laying of pavers on truck / tankers moving area in nitric acid plant inside factory area of nfl nangal unit
Nfn/civil/666/2025/03 dated 12/05/2025 providing and laying of pavers on truck / tankers moving area in nitric acid plant inside factory area of nfl nangal unit
Read more06/4
Construction of approach road and other allied works at kultali glr under augmentation of laying distribution system to extend the benefit of 100 p household in zone-i at kultali block within mega surface water based supply scheme of falta-mathurapur
Read moreProviding and laying and compaction of wbm, sand blanketing, ilcb (m50 grade) and casting of edge block in between km 0.910 to km 12.00 on nelya- dhaula road for surfacing works under 42 brtf of project vartak in arunachal pradesh
Providing and laying and compaction of wbm, sand blanketing, ilcb (m50 grade) and casting of edge block in between km 0.910 to km 12.00 on nelya- dhaula road for surfacing works under 42 brtf of project vartak in arunachal pradesh
Read moreConstruction of infrastructure and development work at new itbp camp situated in lapthal valley approx. height 14694 ft and approx 126 km from joshimath, distt chamoli (ukd) connected by metalled road 98 km and 28 km kuchha road.
Construction of infrastructure and development work at new itbp camp situated in lapthal valley approx. height 14694 ft and approx 126 km from joshimath, distt chamoli (ukd) connected by metalled road 98 km and 28 km kuchha road.
Read moreC/o infrastructure and other development work at rangmanch gad 15016 feet above msl upto 6 feet snow accumulation in winter and the site distance is 169 km from uttarkashi by road upto sumla and 20km on ops track upto rangmachgad post of 35th bn ukd
C/o infrastructure and other development work at rangmanch gad 15016 feet above msl upto 6 feet snow accumulation in winter and the site distance is 169 km from uttarkashi by road upto sumla and 20km on ops track upto rangmachgad post of 35th bn ukd
Read moreRepair maint of sewage line septic tank manhole stp incl cleaning work of drain in rwa and zone 7 at new cantt under ge gangtok
Repair maint of sewage line septic tank manhole stp incl cleaning work of
 drain in rwa and zone 7 at new cantt 
 under ge gangtok
Read moreof your Industry type