Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Consumables For Soil Mechanics Lab
|
| Description |
|
| Organisation | Department of Higher Education | Ministry of Education |
| Tender Id | GEM/2024/B/5335502 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | August 28, 2024 19:17 |
| End Date |
Expired
18/09/2024
Expired 745 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Technical Evaluation Results
| S.No. | Seller Name | Offered Item | Participated On | MSE/MII Status | Status |
|---|---|---|---|---|---|
| 1 | KRISHNA ENTERPRISES | Make : KE Model : KE Title : Consumables for soil mechanics lab | 15-09-2024 12:30:45 | MII MSE | Qualified |
| 2 | LEADING EDGE LAB EQUIPMENTS | Make : NA Model : LELE/Soilconsumables Title : Consumables for soil mechanics lab | 17-09-2024 15:48:29 | MII | Qualified |
| 3 | RELIABLE LAB EQUIPMENT CO. | Make : RELIABLE LAB EQUIPMENT CO. Model : RLE Title : Consumables for soil mechanics lab | 18-09-2024 11:56:25 | MII MSE | Qualified |
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Read moreHiring of 2wd tyre mounted loader (backhoe) for 12 hrs availability, 250 hrs per month for a period of 2 years for rgoc-2
Hiring of 2wd tyre mounted loader (backhoe) for 12 hrs availability, 250 hrs per month for a period of 2 years for rgoc-2
Read moreFabrication, supply and installation of bus ducts and associated works for upgradation of power supply system for nrg facilities
Fabrication, supply and installation of bus ducts and associated works for upgradation of power supply system for nrg facilities
Read moreProcurement of medical equipments for hospitals in shimoga
Procurement of medical equipments for hospitals in shimoga
Read moreConsultancy services for dpr preparation for oti of nh-43, nh-543 and nh-45 (total length 25.15 km) in the state of madhya pradesh
Consultancy services for dpr preparation for oti of nh-43, nh-543 and nh-45 (total length 25.15 km) in the state of madhya pradesh
Read moreDate: 10.09.2026 rfp for construction arch in division no:chief engineer office, tsiic.
Date: 10.09.2026 rfp for construction arch in division no:chief engineer office, tsiic.
Read moreHiring of 2 nos. of diesel operated wheel mounted loaders with backhoe bucket (0.26 cu.m) and loading bucket (1.1 cu.m) for 36 months one at each section of pkoc, manuguru for improvement of quality of coal - reg.
Hiring of 2 nos. of diesel operated wheel mounted loaders with backhoe bucket (0.26 cu.m) and loading bucket (1.1 cu.m) for 36 months one at each section of pkoc, manuguru for improvement of quality of coal - reg.
Read moreSupply and commissioning of turbo ventilators for use at mws, kgm of sccl. in division no:corp-mp.
Supply and commissioning of turbo ventilators for use at mws, kgm of sccl. in division no:corp-mp.
Read moreTggenco-btps-stage-ii-unit.no.4-annual overhaul of tg set during the scheduled unit overhaul for the fy2026-27.
Tggenco-btps-stage-ii-unit.no.4-annual overhaul of tg set during the scheduled unit overhaul for the fy2026-27.
Read moreof your Industry type