Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Bhavnagar Division : Construction Of Lhs At Level Crossing No. 111 At Km. 10/2 3 Between Surendranagar Dhola In Prcl Line.
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 77525652 |
Reference Number |
109-2024-25 |
Tender Fee | 0 |
EMD | 4.65 Lakh |
Tender Value | |
Place | Mumbai |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/102024/77525652/viewNitPdf_4722044.pdf |
Start Date | September 24, 2024 00:37 |
End Date |
15/10/2024 ( Expired 266 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of proposed r.o.b. and its approaches in replacement of existing level crossing no.21x at km ch.107/500 of nh 64 district anand in the state of gujarat
Construction of proposed r.o.b. and its approaches in replacement of existing level crossing no.21x at km ch.107/500 of nh 64 district anand in the state of gujarat
Read moreWidening a upgradation of road from 2 lane with ps to 4 lane with ps for rectification of blackspot id no. pb 03 186 at location km. 154.310 rureke kalan on nh703 in the state of punjab job no rureke kalan on nh 703 punjab 2024 25 rse 33 including ut
Widening and upgradation of road from 2 lane with ps to 4 lane with ps for rectification of blackspot id no. pb 03 186 at location km. 154.310 rureke kalan on nh703 in the state of punjab job no rureke kalan on nh 703 punjab 2024 25 rse 33 including
Read moreOperation and maintenance of stp plants at chtp, sltp, gtni, ajg, hcc metro station and sultanpur depot and etp plant at sultanpur depot and wtp at sultanpur depot and gurugram staff quarter in line-2 south(for 3 years).
Operation and maintenance of stp plants at chtp, sltp, gtni, ajg, hcc metro station and sultanpur depot and etp plant at sultanpur depot and wtp at sultanpur depot and gurugram staff quarter in line-2 south(for 3 years).
Read moreConstruction of cc road at ward 3 vallabh nagar gali no. 3 in sachin yadav house to jyoti gangle house.
Construction of cc road at ward 3 vallabh nagar gali no. 3 in sachin yadav house to jyoti gangle house.
Read moreWater supply scheme at amarpur sub-division hospital/sh-construction of 1(one) no. semi permanent pump house, providing and laying distribution pipeline in/c. necessary fittings, sluice valves, hydrant post and platforms, supplying and installation o
Water supply scheme at amarpur sub-division hospital/sh-construction of 1(one) no. semi permanent pump house, providing and laying distribution pipeline in/c. necessary fittings, sluice valves, hydrant post and platforms, supplying and installation o
Read moreAncillary work in connection with construction of 50 bedded critical care block g plus 3 at malda medical college and hospital under malda division, pwd in the district of malda.
Ancillary work in connection with construction of 50 bedded critical care block g plus3 at malda medical college and hospital under malda division, pwd in the district of malda.
Read moreConstruction of rob with approaches in lieu of railway crossing lc 20 on nh 161h at km 24.913 in the state of maharashtra on epc mode
Construction of rob with approaches in lieu of railway crossing lc 20 on nh 161h at km 24.913 in the state of maharashtra on epc mode
Read moreConstruction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Read moreof your Industry type