Title
General Emergency Mp Rbc Urgent Removal Of Rock By Blasting And Stacking Stone To The Edges At Rbc Main Canal Ch 6/200 Km And Removing Top Slabs And Cleaning Of Cut Cover At Ch 6/100 Km General Civil Work
Description
Big Rock Was Fallen From The Right Side Bund&Amp#X0d Of Rbc Main Canal At Ch 6/200 Km. Since The&Amp#X0d Region Was High Cutting Area, Rock Was Only&Amp#X0d Found During Canal Cleaning Process.As The&Amp#X0d Rock Was Huge And It Will Cause Obstruction For&Amp#X0d Water Distributi
Organisation Irrigation Department | State Govt. and UT
Tender Id 2025_Irrig_754560_1
Reference
Number
IRR/PI/TR/7925/2024_5_1_1/1
Tender Fee 555
EMD 2531
Tender Value -
Place Malampuzha
Link
View Original Tender Notice

https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1225127

Start Date March 24, 2025 21:50
End Date
Expired 03/04/2025

Expired 557 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Removing the existing cut stone slabs and formation of cc road at pallanandhavanam near sintex tank

Removing the existing cut stone slabs and formation of cc road at pallanandhavanam near sintex tank

Read more
General-nip- urgent maintenace of shutters and reconstruction of shutter operating slabs and abutment of rbc, vizhinjam, marukil, vellayani north, and vellayani east branch channel-general civil work

General-nip- urgent maintenace of shutters and reconstruction of shutter operating slabs and abutment of rbc, vizhinjam, marukil, vellayani north, and vellayani east branch channel-general civil work

Read more
Mp-rbc-cada work urgent rectification works to the cada channel b/w ch 0/200km to 0/500km ing from the sluice at ch 19/820km of rbmc

The provisions included in this estimate are&amp#x0d demolishing of concrete, earthwork excavation, cc&amp#x0d 1 4 8 using 40 mm for bed foundation,cc&amp#x0d 1 3 6 using 20 mm b stone for side walls, cc 1 2 4&amp#x0d using 20 mm b stone for wearing coat, rcc in&amp#x0d 1 1.5 3

Read more
General-mp-rbc-ap-2023-24- -urgent rectification work to hand rails of bridges crossing main canal at ch 16/469 and ch 19/920 of rbmc-general civil work

This work has been included under the action&amp#x0d plan 2023-24 of the malampuzha project. the&amp#x0d fs for the work has been obtained vide order&amp#x0d no wp5-2702/np/2023-24 mp dated&amp#x0d 07/07/2023 of the ce, p-1, kozhikode.the&amp#x0d estimate is prepared for

Read more
General-mp-rbc- ap-2023-24- -urgent rectification work to hand rails of bridges crossing main canal at ch 16/469 and ch 19/920 of rbmc-general civil work

The estimate includes demolishing rr, cc wall, earthwork ,cc1 4 8, centring shuttering, cc 1 2 4, rcc 1 2 4, structural steel work for hand rails and plastering. the estimate has been prepared based on dsor 2018 with cost index of

Read more
General- cpp- mrbc- maintenance of canal shutters- urgent repair works to kunnumpidari eri shutter of ch. 9900 of rbmc, kuttipallam malakkad and kuttipallam kada shutter of moolathara rbc under rbc section no.1, kozhinjampara- general mechanical work

General-cpp-mrbc-maintenance of canal&amp#x0d shutters- urgent repair works to kunnumpidari&amp#x0d eri shutter of ch. 9900 of rbmc,kuttipallam&amp#x0d malakkad and kuttipallam kada shutter of&amp#x0d moolathara rbc under rbc section no.1, kozhinjampara- general mechanical work

Read more
General-mp- rbc-2023-24-modernisation of cada field channel -urgent works to cada from the ch 0/850 of puduppariyaram branch canal -general civil work

Field channel-urgent works to cada starting from the ch0/850 km of akathethara panchayath.the estimate is prepared for urgent rectification works to the cada channel.the present situation is that,the channel is not lined as a result te

Read more
Mp-rbc-ap-2023-24-urgent repair work to kavilpad bc at tailend -ch 7/00 km for 2023-24 second crop and 2024 f c-gcw

The tailend portion of the kalivpad branch&amp#x0d canal is mostly water logged, so wetness exist&amp#x0d in the canal. the foundation earth is marshy&amp#x0d bulky soil, thus quarry muck is provided in the&amp#x0d estimate as bed firming is required.