Tender Details

Particulars Details
Title
Providing And Laying Of Ilp Work In (Southern Side) Modern Fish Market At Loop Road In Division 125, Unit 25, Zone 9
Description
Providing And Laying Of Ilp Work In (Southern Side) Modern Fish Market At Loop Road In Division 125, Unit 25, Zone 9
Organisation Corporation of Chennai | State Govt. and UT
Tender Id 2024_CoC_503745_1
Reference
Number
Z.O.9.C.No.E1/07712/2024
Tender Fee 0
EMD 7800
Tender Value
Place Zone 9 (Nungambakkam)
Link https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=599075
Start Date November 22, 2024 23:30
End Date

27/11/2024 ( Expired 168 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Providing road safety measures at morth/police identified locations based on accident data of 2017-19,2018-20 and 2019-21 from km.34.144 (kothur) to km.80.306 (jadcherla) of hyderabad bangalore section of nh-44 in the state of telangana

Providing road safety measures at morth/police identified locations based on accident data of 2017-19,2018-20 and 2019-21 from km.34.144 (kothur) to km.80.306 (jadcherla) of hyderabad bangalore section of nh-44 in the state of telangana

Read more
Construction of railway rob at km. 3.485 along parali bypass road on nh 548b in the state of maharashtra. work under contractors risk and cost.

Construction of railway rob at km. 3.485 along parali bypass on deogaon fata _pathari _sonpeth_parali_ambajogai_renapur fata_latur_omerga road nh 548b in the state of maharashtra. work under contractors risk and cost.

Read more
Repair and maintenance of boundary wall from the main gate to market area and different places in dvc colony at tilaiya dam,t.k. division konar

Repair and maintenance of boundary wall from the main gate to market area and different places in dvc colony at tilaiya dam,t.k. division konar

Read more
Supply and stacking of various materials for special restoration of monsoon damages (2024-25) at various locations between km 31.450 to km 33.906 and km 91.300 to km 130.008 on sairang-tuipuibari road for permanent work and between km 124.086 to km 1

Supply and stacking of various materials for special restoration of monsoon damages (2024-25) at various locations between km 31.450 to km 33.906 and km 91.300 to km 130.008 on sairang-tuipuibari road for permanent work and between km 124.086 to km 1

Read more
Nfn/civil/666/2025/03 dated 12/05/2025 providing and laying of pavers on truck / tankers moving area in nitric acid plant inside factory area of nfl nangal unit

Nfn/civil/666/2025/03 dated 12/05/2025 providing and laying of pavers on truck / tankers moving area in nitric acid plant inside factory area of nfl nangal unit

Read more
06/4

Construction of approach road and other allied works at kultali glr under augmentation of laying distribution system to extend the benefit of 100 p household in zone-i at kultali block within mega surface water based supply scheme of falta-mathurapur

Read more
Providing and laying and compaction of wbm, sand blanketing, ilcb (m50 grade) and casting of edge block in between km 0.910 to km 12.00 on nelya- dhaula road for surfacing works under 42 brtf of project vartak in arunachal pradesh

Providing and laying and compaction of wbm, sand blanketing, ilcb (m50 grade) and casting of edge block in between km 0.910 to km 12.00 on nelya- dhaula road for surfacing works under 42 brtf of project vartak in arunachal pradesh

Read more
Construction of infrastructure and development work at new itbp camp situated in lapthal valley approx. height 14694 ft and approx 126 km from joshimath, distt chamoli (ukd) connected by metalled road 98 km and 28 km kuchha road.

Construction of infrastructure and development work at new itbp camp situated in lapthal valley approx. height 14694 ft and approx 126 km from joshimath, distt chamoli (ukd) connected by metalled road 98 km and 28 km kuchha road.

Read more
C/o infrastructure and other development work at rangmanch gad 15016 feet above msl upto 6 feet snow accumulation in winter and the site distance is 169 km from uttarkashi by road upto sumla and 20km on ops track upto rangmachgad post of 35th bn ukd

C/o infrastructure and other development work at rangmanch gad 15016 feet above msl upto 6 feet snow accumulation in winter and the site distance is 169 km from uttarkashi by road upto sumla and 20km on ops track upto rangmachgad post of 35th bn ukd

Read more
Repair maint of sewage line septic tank manhole stp incl cleaning work of drain in rwa and zone 7 at new cantt under ge gangtok

Repair maint of sewage line septic tank manhole stp incl cleaning work of&#x0d drain in rwa and zone 7 at new cantt &#x0d under ge gangtok&#x0d

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise