Tender Details

Particulars Details
Title
Excavation And Construction Of Kalu Busty Playground Margarets Hope Gp, Sonada.
Description
Excavation And Construction Of Kalu Busty Playground Margarets Hope Gp, Sonada.
Organisation GORKHALAND TERRITORIAL ADMINISTRATION | State Govt. and UT
Tender Id 2024_GTA_750509_1
Reference
Number
08(2nd Call)(NIeT)/PRDD (15CFC/ZP/UtF)/GTA/2024-25
Tender Fee 0
EMD 36247
Tender Value -
Place Margarets Hope G.P.
Link
View Original Tender Notice

https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1658771

Start Date September 13, 2024 14:30
End Date
Expired 26/09/2024

Expired 693 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Construction of playground in block campus kudhani (turki) in nagar panchayat turki-kudhani in ward no-6 under mmssvy

Construction of playground in block campus kudhani (turki) in nagar panchayat turki-kudhani in ward no-6 under mmssvy

Read more
Construction of rcc drain with rcc culvert and sump room for conveyance system and construction of boundary wall at igc aurangabad (phase-i)

Construction of rcc drain with rcc culvert and sump room for conveyance system and construction of boundary wall at igc aurangabad (phase-i)

Read more
Construction of rcc walls and supplying and laying of brick bat media for wetland at nit puducherry, karaikal

Construction of rcc walls and supplying and laying of brick bat media for wetland at nit puducherry, karaikal

Read more
Supplying all materials at site including pipes, specials, labors, tools and tackles etc. for laying and jointing of ms pipe for conveying main as per latest is specification. lowering of ms pipes and specials in trenches up to a depth of 3 m below gl. laying and jointing the same inside the trench/ over the ground by means of electric arch welding (spirally welded) using standard electrodes as per latest is specification including earth work in excavation in all kind of soil so as to give one m

Supplying all materials at site including pipes, specials, labors, tools and tackles etc. for laying and jointing of ms pipe for conveying main as per latest is specification. lowering of ms pipes and specials in trenches up to a depth of 3 m below gl. laying and jointing the same inside the trench/ over the ground by means of electric arch welding (spirally welded) using standard electrodes as per latest is specification including earth work in excavation in all kind of soil so as to give one meter average cover over the pipe with disposal of excavated earth within initial lead and lift with disinfection of pipes, testing of pipes against 60 m water head etc. to protect against corrosion pipes are given epoxy lining or hot applied coal tar/ asphalt lining or rich cement mortar lining at works or in the field by the centrifugal process. the outer coating for pipe may be in cement sand guniting or hot applied coal- tar asphaltic enamel reinforced with fibre glass fabric yarn as per cpheeo manual of water supply and treatment all complete job as per standard specification. 600 mm dia (minimum thickness- 6.40 mm)

Read more
Construction of compound wall inner flooring and drain with culvert at pathapalayam panchayat

Construction of compound wall inner flooring and drain with culvert at pathapalayam panchayat

Read more
Construction of proposed centre of excellence of fire testing, training and research laboratory at iit patna, bihar (on epc basis)

Construction of proposed centre of excellence of fire testing, training and research laboratory at iit patna, bihar (on epc basis)

Read more
Providing electrification arrangements of various port buildings renovation and construction by the civil department

Providing electrification arrangements of various port buildings renovation and construction by the civil department

Read more
Construction of prefabricated/ pre-engineered pota cabin in jail on epc (engineering procurement and construction) basis at muzaffarpur central jail, hajipur divisional jail and sitamarhi, divisional jail. (total no of cabin = 03 nos)

Construction of prefabricated/ pre-engineered pota cabin in jail on epc (engineering procurement and construction) basis at muzaffarpur central jail, hajipur divisional jail and sitamarhi, divisional jail. (total no of cabin = 03 nos)

Read more
Dismantling of old drain and pcc road and construction of new rcc drain and pcc road from infront of house of mandev ji to sanjiv via house of santosh shah in ward no. 21 under nagar parishad gopalganj.

Dismantling of old drain and pcc road and construction of new rcc drain and pcc road from infront of house of mandev ji to sanjiv via house of santosh shah in ward no. 21 under nagar parishad gopalganj.

Read more
Dismantling of old drain and construction of new r.c.c drain and p.c.c road from house of rajeshwar dubey to house of malviye in ward no. 04 under nagar parishad gopalganj.

Dismantling of old drain and construction of new r.c.c drain and p.c.c road from house of rajeshwar dubey to house of malviye in ward no. 04 under nagar parishad gopalganj.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise